Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20129J5741996-11-0505 November 1996 Trip Rept of 961001-03 Visit to Omega Point Labs in San Antonio,Tx to Witness Three Fire Endurance Tests Conducted for PG&E ML20245F9261989-08-0707 August 1989 Summary of 890613-15 Meetings W/Util in San Francisco,Ca Re PRA long-term Seismic Program.List of Attendees & Agenda Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML20151D3481988-04-0707 April 1988 Summary of ACRS Subcommittee on Diablo Canyon Meeting on 880223-24 in Burlingame,Ca Re Review of Diablo Canyon Long Term Seismic Program ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20148H6031987-12-15015 December 1987 Summary of ACRS DHR Sys Subcommittee 871117 Meeting in Washington,Dc Re Util Decision Not to Install Dedicated Blowdown Sys at Davis Besse & Implications of Diablo Canyon Loss of Shutdown Cooling Event.Viewgraphs Encl ML20195G3651987-08-0707 August 1987 Summary of CRGR Meeting 116 on 870610 Re Final Rule Amends to 10CFR30,40,50,51,70 & 72 Concerning Requirements for Decommissioning Facility.List of Attendees Encl ML20245C2601987-08-0707 August 1987 Summary of CRGR Meeting 116 on 870610 Re Final Rule Amends to 10CFR30,40,50,51,70 & 72 Concerning Requirements for Decommissioning Facility.List of Attendees Encl ML20215C8721987-06-0808 June 1987 Summary of Operating Reactors Events Meeting 87-10 on 870406 Re Events Which Occurred Since 870330 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams & Significant Events Encl ML20214P6121987-05-27027 May 1987 Summary of Operating Reactors Events Meeting 87-14 on 870512 W/Nrr,Res,Aeod & Regional Ofcs Re Events Which Occurred Since 870507 Meeting.List of Attendees & Viewgraphs Encl ML20215L3281987-05-0505 May 1987 Summary of Operating Reactors Events Meeting 87-11 on 870420.List of Attendees,Viewgraphs & Input to NRC Performance Indicator Program Encl ML20210T4031987-01-28028 January 1987 Summary of Operating Reactors Events Meeting 87-02 on 870112 of Events Which Occurred Since 870105.List of Attendees,Events Discussed & Summary of Events Encl ML20210T3641987-01-16016 January 1987 Summary of Operating Reactors Events Meeting 87-02 on 870112 Re Events Which Occurred Since 870105.List of Attendees,Events Discussed & Summary of Events Encl ML20205K7591986-12-31031 December 1986 Summary of ACRS 320th Meeting on 861211-13 in Washington,Dc Re New Requirements for BWR Mark I Containments in Regard to Severe Accidents & Proposal for Commission Policy Statement on Deferred Plants (SECY-86-359) ML20211Q6161986-07-23023 July 1986 Summary of Operating Reactor Events Meeting 86-25 on 860721 Re Events Since 860714 Meeting.List of Attendees,Discussion of Events & Status of Assignments Encl.Response Requested for Incomplete Assignments ML20211P1361986-07-16016 July 1986 Summary of 860707 Operating Reactor Events Meeting 86-23 W/ Div Directors & Representatives Re Events Since Last Meeting on 860630.Notification of Inability to Meet Assigned Target Completion Dates for Actions Requested.Viewgraphs Encl ML20206J6561986-06-23023 June 1986 Trip Rept of 860612 Training Session in Lacey,Wa Re Federal Radiological Emergency Response Plans & Meeting W/Utils & State of Wa Concerning Potential Emergency Preparedness Issues.Attendees Listed & Training Agenda Encl ML20141F4091986-04-10010 April 1986 Summary of Operating Reactors Events Meeting 86-10 W/Ofc Director,Div Directors & Representatives Re Events Since 860324.Viewgraphs & Supporting Documentation Encl ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20214E6961986-03-14014 March 1986 Summary of Allegation Review