Forwards Safety Insp Rept 50-440/88-03 on 871231-880222 & Notice of Violation
ML20150C064
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/03/1988
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kaplin A
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20150C067 List:
References
RTR-REGGD-01.108, RTR-REGGD-1.108 NUDOCS 8803170311
Download: ML20150C064 (2)


See also: IR 05000440/1988003

Text

. _ _ . _ _ _ _ .

_. - _ _ _ .

._

-

.

> .

I MAR 0 31988

Docket No. 50-440 i

Docket No. 50-441 f

-The Cleveland Electric Illuminating

Company

ATTN: Mr. Alvin Kaplan

Vice President

Nuclear Group

10 Center Road

Perry, Ohio 44081

l

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

K. A. Connaughton and G. F. O'9wyer of this office on December 31, 1987

through February 22, 1988, of activities at Perry Nuclear Power Plant, Unit 1,

'

authorized by NRC Facility Operating License No. NPF-58 and to the discussion

of our findings with Messrs. Stead and Stratman and others of your staf f at the

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during the

inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in

violation of NRC requirements, as described in the enclosed Notice. With

respect to Item 2., the inspection showed that action had been taken to correct

the identified violation and to prevent recurrence. Our understanding of your

corrective actions is described in Paragraph 3.c. of the enclosed inspection

report. Consequently, no reply to the violation is required and we have no

further questions regarding this matter at this time. Regarding the remaining

items, a written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter, the enclosures, and your response to this letter will be placed in the

NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

8803170311

PDR

880303

0 ADOCK 05000440

PDR _

Te o I ,[<

~

- m

.

,e -

,

The Cleveland Electric Illuminating Co.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

R. C. Knop, Chief

Reactor Projects Branch 3

Enclosures:

1. Notice of Violation

2. Inspection Report

No. 50-440/88003(DRP)

cc w/ enclosures:

F. R. Stead, Director, Perry

Plant Technical Department

M. D. Lyster, General Manager,

Perry Plant Operations Department

Ms. E. M. Buzzelli, Manager,

Licensing and Compliance

Section

Mr. M. R. Edelman, Nuclear Vice

President, Centerior Energy

DCS/RSB(RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

State of Ohio, Public

Utilities Commission

i

A O

RIII R II RIII

M.McBarger/pb Weil[3'/ Knop I

3/Clf /88 3/t/ /88 . O 3/ /88

'fil7fff~$ ,

\

'1