ML20150B746

From kanterella
Jump to navigation Jump to search
Responds to 780921 NRC Ltr Re Violations Noted in Inspec Repts 50-438/78-16 & 50-439/78-16.Corrective Actions: Uncertified Inspectors Will Not Be Used to Perform QC Signoff
ML20150B746
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 10/12/1978
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML110870402 List:
References
NUDOCS 7811080254
Download: ML20150B746 (3)


Text

. . - . . - - - -

,- .u .

O TENNESSEE VALLEY AUTHORITY CH ATTANOOG A, TENNESSEE 374o1 830 Power Building October 12, 1978 Mr. James'P. O'Reilly, Director Office'of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNIT 1 INFRACTION 50-438/78-16-03 DEVIATION FROM SITE COMMITMENT This is in response to C. E. Murphy's letter dated September 21, 1978, R11:PRV $0-438/78-16, 50-439/78-16, concerning activities at the Bellefonte Nuclear Plant which appeared to have been in violation of NRC regulations. Enclosed is our response to the citation.

f If you have any questions regarding this matter, please get in touch with M. R. Wisenburg at FTS 854-2581. )

Very truly yours,

. .W h' A . Assistant E. Gilleladd Manager of Power i

Enclosure cc: Mr. John G. Davis, Acting Director (Enclosure) ,

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 i

l 78110SOPSN

,y ,

DCIDSURE BELLEFONTE NUCLEAR PLANT UNIT 1 INFRACTION 78-16-03 DEVIATION FROM SITE COMMITMENT ,

Infraction 50-438/78-16-03 Deviation from Site Conmitment Criterion V of Appendix B to 10 CFR 50, as implemented by the PSAR, Paragraph 17.1.5, requires in part, " Activities affecting quality shall be prescribed by documented instructions, procedures, ...and shall be accomplished in accordance with these instructions, procedures,..."

TVA procedureQAP 2.07, Rev.1 (in eff ect in March 1976) required OC inspectors to be trained and certified for each QC procedure being

' utilized.

Contrary to the above requirements, the following item was observed:

On August 22, 1978, during inspection of quality records for Component  !

Cooling System Subassembly No. 0-KC-01-12, the inspector noticed a QC signoff was performed by an inspector who was not certified. Step 4 of the Manufacturer"s Installation Quality Plan, a signoff in accordance with TVA procedure QCP-10.9, was signed off on March 4,1976, by an inspector who was not certified to QCP-10.9 until April 13, 1976.

Assessment of Infraction The inspector was not certifibd at the time of the infraction; however, he was under direct supervision and receiving on-the-job training.

Transfer of heat numbers, which this signoff concerned, is an important step in material control but is a relatively simple operation which can be bandled without difficulty with a minimum of training, though it is recognized that an uncertified inspector should not be performing this signoff.

Corrective Action Taken and Results Achieved .

The subject action was reported on Quality Control Investigation Report No. 656. An investigation of the subject Manufacturer's Installation Quality Plan (M10P) revealed that the heat number, which the uncertified inspector had signed off as being transferred correctly, was also recorded on the MlQP at the time of material issue and again on the welding record which was attached to the M10P. Checking materiel certifications for this particular material heat number determined the material to be acceptable for installation.

All'M10P's and Sequence Control Charts (SCC's) already on file are now being reviewed to ensure no others have been signed by uncertified inspectors. If these records are discovered to have been signed by y .

. . ~ ~

7 i

.mcertified inspectors, Quality Control Investigation Rnorts will be prepared to document and investigate the occurrence.

By the investigation described above for the specific instance, it was determined that the heat numbers were in fact transferred 3 correctly. For those instances discovered during the review of all .

other M10P's and SCC's, a similar investigation will be performed and the Quality Control' investigation Report for that particular instance will remain open until assurance can be obtained that the action signed i off by uncertified personnel was in fact perfonned correctly. l Steps Taken to Avoid Further Recurrence Originally, MlQP's and SCC's had not received detailed review, but have si_nce been added to the list of QA records requiring review. This formal review is now performed by the Quality Control and Records Unit before l these records are filed in the QA records vault. In addition, MEU inspection personnel have been instructed to verify their certification to the appropriate procedures prior to signoff of QA documents.

Date of Full Compliance Bellefonte Nuclear Plant will be in compliance with the established I requirements and the indicated investigation will be completed by November 15, 1978. ,

b 6