Board 860313 Meeting Re Disposition of Listed Items,Including Case 5-85-042, Allegation 1717 Re Discrimination Against Former Document QA Reviewer for Pullman Power Products ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20141F0461985-12-30030 December 1985 Summary of Operating Reactors Events Meeting 85-28 on 851223.List of Attendees & Viewgraphs Encl ML20138M9281985-12-12012 December 1985 Summary of Operating Reactor Events Meeting 85-25 on 851202 Re Listed Events.Attendee List,Summary of Events Discussed & Viewgraphs Encl ML20134L0291985-07-30030 July 1985 Summary of ACRS Subcommittee on Diablo Canyon 850710 Meeting W/Pg&E in Washington,Dc Re NRC Evaluation of Util long-range Seismic Program for Plant.Fr Notice,Meeting Agenda & List of Handouts Encl ML20127E1361985-05-25025 May 1985 Trip Rept of ACRS Subcommittees on Extreme External Phenomena & Diablo Canyon 850321-22 Meetings in Los Angeles,Ca Re NRC Seismic Margins Program & Long-Term Seismic Program of Diablo Canyon Power Plant ML20128L6941985-05-24024 May 1985 Summary of ACRS Subcommittees on Extreme External Phenomena & Diablo Canyon Units 1 & 2 840524 Meeting in Los Angeles,Ca Re Chairman Palladino 840413 Request for Comments on Technical Paper Which Recharacterizes Hosgri Fault ML20210E6611984-08-22022 August 1984 Summary of 840424 Meeting W/R Kranzdorf,M Mcgee,D Jeter & J Carsel in San Luis Obispo,Ca Re Roles of Federal,State & Local Agencies in Development of Emergency Plans.Allegation Task 80 Closed.Supporting Documentation Encl ML20215G5261983-12-22022 December 1983 Summary of 831222 Meeting Re Clarification of Lockert Termination & Subsequent Grievance Which Originally Presented & Denied by Pullman Power Products on 831219. Attendee List Encl.Partially Withheld Related Info Encl ML20215G5011983-12-19019 December 1983 Summary of 831219 Meeting Re Submittal of Grievance to Pullman Power Products Concerning Termination of Lockert, QA Inspector,On 831215.List of Attendees Encl ML20210E6861983-10-14014 October 1983 Summary of Review Panel 831012 Meeting Re Reinstatement of License.Knighton Aware of Licensee Request for Exemption from Requirements of 10CFR50,App R & Will Determine Required Licensee Action & Schedule.Related Info Encl ML20212M1071982-05-18018 May 1982 Summary of 820518 Meeting W/Bechtel & Util Re Role of Bechtel in Completion of Diablo Canyon Project.Related Info Encl ML20197F6761981-11-17017 November 1981 Summary of 811109-10 Site Visit to Review Physical Model of Backwater & Surrounding Coastal Areas ML20197F6651981-10-14014 October 1981 Summary of 810925 Meeting W/Util Re Various Approaches Available to Resolve UHS Intake Structure Flood Protection Concerns ML20150B5381978-10-18018 October 1978 Summary of 781005 Meeting Re Status of Review Schedule. List of Attendees Encl ML20147F6501978-10-0606 October 1978 Summary of ACRS Subcommittee on Diablo Canyon 780614-15 Meetings Re Status of Seismic Design Criteria & Status of Seismic Reevaluation Program ML20212M4191977-06-29029 June 1977 Summary of 770602 Meeting W/Util,Westinghouse & Ctr for Law in Public Interest Re Plant Seismic Design.Attendee List Encl ML20237F7941975-10-30030 October 1975 Summary of 750828 Meeting W/Util in Bethesda,Md Re Forthcoming Geology & Seismology Submital for Facilities. Attendees List Encl ML20236C3891975-07-24024 July 1975 Summary of ACRS 750605 Meeting in Washington,Dc Re Plant. List of Attendees & Proposed Meeting Agenda Encl ML20236C7821975-06-17017 June 1975 Summary of ACRS Subcommittee 750523 Meeting in Los Angeles, CA Re Plant.List of Attendees & Agenda Encl ML20236C8661975-05-0808 May 1975 