Text

. . . . . . .

~ . .

,

UNITED STATES

[p8 Ricoq'o 'g NUCLEAR REGULATORY COMMISSION

& , f, f e REGION il

3 '-' < $ 101 M ARIETT A sT RE ET, N.W.

o- 8 ATLANTA. GEORGI A 30303

e

% J$

OCT 161978

In Reply Refer To:

RII:SCE

l 50-302/78-22

Florida Power Corporation

ATTN: W. P. Stewart, Director

Power Production

P. O. Box 14042, Mail Stop C-4

St. Petersburg, Florida 33733

Gentlemen:

This refers to the inspection conducted by Mr. S. C. Ewald of this

office on September 5-8, 1978, of activities authorized by NRC Operating

License No. DPR-72 for the Crystal River Unit Three facility, and to the

discussion of o. findings held with Mr. G. P. Beatty, J r. at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed

in the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

We have examined actions you have taken with regard to previously identi-

fied enforcement matters and unresolved items. The status of these items

is discussed in the enclosed report.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC req';irements. These items

and references to pertinent requirements are listtd in the Notice of

Violation enclosed herewith as Appendix A. This r.otice is sent te /nu

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice", Part 2, Title 10, Code of Federal Regulations. Section 2.201

requires you to submit to this office, within 20 days your receipt

of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further

noncompliance; and (3) the date when full compliance will be achieved.

.

78112400 n

_- ----

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____-

.

OCT 161978

.

Florida Power Corporation -2-

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you (cr

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document. If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely

~

~

J. T. Sutherland, Chief

' '3 Fuel Facility and Materials

Safety Branch

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report No. 50-302/78-22

cc w/ encl:

Mr. G. P. Beatty, Jr.

Nuclear Plant Superintendent

P. O. Box 1228

Crystal River, Florida 32629

.