ML20150C216

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/88-12 on 880501-31 & Notice of Deviation
ML20150C216
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/06/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20150C219 List:
References
NUDOCS 8807120356
Download: ML20150C216 (2)


See also: IR 05000267/1988012

Text

. . .- .

o

.

..

,

ypW

In Reply Refer To:

Docket: 50-267/88-12

, ,

"

Public Service Company of Colorado-

! ATTN: Robert 0. Williams, Jr.

. Vice President, Nuclear

i Operations

2420 West 26th Avenue, Suite 15c

'

Denver, Colorado 80211

i

Gentlemen:

This refers to the inspection conducted by Messrs. R. E. Farrell and

P. W. Michaud of this office and K. L. Heitner of the Office of Nuclear Reactor

Regulation during the period May 1-31, 1988, of activities authorized by HRC

Operating License DPR-34 for Fort St. Vrain Nuclear Generating Station, and to

the discussion of our findings with you and other members of your staff at the

conclusion of the inspection.

, Areas examined during the inspection included operational safety verification,

licensee event report review, monthly maintenance observation, monthly

surveillance observation, radiological protection, and monthly security

observation. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with personnel, l

and observations by the inspector. The inspection findings are documented in

the enclosed inspection report.

During this inspection, it was found that one of your activities was in

deviation to a commitment. Consecuently, you are required to respond to this '

deviation, in writing, within 30 cays. Your response-should be based on the

specifics contained in the Notice of Deviation enclosed with this letter.

Should you have any questions concerning this inspection, we will be pleased to  :

discuss thet with you. '

Sincerel.y  ;

.

Original Sigrtw 'BY

d.' h. n, Director .l

DivisionofReactorProject '

1

Enclosures:

1. Appendix A - Notice of Deviation

2. Appendix B - NRC Inspection Report

1

50-267/88-12

l cc w/ enclosures: (see next page)

RIV: SRI * RI* PM/NRR* PS/B* D P l

REFarrell/1d PWMichaud KLHeltner TFWesterman ,J.JCallan j

/ /88 / /88 / /88 / /88 '//6/88

, *previously concurred

8807120356 000706

PCR

G

ADOCK 05000267 I{

j PNU

f ,

.,- .

.

Public Service Company of Colorado -2-

cc w/ enclosures:

Manager, Nuclear Production Division

Fort St. Vrain Nuclear Generating Station

16805 WCR 19 1/2

Platteville, Colorado 80651

P. Tomlinson, Manager

Quality Assurance Division

(Same Address)

Colorado Radiation Control Program Director

Colorado Public Uti'ities Commission

bec to DMB (IE01)

bcc distrib. by RIV:

  • 0RP R. D. Martin, RA
  • RRI Lisa Shea, RM/ALF
  • Section Chief (DRP/B) *RIV File
  • RPSB-DRSS *TSS
  • RSTS OPERATOR * MIS System
  • ProjectEngineer,DRP/B *DRS

^K. heitner, NRR Project Manager

  • w/766

l

1

l

l

l

l