Summary of 750404 Meeting W/Util,Westinghouse & John Blume & Assoc in Bethesda,Md Re Seismic Design of Plant ML20237F8101975-02-24024 February 1975 Summary of 750131 Meeting W/Usgs in Denver,Co Re Geology & Seismology Input to Diablo Canyon Ser.Attendees List Encl. W/O Encl ML20236B5141974-09-27027 September 1974 Summary of ACRS Subcommittee 740912 Meeting W/Util & Consultants,Westinghouse & USGS in Washington DC Re Early Review of Util OL Application.Attendance List Encl ML20237F8301974-07-11011 July 1974 Summary of 740705 Meeting W/Util & Earth Sciences Assoc in San Francisco Re Review of Progress of Offshore Geological Investigations Initiated by Util.Attendees List & Summary of Facility Offshore Seismic Interpretation Progress Encl ML20236B8591973-09-0707 September 1973 Summary of 730821 Meeting W/Util & Westinghouse in Bethesda,Md Re Deficiencies in Plant FSAR Submittal. Attendance List Encl ML20237G0671967-08-17017 August 1967 Summary of 670815 Meeting W/Util,Westinghouse,Usc&Gs, Newmark & Hall,Phillips Petroleum & Ja Blume & Assoc Re Continued Review of Seismic Design Bases for Plant. Attendees List Encl ML20237G0881967-05-25025 May 1967 Summary of 670516 Meeting W/Util,Acrs & AEC Consultants Re Discussions of Seismic Design of Diablo Canyon Reactor. Meeting Attended by Listed Persons 1996-11-05
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20245F9261989-08-0707 August 1989 Summary of 890613-15 Meetings W/Util in San Francisco,Ca Re PRA long-term Seismic Program.List of Attendees & Agenda Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML20151D3481988-04-0707 April 1988 Summary of ACRS Subcommittee on Diablo Canyon Meeting on 880223-24 in Burlingame,Ca Re Review of Diablo Canyon Long Term Seismic Program ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20148H6031987-12-15015 December 1987 Summary of ACRS DHR Sys Subcommittee 871117 Meeting in Washington,Dc Re Util Decision Not to Install Dedicated Blowdown Sys at Davis Besse & Implications of Diablo Canyon Loss of Shutdown Cooling Event.Viewgraphs Encl ML20195G3651987-08-0707 August 1987 Summary of CRGR Meeting 116 on 870610 Re Final Rule Amends to 10CFR30,40,50,51,70 & 72 Concerning Requirements for Decommissioning Facility.List of Attendees Encl ML20245C2601987-08-0707 August 1987 Summary of CRGR Meeting 116 on 870610 Re Final Rule Amends to 10CFR30,40,50,51,70 & 72 Concerning Requirements for Decommissioning Facility.List of Attendees Encl ML20215C8721987-06-0808 June 1987 Summary of Operating Reactors Events Meeting 87-10 on 870406 Re Events Which Occurred Since 870330 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams & Significant Events Encl ML20214P6121987-05-27027 May 1987 Summary of Operating Reactors Events Meeting 87-14 on 870512 W/Nrr,Res,Aeod & Regional Ofcs Re Events Which Occurred Since 870507 Meeting.List of Attendees & Viewgraphs Encl ML20215L3281987-05-0505 May 1987 Summary of Operating Reactors Events Meeting 87-11 on 870420.List of Attendees,Viewgraphs & Input to NRC Performance Indicator Program Encl ML20210T4031987-01-28028 January 1987 Summary of Operating Reactors Events Meeting 87-02 on 870112 of Events Which Occurred Since 870105.List of Attendees,Events Discussed & Summary of Events Encl ML20210T3641987-01-16016 January 1987 Summary of Operating Reactors Events Meeting 87-02 on 870112 Re Events Which Occurred Since 870105.List of Attendees,Events Discussed & Summary of Events Encl ML20205K7591986-12-31031 December 1986 Summary of ACRS 320th Meeting on 861211-13 in Washington,Dc Re New Requirements for BWR Mark I Containments in Regard to Severe Accidents & Proposal for Commission Policy Statement on Deferred Plants (SECY-86-359) ML20211Q6161986-07-23023 July 1986 Summary of Operating Reactor Events Meeting 86-25 on 860721 Re Events Since 860714 Meeting.List of Attendees,Discussion of Events & Status of Assignments Encl.Response Requested for Incomplete Assignments ML20211P1361986-07-16016 July 1986 Summary of 860707 Operating Reactor Events Meeting 86-23 W/ Div Directors & Representatives Re Events Since Last Meeting on 860630.Notification of Inability to Meet Assigned Target Completion Dates for Actions Requested.Viewgraphs Encl ML20141F4091986-04-10010 April 1986 Summary of Operating Reactors Events Meeting 86-10 W/Ofc Director,Div Directors & Representatives Re Events Since 860324.Viewgraphs & Supporting Documentation Encl ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20214E6961986-03-14014 March 1986 Summary of Allegation Review Board 860313 Meeting Re Disposition of Listed Items,Including Case 5-85-042, Allegation 1717 Re Discrimination Against Former Document QA Reviewer for Pullman Power Products ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20141F0461985-12-30030 December 1985 Summary of Operating Reactors Events Meeting 85-28 on 851223.List of Attendees & Viewgraphs Encl ML20138M9281985-12-12012 December 1985 Summary of Operating Reactor Events Meeting 85-25 on 851202 Re Listed Events.Attendee List,Summary of Events Discussed & Viewgraphs Encl ML20134L0291985-07-30030 July 1985 Summary of ACRS Subcommittee on Diablo Canyon 850710 Meeting W/Pg&E in Washington,Dc Re NRC Evaluation of Util long-range Seismic Program for Plant.Fr Notice,Meeting Agenda & List of Handouts Encl ML20128L6941985-05-24024 May 1985 Summary of ACRS Subcommittees on Extreme External Phenomena & Diablo Canyon Units 1 & 2 840524 Meeting in Los Angeles,Ca Re Chairman Palladino 840413 Request for Comments on Technical Paper Which Recharacterizes Hosgri Fault ML20210E6611984-08-22022 August 1984 Summary of 840424 Meeting W/R Kranzdorf,M Mcgee,D Jeter & J Carsel in San Luis Obispo,Ca Re Roles of Federal,State & Local Agencies in Development of Emergency Plans.Allegation Task 80 Closed.Supporting Documentation Encl ML20210E6861983-10-14014 October 1983 Summary of Review Panel 831012 Meeting Re Reinstatement of License.Knighton Aware of Licensee Request for Exemption from Requirements of 10CFR50,App R & Will Determine Required Licensee Action & Schedule.Related Info Encl ML20212M1071982-05-18018 May 1982 Summary of 820518 Meeting W/Bechtel & Util Re Role of Bechtel in Completion of Diablo Canyon Project.Related Info Encl ML20197F6651981-10-14014 October 1981 Summary of 810925 Meeting W/Util Re Various Approaches Available to Resolve UHS Intake Structure Flood Protection Concerns ML20150B5381978-10-18018 October 1978 Summary of 781005 Meeting Re Status of Review Schedule. List of Attendees Encl ML20147F6501978-10-0606 October 1978 Summary of ACRS Subcommittee on Diablo Canyon 780614-15 Meetings Re Status of Seismic Design Criteria & Status of Seismic Reevaluation Program ML20212M4191977-06-29029 June 1977 Summary of 770602 Meeting W/Util,Westinghouse & Ctr for Law in Public Interest Re Plant Seismic Design.Attendee List Encl ML20237F7941975-10-30030 October 1975 Summary of 750828 Meeting W/Util in Bethesda,Md Re Forthcoming Geology & Seismology Submital for Facilities. Attendees List Encl ML20236C3891975-07-24024 July 1975 Summary of ACRS 750605 Meeting in Washington,Dc Re Plant. List of Attendees & Proposed Meeting Agenda Encl ML20236C7821975-06-17017 June 1975 Summary of ACRS Subcommittee 750523 Meeting in Los Angeles, CA