Monthly Operating Rept for June 1988 for Jm Farley Unit 1
ML20151A091
Person / Time
Site: Farley 
Issue date: 06/30/1988
From: Hairston W, Dennis Morey
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8807190242
Download: ML20151A091 (9)


Text

]

OPERATING DATA REPORT

,3 DOCKET No. 50-348 DATE 7/6/88 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 OPER% TING STA'IUS Notes

1. Unit Name:

Joseph M. Farley - Unit 1

2. Reporting Period:

June, 1988

1) Cumulative data since
3. Licensed Thermal Power (MWt):

2,652 12-1-77, date of

4. Nameplate Rating (Gross We):

860 commercial operation

5. Design Electrical Rating (Net MWe):

829

(

6. Maximum Dependable Capacity (Gross We):

852.6

7. Maximum Dependable Capacity (Net We):

812.6 l

8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. P6er Level To Which Restricted, If Any (Net We):

N/A

10. Reasons For Restrictions, If Any:

N/A

' Itis Month Yr-to-Date Cumulative

11. Hours In Reporting Period 720 4,367 92,759
12. Number Cf Hours Reactor Was Critical 702.6 3,022.7 68,23. 4
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650 T
14. Hours Generator On-Line 697.2 2,974.3 66,799.8 0.0 0.0
15. Unit Reserve Shutdown Hours 0.0~

7,562,887 169,986,206

16. Gross Thermal Energy Generated (MWH) 1,773,947
17. Gross Electrical Energy Generated ( WH) 576,872 2,459,424 54,626,962
18. Net Electrical Energy Generated ( WH) 546,724 2,317,912 51,487,108
19. Unit Service Factor 96.8 68.1 72.0
20. Unit Availability Factor 96.8 68.1 72.0
21. Unit Capacity Factor (Using MDC Net) 93.4 65.3 68.9
22. Unit Capacity Factor (Using DER Net) 91.6 64.0 67.0
23. Unit Forced Outage Rate 3.2 0.8 9.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCL% OPERATICN 12/01/77 12/01/77 Form 2/34 gmana stene Ih R

L DOCKET NO.

50-348 UNIT 1

DATE July 6, 1988 COMPLETED BY D. N, Morey TELEPHONE (205)899-5156 MONIH June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (PWe-Net)

(MWe-Net) 1 826 17 823 2

822 18 822 3

803 19 569 4

825 20 0

5 826 21 514 6

821 22 816 7

820 23 814 8

820' 24 817 9

819 25 818 10 799 26 818 11 642 27 818 12 651 28 816 13 791 29 814 14 824 30 813 15 824 31 16 826 INSTRUCTIONS On tids format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Form 13/21 i

l i

[

. A-

, i s' UNIT SHUTDOWNS AND POWER REDUCTIOTS DOCEIT NO.

'54-348 UNIT MAME J. M. FARLET - UNIT L_

DATE JULT 6, 1988 CO!8PLETED BT D. M. MORET REPORT MONTH JUNE TELEPHONE-(2051899-5154 I

l l

l l

l METHOD OF-l LICENSEE l l

l CAUSE & CURRECTIVE.

l l

l l

l DURATION l l SHUTTING l EVENT l STSTEM l COMPONENT l

ACTION TO l

lNO.

l DATE l TTPE l (HOURS) l REASON l DOWN REACTOR l REPORT 4 l CODE l CODE '

l PRE 7ENT RECURRENCE

-l 1

1 I

I I

I I

I I

i l-l004 l 880610 lS l

0.0 lB l

N/A l N/A l SD l

P l Power was reduced to replace.the upper sleeve

.l l

l l

l l

l l

l l

l bearing on the IC condensate pump.

l-1 I

I I

I I

I i

1 i

I l005 l 880620 lF l 22.8 lB l

1 l N/A l AB l

OR l The unit was shutdown to repair an RCS leak from -l

~

l l

l l

l l

l l

l l a flow orifice flange on the

'A' loop RTD l

l l

l l

l l

l l

l l bypass manifold. The gaskets were replactd and l,

l l

l l

l l

l l

l l the unit returned to power operation.

l 1

1 1

I l

1 1

I I

I I

I I

I I

I I

I i

1 1

I I

I I

I i

i I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

1 I

i i

i l

i i

l I

i i

i l

i I

I i

i i

l I

l-l 1

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

i l

I I

I I

I I

I I

I I

I I

i 1

1 I

i l

i l

i I

I I

i i

1

- F: Forced Reason:

Method:

Exhibit G-Instructions 3: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative Exhibit I -Same Source.

