ML20151A508

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/88-36 & 50-499/88-36 on 880516-0617 & Notice of Violation
ML20151A508
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/08/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20151A512 List:
References
NUDOCS 8807200022
Download: ML20151A508 (4)


See also: IR 05000498/1988036

Text

--

,

, ,

. ..

,

JUL 8 503

.

In Reply Refer To:

Dockets: 50-498/88-36

50-499/88-36

Houston Lighting & Power Company

ATTN: J. H. Goldberg, Group Vice

President, Nuclear

P.O. Box 1700

-Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Messrs. L. D. Gilbert and

W. M. McNeill of this office during the period May 16 through June 17, 1988, of

activities authorized by NRC Operating License NPF-76 and Construction

Permit CPPR-129 for the South Texas Project, Units 1 and 2, and to the

discussion of our findings with Mr. J. T. Westermeier, and other members of

'

your staff at the conclusion of the inspection.

Areas examined during the inspection included preservice inspection of

components and component supports far Unit 2. Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the NRC inspectors.

The inspection findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

Two unresolved items are identified in paragraphs 2.c and 2.d of the enclosed

inspection report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

b

M 2 gr

  • RIV:M&QPS * M&QPS *C:M&QPS qD :I C:DRP/D D:D

Nd LGilbert/cz WMCNeill IBarnes JLM i oan EHoller LJCallan

88

,8"

/88 / /88 / /8 'f/88t

r1/1/88 7 /e /88

g 1 , NCUR es

o3ca

MO C5 /88

  • Previously concurred if

+CO/

--

.- ,

. .

.

Houston Lighting & Power. Company -2-

Should you have any questions concerning tnis inspection, we will be pleased to

discuss them with you.

Sincerely,

Onginal Signed By

A. B. Beach

'L. J. Callan, Director

Division of Reactor Projects

'

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-498/88-36

50-499/88-36.

cc w/ enclosures:

Houston Lighting & Power Company Newman & Holtzinger, P.C.

ATTN: M. A. McBurnett, Manager ATTN: J. R. Newman, Esquire

Operations Support Licensing 1615 L Street, N.W.

P.O. Box 289 Washington, D.C. 20036

Wadsworth, Texas 77483

Houston Lighting & Pcwer Company

ATTN: Gerald E. Vaughn, Vice President

Nuclear Operations

P.O. Box 289

Houston, Texas 77001

Hoti.ston Lighting & Power Company

ATTN: S. L. Rosen

P.O. Box 289

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATTN: J. T. Westermeier, General Manager

South Texas Project

P.O. Box 289

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATTN: R. W. Chewning, Chairman

Nuclear Safety Review Board

P.O. Box 289

Wadsworth, Texas 77483

'.- ,

. .

.

-

..v

Houston Lighting & Power Company -3-

-Central Power & Light Company

ATTN: . R. L. Range /R. P. Verret

P.O. Box 2121'

Corpus Christi, Texas. 78403

City Public Service Board

ATTN: R. J. Costello/M. T. Hardt

P.O. Box 1771

San Antonio, Texas 78296

City ~ of Austin Electric Utility

ATTN: R. J. Miner, Chief Operating

Officer

721 Barton Springs Road

Austin, Texas 78704

Houston Lighting & Power Company

ATTN: Licensing Representative

Suite 610

Three Metro Center

Bethesda, Maryland 20814

Texas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • DRP *RRI-0PS

.R. D. Martin, RA *DRS

  • SectionChief(DRP/D) *RPB-DRSS
  • MIS System *RIV File

Lisa Shea, RM/ALF *RSTS Operator

R. Bachmann, 0GC *D. Hunnicutt

  • P. Kadambi, NRR Project Manager *L. Gilbert

G. F. Sanborn, E0 *W. McNeill

Jel Barnes

  • w/756

I

- _ _ .

-

- - - - . .

.

, ,

-. .

.

.

Houston Lighting & Power Company. -3-

Central Power & Light Company

ATTN: R. L. Range /R. P. Verret

P.O. Box 2121

Corpus.Christi, Texas 78403

City 'Public Service Board

ATTN:~ R. J. Costello/M. T. Hardt

-P.O. Box 1771-

San Antonio, Texas 78296

~

' City of Austin Electric Utility

ATTN: R. J. Miner, Chief Operating

Officer-

721 Barton Springs Road

Austin, Texas 78704

Houston Lighting & Power Company.

ATTN: Licensing Representative

Suite 610

Three Metro Center

Bethesda, Maryland .20814

Texas Radiation-Control Program Director

,

d

I

I