Re Plant.List of Attendees & Agenda Encl ML20236C8661975-05-0808 May 1975 Summary of 750404 Meeting W/Util,Westinghouse & John Blume & Assoc in Bethesda,Md Re Seismic Design of Plant ML20237F8101975-02-24024 February 1975 Summary of 750131 Meeting W/Usgs in Denver,Co Re Geology & Seismology Input to Diablo Canyon Ser.Attendees List Encl. W/O Encl ML20236B5141974-09-27027 September 1974 Summary of ACRS Subcommittee 740912 Meeting W/Util & Consultants,Westinghouse & USGS in Washington DC Re Early Review of Util OL Application.Attendance List Encl ML20237F8301974-07-11011 July 1974 Summary of 740705 Meeting W/Util & Earth Sciences Assoc in San Francisco Re Review of Progress of Offshore Geological Investigations Initiated by Util.Attendees List & Summary of Facility Offshore Seismic Interpretation Progress Encl ML20236B8591973-09-0707 September 1973 Summary of 730821 Meeting W/Util & Westinghouse in Bethesda,Md Re Deficiencies in Plant FSAR Submittal. Attendance List Encl ML20237G0671967-08-17017 August 1967 Summary of 670815 Meeting W/Util,Westinghouse,Usc&Gs, Newmark & Hall,Phillips Petroleum & Ja Blume & Assoc Re Continued Review of Seismic Design Bases for Plant. Attendees List Encl ML20237G0881967-05-25025 May 1967 Summary of 670516 Meeting W/Util,Acrs & AEC Consultants Re Discussions of Seismic Design of Diablo Canyon Reactor. Meeting Attended by Listed Persons 1989-08-07
[Table view] |
Text
--
r - - - - _ _ _ _ _ _ _ . . _ _ _ . . - _ _ . _ _ _ - - _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ---
.r .
yi
[ %
UNITED STATES
,, NUCLEAR REGULATORY COMMISSION
$ z[ % 3 ,7 WASHINGTON. D. C. 20555 $ PON t%,%,"C /c,*i 4...+,
/ -
OCT 181978 Docket Nos: 50-275 and 50-323 -
APPLICANT. Pacific Gas & Electric Company (PG&E)
FACILITY: Diablo Canyon Nuclear Power Station, Units 1 and 2 (Diablo Canyon)
SUBJECT:
SUMMARY
OF MEETING HELD ON OCTOBER 5, 1978 TO DISCUSS THE DIABLO CANYON REVIEW SCHEDULE We met with the applicant on October 5,1978 in Bethesda, Maryland to discuss the Diablo Canyon review schedule. A list of attendees is provided in Enclosure No.1.
The Diablo Canyon review schedule called for completing our review of seismic design issues and publishing Supplement No. 8 to the Safety Evaluation Report (SER) by November 15, 1978. This would support beginning the safety hearings on schedule on December 4,1978 provided the other hearing preparation items such as filing testimony, identifying and deposing witnesses, and completing discovery were also completed on schedule.
The object of this meeting was to discuss the review status of numerous specific items that were under review and to identify the items of most concern with respect to meeting the schedule. The items we discussed and their status are sunciarized in Enclosure No. 2.
It was apparent that meeting ;he schedule would be difficult. The staff's '
review of seismic design iterrs should have been completed and preparaticn of draf t SER sections shwld have been underway in order to have assurance of meeting the schedule. Irstead, however, the review had been 2/3 to 3/4 completed. It would be necessary to write the drait SER sections and to resolve the remaining items within about the next 2 weeks in order to publish SER Supplement 8 on schedule.
We indicated that we woulo continue attempting to meet the schedule including compressing the time available- for writing and reviewing 7encioW w _ --_ -- - -_ - - - - - - - - - - - - - - _ - - - - - - -
CCI i 81978 the SER supplement. PG&E indicated that it would attempt to provide the information needed to resolve the outstanding items as soon as possible.
