ML20150C052

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-416/87-40 & 50-417/87-04 on 871219-880115 & Notice of Violation
ML20150C052
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 02/22/1988
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kingsley O
SYSTEM ENERGY RESOURCES, INC.
Shared Package
ML20150C055 List:
References
NUDOCS 8803170306
Download: ML20150C052 (2)


See also: IR 05000416/1987040

Text

__-_

,

-%

.

.- s

h hk

,

FEB 2 21988

Docket Nos. 50-416, 50-417

License Nos. NPF 29, CPPR-119

System Energy Resources, Inc.

L4TTN: Mr. O. D. King'sley, Jr.

Vice President, Nuclear Operations

P. O. Box 23054

Jackson, MS 39205

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-416/87-40 AND 50-417/87-04)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

_

R. C. Butcher on December 19, 1987 - January 15, 1988. 'The inspection included

a review of activities althorized for your Grand Gulf Nuclear Station. At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. The violation, references to pertinent requirements, and

elements to be included in your response are described in the enclosed Notice

of Violation.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL SIGNED BY

DAVID M. VERRElu

David M. Verre111, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosures: (See page 2)

gR03170306 880222

g ADOCK 05000416

PDR

\\

.reof

-. . . . .. . . . - . - . . . - .

,

'

'

, MB 21130

System Energy. Resources, Inc. 2

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encls:

  1. H. Cloninger, Vice President, Nuclear

.

ngineering and Support

E. Crose, GGNS Site Director.

. R. Hutchinson, GGNS-General Manager.

J. G. Cesare, Director, Nuclear Licensing

cf T. Lally, Manager of Quality Assurance

Middle South Services, Inc.

E 8. McGehee, Esquire

Wise, Carter, Child, Steen and Caraway

LN'. S. Reynolds, Esquire

Bishop, Liberman, Cook, Purcell

& Reynolds

LA: W. Jackson, Project Engineer

bec w/encls:

'MRC Resident Inspector

DRS Technical Assistant

d. Kintner, NRR

Document Control Desk

State of Mississippi

(Fdward Baker, NRR

Jdmes Conway, NRR

RII

E(

RII'1vl

LModenos:cdg

n

HDalce

02/p/88 02/9 g88

. . - - . _ _ - . . - _ _ - , - - , . _ - - -- .- .