Forwards Insp Rept 50-423/88-04 on 880314-18 & Notice of Violation.Potential Violations Under Review for Appropriate Enforcement Action
ML20150E116
Person / Time
Site: Millstone 
Issue date: 07/06/1988
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20150E119 List:
References
NUDOCS 8807150007
Download: ML20150E116 (3)


See also: IR 05000423/1988004

Text

V

~

,

.

y

&3

-

.

06 JUL 1988

-

Docket No. 50-423

License No. NPF-49

EA-88-177

Northeast Nuclear Energy Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject:

Inspection Report No. 50-423/88-04

Enclosed is the subject report of the NRC team inspection conducted by

Mr. R. J. Paolino and other NRC inspectors and contract personnel on

March 14-18, 1988 at the Northeast Nuclear Energy Company Corporate Office in

Berlin, Connecticut, and a one-day verification inspection at the Millstone 3

facility, located in Niantic, Connecticut, of activities authorized by NRC

License No. NPF-49.

The team's findings were discussed with you and members of your staff at the

conclusion of the inspection.

The inspection reviewed your implementation of a

program for establishing and maintaining the qualification of electric equipment

within the scope of 10 CFR 50.49. Within these areas, the inspection consisted

of examination of selected procedures and records, interviews with personnel,

observations and a physical walkdown verification of specific electrical

equipment selected from the EQ Master List.

Based on the results of this inspection, we have determined that yo' '-

implemented a program to meet the requirements of 10 CFR 50.49; how-

appears that some of your activities were not conducted in full comt

. sith

NRC requirements as set forth in the Notice of Violation, enclosed hir eith as

Appendix A.

The violation has been categorized by severity level in accordance

.

with the General Statement of Policy and Procedure for NRC Enforcement Actions,

10 CFR 50, Part 2, Appendix C.

For the potential violation (s) identified in paragraphs 7.0 and 11.1.4, the NRC

is considering these potential violations for appropriate enforcement action.

We plan to conduct an enforcement conference with you to discuss the potential

violations in Region 1 offices within 30 days of your receipt of this letter.

At the enforcement conference, you should be prepared to discuss (1) the safety

significance of each violation, as well as the number of deficiencies and the

number of systems and components affected in each case; (2) the specific and

(

OFFICIAL RECORD COPY

IR MILL 3 88-04 - 0001.0.0

\\\\

06/29/88

8807150007 880706

gDR

ADOCK 0500

3

EN

C

-.

.

-.

._-

.'

.

.

.

Northeast Nuclear Energy Company

'2

.

underlying cause(s) of each violation; and, (3) the actions taken or planned to

correct the individual violations as well as to ensure yourself that Northeast

Nuclear Energy Company is currently in overall compliance with EQ requirements.

Furthermore, you should be prepared to discuss each violation in light of the

following questions. Which items were identified by you and were they promptly

reported to the NRC? What were your best efforts to comply with the rule

within the deadline? We request that at the enforcement conference you pro-

vide a handout that succinctly describes your position concerning these

enforcement considerations.

A management meeting was held in the Region I office on March 21, 1988 to

discuss the potential violations, justification for continued operation and

your corrective actions.

In addition, long term commitments were made to

ultimately resolve the qualification issue involving the Litton-Veam connector.

You are required to respond to this letter.

In preparing your response, you

should follow the instructions in Appendix A.

The responses directed by this

letter are not subject to the clearance procedures of the Office of Management

and Budget as. required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us ic this matter is appreciated. We are available to

discuss any questions you may have concerning this inspection.

Sincerely,

C3hMNAL SIGNED BY

I'WN4 V. JOHNSTON

William V. Johnston, Acting Director

Division of Reactor Safety

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region I Inspection Report No. 50-423/88-04

3.

Attachment 1, Litton-Veam Presentation

cc w/encis:

W. D. Romberg, Vice President, Nuclear Operations

D. O. Nordquist, Director of. Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

S. E. Sccce, Station Superintendent

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

0FFICIAL RECORD COPY

IR MILL 3 88-04 - 0001.1.0

06/29/88

-

-.

, .

- . -

,

-

.

,

.

Northeast Nuclear Energy Company

3

.

bec w/encls:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

S. Pindale, R1, Beaver Valley

W. Raymond, SRI, Millstone 1,2&3

R. Ferguson, LPM, NRR

R. Bores, DRSS

D. Holody, RI

U. Potapovs, NRR/DVIB

cG

&

l

+

RI:DRS

RI: RS

RI:DRS

Paolino ms/tm/rw

Anderson

Durr

6/Z1/88

6/&$/88

6/27/88

0FFICIAL RECORD COPY