I 1m Dennis P. Allison, Project Manager Light Water Reactors Branch tio. 1 Division of Project Management
Enclosures:
As Stated cc:
See next page 1
Mr. John C. Morrissey DCI 181978 Mr. John C. Morrissey Mr. John Marrs Vice President & General Counsel Managing Editor Pacific Gas & Electric Company San Luis Obispo County 77 Beale Street Telegram - Tribune San Francisco, California 94106 1321 Johnson Avenue P. O. Box 112 cc: Philip A. Crane, Jr. , Esq. San Luis Obispo, California 93406 Pacific Gas & Electric Company
- 77. Beale Street Elizabeth S. Bcwers, Esq.,
San Francisco, California 94106 Chairman Atomic Safety & Licensing Janice E. Xerr, Esq. Board "alifornia Public Utilities Commission U. S. Nuclear Regulatory 3bu McAllister Street Commission San Francisco, California 94102 Washington, D. C. 20555 Mr. Frederick Eissler, President Mr. Glenn 0. Bright Scenic Shoreli~ne Preservation Atomic Safety & Licensing Conference, Inc. Board 4623 More Mesa Drive U. S. Nuclear Regulatory Santa Barbara, California 93105 Commission Washington, D. C. 20555 Ms. Elizabeth E. Apfelberg 1415 Cazadero Tolbert Young San Luis Obispo, California 93401 P. O. Box 219 Avila Beach, California 93424 Ms. Sandra A. Silver JJ92 Conejo Avenue Richard S. Salzman, Esq. ,
San Luis Obispo, California 93401 Chai rman Atomic Safety & Licensing Mr. Gordon A. Silver Appeal Board 1792 Conejo Avenue U. S. Nuclear Regulatory San Luis Obispo, California 93401 Commission Washingt- D. C. 20555 Paul C. Valentine, Esq.
321 Lytton Avenue Dr. W. R::a Johnson Palo Alto, California 94302 Atomic Safety & Licensing Appeal Board Yale I Jones, Esq. V. S. Nuclear Regulatory 19th Floor Commission 100 Van Ness Avenue Washington, D. C. 20555 San Francisco, California 94102 Alan S. Rosenthal, Esq.
Mr. Richard Hubbard Atomic Safety & Licensing MHB Technical Associates Appeal Board 366 California Avenue U. S. Nuclear Pegulatory Palo Alto, California 94306 Commission Washington, D. C. 20555
Mr. John C. Morrissey OCT 181978 cc: Ms. Raye Fleming 1746 Chorro Street San Luis Obispo, California 93401 Brent Rushforth, Esq. . .
Center for Law in the Public Interest 10203 Santa Monica Boulevard Los Angeles, California 90067 Arthur C. Gehr, Esq.
Snell & Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. Jares 0. Schuyler, Project Engineer Pacific Gas & Electric Company 77 Beale Street San Francisco, California 941C6 Bruce Norton, Esq.
3216 North 3rd Street Suite 202 Phoenix, Arizona 85012 Mr. W. C. Gangloff Westinghouse Electric Corporation P.; 0. Box 355 Tittsburgh, Pennsylvania 15230 Michael R. Klein, Esq.
Wilmer, Cutler & Pickering 1666 K Street, N. W.
Wasnington, D. C. 20006 David F. Fleischaker, Esq.
102515th Street, N. W.
5th Floor Washington, D. C. 20005 Dr. William E. Martin Senior Ecologist Battelle Memorial Institute Columbus, Ohio 43201 i
ENCLOSURE NO. 1 )
LIST OF ATTENDEES DIABLO CANYON MEETING OCTOBER 5, 1978 NRC STAFF ' PG&E D. Allison J. Hoch J. Stolz M. Williamson 3 D. Vassallo H. Gormly F. Rosa P. Antioches J. Knox M. Furbush P. T. Kuo G. Blane P. Y. Chen et al J. Tourtellotte J. Lawrence Westinghouse W. Sugnet W. Gangloff et al
ENCLOSURE NO. 2 MARKED-UP DIABLO CANYON REVIEW SCHEDULE Indicates the status of items under review as a result of the discussions between the applicant and the NRC S~taff at a meeting on October 5,1978 l
pyggd/S?~ ))ESUL7///4;- Fs9OM MEA 7#'O #Fl0ff/Y2
{
OIABLO CANYON REVIEW SCHEDULE
/OkS/78 STATUS e/:1'E
- 1. ITEMS REQUIRED FOR HEARINGS EPM ALAB 444 (River Bend) material 5' PACE > upM Address Categofy !!! regulatory guides ,
Deapt- de sem/W/sh proyWr o sofs-/7g f ASB Fire protection PSB He , ; c "e vly - ~~; l ;'. d Subuittals in letter 8/3/78 ?
u 'I; ;::r : :5:L,in ?< #N b '# "'!
(4)-:a: m. ;;, . . u
(-M sca w . c lw ...v u i ' i c e . v n
- ( A).-M he c infvimat an act--pc a;sua'ry pccz 14+4 SER ipput -4: n.u ; ' n :* 7/Gl:D- &w,d/N /0/r}7d?
