ML20150C535
| ML20150C535 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/16/1978 |
| From: | Sutherland J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML20062D435 | List: |
| References | |
| NUDOCS 7811240077 | |
| Download: ML20150C535 (2) | |
See also: IR 05000302/1978022
Text
. . . . . . .
~
.
.
[p8 Ricoq'o
UNITED STATES
,
NUCLEAR REGULATORY COMMISSION
'g
&
, f, f
e
REGION il
$
101 M ARIETT A sT RE ET, N.W.
3
'-' <
8
ATLANTA. GEORGI A 30303
o
e
-
%
J$
OCT 161978
In Reply Refer To:
RII:SCE
l
50-302/78-22
Florida Power Corporation
ATTN:
W. P. Stewart, Director
Power Production
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida 33733
Gentlemen:
This refers to the inspection conducted by Mr. S. C. Ewald of this
office on September 5-8, 1978, of activities authorized by NRC Operating
License No. DPR-72 for the Crystal River Unit Three facility, and to the
discussion of o.
findings held with Mr. G. P. Beatty, J r. at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed
in the enclosed inspection report.
Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
We have examined actions you have taken with regard to previously identi-
fied enforcement matters and unresolved items. The status of these items
is discussed in the enclosed report.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC req';irements.
These items
and references to pertinent requirements are listtd in the Notice of
Violation enclosed herewith as Appendix A.
This r.otice is sent te /nu
pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice", Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days your receipt
of this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you and the results
achieved;
(2)
corrective steps which will be taken to avoid further
noncompliance; and
(3)
the date when full compliance will be achieved.
.
78112400 n
_-
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____-
.
OCT 161978
.
Florida Power Corporation
-2-
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (cr
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Sincerely
~
~
J. T. Sutherland, Chief
' '3
Fuel Facility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No.
50-302/78-22
cc w/ encl:
Mr. G. P. Beatty, Jr.
Nuclear Plant Superintendent
P. O. Box 1228
Crystal River, Florida 32629
.