G-Operational Error (Explain)

(9/7')

H-<.ther (Explain)

M RxIn W

JOSEPH M. FARLEY NUCLEAR PIAVf UNIT 1 NARRATIVE SW NARY OF OPERATIONS June, 1988 On June 10, there was a significant power reduction when power was reduced to replace the IC condensate pump upper sleeve bearing. The unit returned to full power operation on June 13.

On June 20, the generator _ was taken off line at 0044 to repair a reactor

coolant system (RCS) leak from a flow ' rifice flange on the ' A' loop resistance temperature detector (RfD) manifold. ' The gaskets were replaced and the unit returned to power operation at 2330 on June 20.

ne following major safety-related maintenance was perfonned in the month of June:

1. A load test was perfonned on the 1A battery charger.
2. n e component cooling water to lube oil cooler flanges were replaced on the 1A, 1B, and 1C charging pumps.
3. The turbine driven auxiliary feedwater plunp overspeed setpoint was changed.
4. The 1C battery charger breaker cell suitch and pole shaft inspecfions were perfonned.
5. Miscellaneous corrective and preventive maintenance was perfonned on the diesel generators.

l 1.

OPERATING DATA REPORT DOCKET NO.

50-348 p

DATE 7/6/88 00MPLETED BY D. N. Morey

'IELEPHCNE (205)899-5156 OPERATING S'IAH)S Notes

1. Unit Name:

Joseph M. Farley - Unit 1

2. Reporting Period:

June, 1988

1) Cumulative data since
3. Licensed hermal Power (MWt):

2,652 12-1-77, date of

4. Namepdata Rating (Gross Ne):

860 commercial operation

5. Design Electrical Rating (Net Ne): 829

~.

6. Maximum Dependable Capacity (Gross MWe):

852.6

7. Maximum Dependable Capcity (Net MWe):

812.6

8. If Changes Occur in Cap:ity Ratings (Items Number 3 trough 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net Ne):

N/A

10. Reasons For Restrictions, If Any:

N/A

'Ihis Month Yr-to-Date Cumulative

11. Hours In Reporting Period 720 4,367 92,759
12. Number Of Hours Reactor Was Critical 702.6 3,022.7 68,239.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-Line 697.2 2,974.3 66,799.8 0.0 0.0 0.0
15. Unit Reserve Shutauwn Hours
16. Gross Thermal Energy Generated (MWH) 1,773,947 7,562,887 169,986,206
17. Gross Electrical Energy Generated (MWH) 576,872 2,459,424

-54,626,962

18. Net Electrical Energy Generated (MWH)

~ 546,724 2,317,912 51,487,108 96.8 68.1 72.0

19. Unit Service Factor
20. Unit Availability Factor 96.8 68.1 72.0
21. Unit Capacity Factor (Using MDC Net) 93.4 65.3 68.9
22. Unit Capacity Factor (Using DER Net) 91.6 64.0 67.0 3.2 0.8 9.3 l
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, a7B Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Comercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COIMERCIAL OPERATION 12/01/77 12/01/77 1

Form 2/34

?.

DOCKET NO.

50-348 UNIT 1

DATE July 6, 1988 COMPLETED BY D. N, Morey TELEPHONE (205)899-5156 MONTH June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POGE. oc. VEL (M4e-Net)

(M4e-Net) 1 826 17 823 2

822 18 822 3

803 19 569 4

825 20 0

5 826 21 514 6

821 22 816 7

820

, 23 814 8

820 24 817 9

819 25 818 10 799 26 818 11 642 27 818 12 651 28 816 13 791 29 814 14 824 30 813 15 824 31 16 826 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

I Form 13/21

4-UNZT SHUTDOWNS AND POWER REDUCTIONS DOCRET NO.