V CPB /fN/f/obslCoh:r}774/S expech?pf' /0/2o/72 Reactor fuel analysis - LOCA + seismic-coolable eometry AB Review completed A few items documented 8/3/78 Revised letter expe::-:d 8/25/78 cF6 SER i nput 'd/'_" "3 co ,e /e/c/
V AA3 AO CER Aspel ex,secfd/s/2o/7g Turcine missiles Review coupleted SER input was due 8/4/78 b R$8 Systems for cold shutdown PSB ASB y (1) Instruments in control room - completed CSG SER input was due 8/1/78 by LPM HMS y (2) Raw water reservoir - Later Resolve issue e6It with tanks below t): _ywer . . "- ^' Q revIewe/
'a .-
D ra :Er G3B f t reuortSu* u cor
( 3) rire jim 8.srA water ta a./ w <h:)a /0/A3/77 and transrer storage tanx Y//o/#, !88 Submittal on hose connections reviewed (Am 66)
-J;nt Farther minor informationYsnina v 5;
'.. E '-
w e.: e xpecte d Q &'&g[g W7O Cd'W" hwas. y m .c l M;; *2 : ?:.
4
./ 13 delsunc quat 1 fica tion o electrica equipment (electrical review)
PSB (1) BUP equipment tnat will not be retested Audit comv1eted ,
, --f: yd. H U 73 Pa i?:aO S ~ A PWA L/ *5 f / P$9/73 A'2/7E y SEB Containment screening metho,ds Review completed p- SEB Containment penetrations d Review completed SEB Containment diagonal rebar 4 pge,/S/cy/
Under review -
p- SEB ~ Containment interior equivalent stiffness 1
4)nder rc view Submited further information 8/18/73 aM 5',e/'"lC' Review corf/etes' y SE3 Contai-nment interior - decoupling Und;r r ,;cw Providd wWe omparison of response spectra 8/25/72 eWews co /M/eso / e/'3cy.s.ssbe 9/2 :/78, "?/ .'/73, /0/Sl78 r> /etes
(/ SEB ontainment in[erior - shear & bending distributien vidNbrther i forma
- EB Aieu/eu c o#f E th*J' tion f/4~/78
" Containment interior - annulus area Review completed Oy SE3 Auxiliary Building Torsion on roof Shear keys Soil bearing pressure Review completed hv SEB Intake Structure dynamic earth pressure ( A-1)
SuomitMu. ther information 8/1/78 Review completed SEB Intake stPJCture piers Unde. . ..cn Sutai proviYu)+her information 8/.2C/78e.scryr/6e sf fe//we CO/Sef"NW Aj~ 78 y'j SEB Intake, ptracture foundation mat ( A-4) d Subni:1'Turtner information 8/25/78
- . . w .;,..,-
F 6 cory Ee2N) 4
4
~
SEB Intake structure stability analysis (A-5)
Su tv u her information 8/25/78 4%g gg fgj/g SEB
.z?uwi% po.str'eessess :y We/?*
tui m ac bu 14+J-t-breaded rtbar coup ie. ; 77:57'frace///r# v//9 Submi t fur 4W ' n'?rmatior. . , /&/ea/
(Was not listed in SER) ,
SEB Turbine building computer codes
-Ur.dcr r Sebs17re/ev% Pw_W/R/ Wiles Atfor*)hds . 7/;z9/,7y Oy SEB
~
Turbine building torsion studies JJrd c r c v i e w f f e a / e w c o ,o /*'/#e/
SEB Turbine building end bents [b#e4WS r'42 4,'Sr
~Under review ' -- >
SEB Turbine building modifications description
~
Under review / c,pzecA- /s//,e ]
- ~
SEB Turbine pedestal gap modification Submited analysis and design modifications 8/18/78 ynce, frow .N, GAro/'-/*w iferiewed .
