Forwards IE Inspec Repts 50-321/78-35 & 50-366/78-43 on 780828-1006 During Which No Items on Noncompliance Were Noted
ML20150D709
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/07/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20150D708 List:
References
NUDOCS 7812060345
Download: ML20150D709 (2)


See also: IR 05000321/1978035

Text

-

_.

.-

. . . . . .

.

.-

- -.

-

.

. _ .

.

..

.

[

  1. "8C

UNITED STATES

Og

y

o,,-

NUCLEAR REGULATORY COMMISSION

R EGloN 18

O .y

7,(

g

r

101 M ARIETT A STREET, N.W.

-

'"'-

[

ATLANTA, GEORGIA 30303

o

~

%*****+*'

NOV 0 71978

'

In Reply Refer To:

RII:RFR

50-321/78-35, 50-366/78-43

Georgia Power Company

ATTN:

Mr. J . H. Miller, J r.

Executive Vice President

270 Peachtree Street, N. W.

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by Mr. R. F. Rogers of this

of fice on August 28 - October 6,1978, of activities authorized by

NRC Operating License Nos. DPR-57 and NPF-5 for the Plant E. I.

Hatch f acilities, and to the discussion of our findings held with

Mr. Max Manry periodically during the inspection interval.

Areas examined during the inspection and our findings are discussed

in the enclosed inspection report. Within these areas, the in-

spection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observations

by the inspector.

Within the scope of this inspection, no items of noncompliance were

L

l

disclosed.

l

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

'

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is

contained in a separate part of the dccument. If we do not hear from

you in this regard within the specified period, the report will be

placed in the Public Document Room.

78120605 F

'

1

I

'

,

,

,

NOV 0 71978

c

!

.

Georgia Power Company

-2-

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

v

F. J. Long, Ch

Reactor Operations and Nuclear

Support Branch

Enclosure:

Inspection Report Nos. 50-321/78-35

and 50-366/78-43

cc w/ encl:

Mr. M. Manry, Plant Manager

Plant E. I. Hatch

P. O. Box 442

Baxley, Georgia 31513

Mr. C. E. Belflower

Site GA Supervisor

Plant E. I. Hatch

P. O. Box 442

Baxley, Georgia 31513

- .

-

-

-

-

-

- - -

-

-

.