50-348 UNIT NAME J.

M.

FARLET - UNIT 1 5

DATE JULT 6, 1988 COMPLETED BY D.

N. MORET REPORT MONTH JUNE TELEPNONE (2051899-5156 e

l l

l l

l l METHOD OF l LICENSEE l l

l CAUSE & CORRECTIVE l-l l

l l DURATION l l SHUTTING l EVENT l STSTEM l COMPONENT l

ACTION TO l

lNO.

l DATE l TYPE l (HOURS) l REASON l DOWN REACTOR l REPORT 4-l CODE l CODE l

. PREVENT RECURRENCE l

l 1

I I

I I

I I

I I

I l004 l 880610 lS l

0.0 l8 l

N/A l N/A l SD l

P l Power was reduced to replace the upper sleeve l

l l

l l

l l

l l

l l bearing on the IC condensate pump.

l 1

1 1

I I

I I

I I

I I

l003 l 880620 lF l 22.8 l8 l

1 l N/A l AB l

CR l The unit was shutdown to repair an RCS leak fron l l

l l

l l

l l

l l

la flow orifice flange on the

'A' loop RTD l

l l

l l

l l

l l

l l bypass manifold. The gaskets were replaced and l

l l

l l

l l

l l

l l the unit returned to power operation.

'l l

1 I

I I

I I

I i

1 1

I I

I I

I I

I I

I i

i I

I I

I I

I I

I I

l 1

1 1

1 I

I I

I I

I I

I I

I I

I I

I I

I I

I i

l I

i I

I i

i I

I I

I I

I I

I I

I I

I I

I I

2 i

I i

i l

I I

i i

i i

l i

l i

i l

I I

i i

I I

I I

I I

I I

I I

i i

l i

l l

I i

l l

I I

I l

1 I

I I

I I

I I

I I

I I

I I

I I

I I

i 1

-1 1

1 1

I I

I I

I I

I I

I

' F: Forced Reason:

Method:

Exhibit G-Instructions E: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-a D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative Exhibit I -Same Source G-Operational Error (Explain)

(9/77)

H-Othcr (Explain)

M RX3R @

I JOSEPli M. FARLEY NUCLFAR PIMP UNIT 1 NARRATIVE SUMARY OF OPERATIONS June, 1988 On June 10, there was a significant power reduction when power was reduced to replace the 1C condensate pump upper sleeve bearing. The unit returned to full power operation on June 13.

On June 20, the generator was taken off line at 0044 to repair a reactor coolant system (RCS) leak from a flow orifice flange on the ' A' loop resistance temperature detector (RTD) manifold. The gaskets were replaced tuv1 the unit returned to power operat. ion at 2330 on June 20.

Die following major safety-related maintenance was perforwxi in the month of June:

1. A load test was per forwxi on the 1A battery charger.
2. Die component cooling water to lube oil cooler flanges were replaced on the 1A, IB, and 1C charging pumps.
3. Die turbine driven auxiliary feedwater pump overspeed setpoint bus changed.
4. Die IC battery charger breaker cell switch and pole shaf t inspections were perforwxi.
5. Miscellaneous corrective and preventive maintenance was perforined on the diesel generators.

d

y

' AlabimaPowerCompany 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 352914400 Telephone 2052501837 W. G. Hairston,Ill Senior Vice President Nuclear Operations the southern electnc system July 12, 1988 Docket No. 50-348 U. S. Nuclear Regulatory Comission ATIN: Document Control Desk Washington, D. C.

20555 Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the June 1988 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, required by Section 6.9.1..'.0 of the Technical Specifications.

If you have any questions, please advise.

Yours very truly, W. G. Hairston, III NGH/JGS:mab/1.6 Attachments xc:

Dr. J. N. Grace

' \\

-