Provides Listed Reasons Why WCAP 11717 Entitled Evaluation of Margin to Steam Generator Overfill for Millstone 3, Should Be Considered Exempt from Mandatory Public Disclosure
ML20150C470
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/10/1988
From: Ferguson R
Office of Nuclear Reactor Regulation
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
References
TAC-67054, NUDOCS 8803180268
Download: ML20150C470 (3)


Text

March 10 1988 0

Docket No. 50-423 DISTRIBUTION IDocketfile S. Norris

'NRC T Local PDRs R. Ferguson Mr. Edward J. Mroczka S. Varaa OGC-WF Senior Vice President B. Boger ACRS(10)-

Nuclear Engineering and Operations J. Partlow E. Jordan Northeast Nuclear Energy Company Gray File Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Mroczka:

SURJECT: REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. 67054)

Re:

Millstone Nuclear Power Station, Unit No. 3 By your application dated January 22, 1988 and affidavit submitted by letter dated January 13, 1988, you submitted WCAP 11717 entitled, "Evaluation of the Margin to Steam Generator Overfill for Millstone 3" and requested that it be withheld from public disclosure pursuant to 10 CFR 2.700.

You stated that the submitted infonnation should be considered exempt from nandatory public disclosure for the following reasons:

(a) The information reveals the distinguishing aspects of a process (or component, structure, tool method, etc.) where prevention of its use by by any of Westinghouse's competitors without license from Westinghouse's constitutes a competitive economic advantage over other companies.

(b)

It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optinization or improved marketability.

(c)

Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.

(d)

It reveals cost or price information, production capacities, budget levels, or comercial strategies of Westinghouse, its customers or suppliers.

(e)

It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.

$$$Nbo ch P

4 (f)

It contains patentable ideas, for which patent protection ray be desirable.

(g)

It is not propertv of Westinghouse, but must be treated as proprietary by Westinghouse according to agreements with the cwner.

We have reviewed your application and the material based on the requirements and criteria of 10 CFR 2.790 and, on the basis of Westinghouse's statements, have determined that the submitted information sought to be withheld contains trade secrets or proprietary commercial information.

Therefore, the version of the submitted information marked as prnprietary will be withheld from public disclosure pursuant to 10 CFR 2.790lb)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.

If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could thcn be made available for public inspection, you should promptly notify the NRC.

You should also understand that the NRC may have cause to review this determination in the future, such as, if the scope of a Freedom of Information Act request includes your information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, original signed by Robert L. Ferguson, Project Panager Project Directorate 1-4 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc: See next page I

(

i LA:

I-4 PMtt DI-4

)

T-4 SN is RFe uson:bd JS" 03//(/88 03/7/88 03/ /88 03

/

4 1

b Mr. E. J. Mrcent Flilistone Nuclear Power Station Northeast Nuclear Energy Company Unit No. 3 b

CC:

Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations Manager of Quality Assurance Northeast Utilities Service Corrpany Northeast Nuclear Energy Cerrpany Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region I Departnent of Environmental Protection U. S. Nuclear Regulatory Comission State Office Building 475 Allendale Read Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Bradford S. Chase, Under Secrctary First Selectmen Energy Division Town of Waterford Office cf Policy and Management Hall of Records 80 Vashington Street P00 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Station Superintendent W. J. Paytrond, Resident Inspector Millstone Nuclear Power Station Millstere Nuclear Power Station Ncrtheast Nuclear Energy Company c/o U. S. Nuclear Regulatory Comission Post Office Box 128 Post Office Box 811 Waterford, Connecticut 06385 Niantic, Connecticut 06357 C. H. Clement, Unit Superintendent M. R. Scully, Executive Director Millstone Unit No. 3 Connecticut Municipal Electric Northeast Nuclear Energy Company Energy Cooperative Post Office Box 128 268 Thomas Road Waterford, Connecticut 06305 Groton, Connecticut 063a0 Ms. Jane Spector Michael L. Jones, Manager Federal Energy Regulatory Comission Project Management Departrent 825 N. Capitol Street, N.E.

Massachusetts Municipal Wholesale Room 8600C Electric Company Washington, C.C.

PO4?6 Post Office Scx 426 Ludlew, Massachusetts 01056 Burlington Electric Cepartrent c/o Robert E. Fletcher, Esq.

1 271 South Union Street Eurlington, Vermont 05402

!