ML20236T344

From kanterella
Jump to navigation Jump to search
Amend 25 to License NPF-38,adding Fuel Elevator & Spent Fuel Handling Machine as Approved Fuel Assembly Locations in Fuel Handling Bldg & Revising Applicability of License Condition 2.C.14 to Modes 1-5
ML20236T344
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/20/1987
From: Calvo J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20236T346 List:
References
NUDOCS 8712010160
Download: ML20236T344 (2)


Text

_ _ _ - _ _ _

+

UNITED STATES g

NUCLEAR REGULATORY COMMISSION g

g WASHINGTON, D. C. 20556 l

A...../

LOUISIANA POWER AND LIGHT COMPANY 00CKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION, UNIT 3 1

AMENDMENT TO. FACILITY OPERATING LICENSE Amendment No. 25 License No. NPF-38 1.

The Nuclear Regulatory Commission (the Commission) has found that.

A.

The application for amendment by Louisiana Power and Light Company (the licensee) dated July 24, 1987, complies with the standards and requirements of the Atomic-Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set for_th in 10 CFR Chapter I; B.

The facility will operate in con.formity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable i

requirements have been satisfied.

C 8712010160 871120 DR ADOCK 05 82

4

' s 2.

Accordingly, the license is amended by changing paragraph 2.C.14 of.

Facility Operating License No. NPF-38 to read as follows:

14.

Fuel Movement in the Fuel Handling Building In the fuel handling building, during Modes'l-5, no more than one fuel assembly shall be outside an approved shipping container, an approved storage rack, the fuel transfer tube (including upender), the fuel elevator, or the spent fuel handling machine.

In addition to the above fuel assembly inspection / reconstitution may.take place outside of an approved storage rack, when required, provided that the inspection / reconstitution area is borated to a level at or about 1720 ppm.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION l 6. D b ~2 Jose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation Date of Issuance:

November 20, 1987 i

- - - - - - - - _ _. - _ _ _ _ _. _. _ _ _ _, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _