Parch 25,1988 Docket No. 50-382 Mr. J. G. Dewease Senior Vice President - Nuclear Operations 1.ouisiana Power and Light Company 317 Baronne St., Mail Unit 17 New Orleans, Lousiana 70160 l

Dear Mr. Dewease:

SUBJECT:

STATUS OF INSERVICE INSPECTI0tl APPPOVAL Our contractor has completed the review of your Inservice Inspection program through Revision 2. The staff has reviewed the differences between Revisions 2 and 3, which was subnitted to us by Louisiana Pcwor and Light letter dated November 20, 1987. We are in the final stages of preparing our Safety Evaluation of your program and hope to issue the fomal letter before the end of the refueling outage which is scheduled to begin in April 1988.

l Pending the issuance of this letter, LPAL should continue to implement the progran described through Ocvision 3.

Sincerely, N

Jose A. Calvo, Director l

Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects cc: See next page DISTRIBUTION Tocket File-NRC PDR Local PDR PD4 Peading j

'r DR4A/J. Collins J. Calvo P. Noonan D. Wigginton CGC-Rockville E. Jordan J. Partlow NTEB ACRS (10)

PD4 Plant File

  • See previous concurrence k

PD4/LA*

PD4/PM*h t1TEB*

PD4/D D N PNoonan DWigginton:sr JCalvo 03/25/08 03/25/88 03/25/88 03/2r/88 0304050117 080325 PDR ADOCK 05000302 C

PDR

f-NM Do:ket No. 50-382 Mr. J. G. Dewease Senior Vice President - Nuclear Operations Louisiana Power and Light Company 317 Baronne St., Hail Unit 17 1 M 3)

New Oricans, Lousiana 70160

Dear Mr. Dewcase:

SUBJECT:

STATUS OF INSER'! ICE INSPECTION APPROVAL Our contractor hgs completed the review of your Inservice Inspection program through Revision

{hichwassubmittedtousbyLouisianaPcwerand light letter dated nva 9 2n 1987. We are in the final stages of preparing W WQ cur Safety Evaluat na nope to itsee the formal relicf letter before the end g

of the refuelina outane which is scheduled to begin in April 1988 Pending the O'

issuance of thet rclic? letter, LP&L should continue to irplement the pregram described through Revision 3 ff :: n;3 be indic:ted ir cui contraucr s copy J-the Tro 4e arrioced foi ;e"* i r #m t i er. -

kehnical ro i,,o < r n nernet a

Sincerely, Jose A. Calvo Director Project Directorate - IV i

Division of Reactor Proiects - III, IV, Y and Special Projects Enclosure-As stated cc w/ enclosure:

See next page DISTRIBUTION Docket File NRC PDR Local PDR PD4 Reading DR4A/J. Collins J. Calvo P. Noonan D. Wigginton OGC-Rockville E. Jordan J. Partlow MTEB ACRS (10)

PD4 P1 nt file r

f(

{ cv) 1 PD4/LAfp}k PD4/P PD4/D

()

PFoonan DWiggi :o :sr C

JCalvo 03g':/83 0

/88 034g/CS 03/ /88 l

.i

March 25,1988 Docket No. 50-382 Mr. J. G. Dewcase Senior Vice President - Nuclear Crerations Louisiana Power and Light Company 317 Baronne St., Mail Unit 17 New Orleans, Lousiana 70160

Dear Mr. Dewease:

SUBJECT:

STATUS OF INSERVICE INSPECTION APPROVAL Our contractor has completed the review of your Inservice Inspection program through Revision 2. The staff has reviewed the differences between Pevisions 2 and 3, which was subnitted to us by Louisiana Pcwer and Light letter dated November 20, 1987. We are in the final stages of preparing our Safety Evaluation of your program and hope to issue the formal letter before the end of the refueling outage which is scheduled to begin in April 1988.

Pending the issuance of this letter, LPAL should continue to iaplement the progran described through Revision 3.

Sincerely.

N Jose A. Calvo. Director Project Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects cc: See next page i

i DISTRIBUTION Docket File NRC PDR Local PDR PD4 Reading DR4A/J. Collins J. Calvo P. Nooran D. Wigginton OGC-Rockville E. Jordan J. Partlow NTEB ACRS(10)

PD4 Plant File

)

  • See previous concurrence PD4/LA*

PD4/PM*k MTEB*

PD4/D /}!<--

PNoonan DWigginton:sr JCalvo 03/25/68 33/25/88 03/25/88 03/2r/88

qnargy k,

UNITED STATES g

NUCLEAR REGULATORY COMMISSION l

WASHINGTON, D C. 20655 e

%,..... f March 25,1988 Docket No. 50-382 Mr. J. G. Dewease Senior Vice President - Nuclear Operations Louisiana Power and Light Corrpany 317 Baronne St., Mail Unit 17 New Orleans, Lousiana 70160

Dear Mr. Dewease:

SUBJECT:

STATUS OF INSERVICE INSPECTION APPROVAL Our contractor has completed the review of your Inservice Inspection progran through Revision P. The staff has reviewed the differences between Pcvisions 2 and 3, which was submitted to us by Louisiana Power and Light letter dated November 20, 1987. We are in the final stages of preparing our Safety Evaluation of your program and hope to issue the formal letter before the end of the refueling outage which is scheduled to begin in April 19P8.

Pending the issuance of this letter, LP8L should continue to ir.plement the program described through Revision 3.

Sincerely.

d.

bM' Jose A. Calvo. Director Project Directorate - IV i

Division of Reactor Pro,1ects - III,

!Y, Y and Special Projects cc: See next page e

1

Mr. Jerrold G. Dewease Waterford 3 Louisiana Power & Light Coerpany Cc:

W. Malcolm Stevenson, Esq.

Regional Administrator, Region IV Monroe & Leman U.S. Nuclear Regulatory Comission 1432 Whitney Building Office of Executive Dire tor for New Orleans, Louisiana 70103 Operations 611 Ryan Plaza Drive Suite 1000 Mr. E. Blake Arlington, Texas 76011 Shaw, Pittnan, Potts & Trowbridge 2300 N Street, NW Mr. William H. Spell, Administrator Washington, D.C.

20037 Nuclear Energy Division Office of Environnental Affairs Resident Inspector /Waterford NPS Post Office Box 14690 Post Office Box 822 Baton Rouge, Louisiana 70898 Killona, Louisiana 70066 Mr. Ralph T. Lally President, Police Jury Manager of Quality Assurance St. Charles Parish Middle South Services, Inc.

Hahnville, Louisiana 70057 Post Office Box 61000 New Orleans, Louisiana 70161 Chairman Louisiana Public Service Comission One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 Mr. R. F. Burski, Acting Nuclear Safety and Regulatory Affairs Manager Louisiana Power & Light Company 317 Baronne Street New Orleans, Louisiana 70112

es

.m at--as.=

- -se

-asmh---m-uum m

-a--.

t s

spp b

o f

i l

1

.