o,ea/y s/ f/$1/78 O SEB Turbine building items previously submitted Under review (1) Crane trolley vertical restraints (2) Turbine crane w
v (3) Foundation mat , 6 c.ofrr d ll/
(O Lr;in r;d :t:1 (y)f ) Building mathematical models - *M* mr/cMM (S) :) Examples of smoothed spectra ,<.e-# seer e m/d 4/
U) g , Crane matnematical model h SEB Turbine building quantitative assessment of welded & bolted Joints ggy r jfff Submit information 8/25/78 (not listed in SER)
SEB Outdoor tanks t> Q uMcr : . !:,; V,,ro/ery, ops l bnl's -!?".'rw cssr,,c/ofo/
SEB pm; Cranes Mas /mera .<.6oo y,sas/ /,,p _ ,,,/,7,,
ASB GetxHt/nalyses[9/15/78 (m:j be ab?c t: "npr: :'
were exp ecYe/
Strechrdaardy.re.s poi /oJ/e for euM m/z/79 Prow;/e cekt/ o g/y.ces r
Damping of Reactor Coolant System h MEB Review completed MEB Sensitivity of non-linear systems Review completed MEB -Unit i vs Unit 2 reactor coolant system -
Review completed l h ME8 Supporting of Class 2 piping Audit completed 8/4/78, found acceptable eecu.c.en; his infco.a .vu S/2;/70 m h MEB Piping snubber study Review completed, found acceptable SET! input MEB Results of requalification by testing equipment ["'ecnoei,/ revM Many items available for audit 8/9/78 Remajnder available 8/18/7AElih Retest results of Q.16 KV Switcngear pa/er eewkw.
Fcoc.a; accum:ntet;an ;E cepc.;.3 c, 2/;5,. 2- "
MEB Retest of 14" valve, Limitorque and limit switches PSB PSB audit completed, found acceptable subject to -
documentation of test reports ve / M 4 4 M W M MEB has under review j i=& Ay W fo/r/78, Ap si;gre v/ "df StrbnM Final tesJ data results & evaluation 1
^~
MEB Additional in situ tests reports pc;11 a nry rcp;r:s Acr _ . . ..
Final reports in for audit 8/4/78 fppt//T CCWHX a lysis in for audit 8/4/78 / :::.
7pE34 Provide computer code verification 9/i+/78
- FA
, Provide information addressing modes 9/g'78 h MES Test inputs for 14" valve (JndC r '"0 V i Tc' 5/2f '$/30)
Md4t4eM4-dra f t 4 1 f 0FfPat i O r r0 i i Ow ;d 3/-3[ 73 60rrect--eki-5 t-i-ng-dccUner* * * # "" w'*" rMpc C 'r-t 3 Jimitincracceterations -
ReWee.:a coqMes/
MEB Limitorque qualification reports Item dropped, covered by 14" valve above
MES Natural frequency of HCV 637 Under review 6/15/78 [ff30)(hjf #"'N ' [gj #'"fjg# / '#gjg#
MEB Qualification of several valvesMWsot cwp*/fe us///
Several under review 6/29/78 (6/30) gpg,9 jf.g, g M Corrected audit forms for each .::'cc ,
on-page-am ry 3-5E cf S upp' q--:-t ' l'15/~3 f rov /Me f/d2/7,9 MEB t/saw.- ra-tmeest<&-s rs un Ability of active valves to operate In situ test reports for' valve operacility IE/!'!obN?shb etrM,ereceeab); /& cew,rle/?'l h MEB . Further justification, qualification of solid state protection system cabinets Review completed MEB Update tables 7-5 through 7-8 and 10-1 c 7-5A Under review pyff",fof. e Draft of others under review 8/4/78 g,4 Submit in Ame m l - - - - - -,
Fwider se "r? 64 afer & 66le A /m.70 V MEB Nor:le loadings on aux feed pump Audit completed 8/4/78 p Review completed MEB Piping sensitivity studies Review completed MEd Qualification of Rotork actuators PSB Item dropped, not Class IE MEB *st 6 tress calculations on instrument tubes on reactor vessels , , , , , _
n Describe ainlysi= oed resr Hs c m /e r
- 3 mes P m rnye kstex*=nis rcs8 PsowWdi%f /c=/"se sfecba #bz/n f3*owWe def0/kl hsi/e,/0Y g,pr p(fe} / jyg l
O
b '
- 2. ITEMS NOT REQUIRED FOR HEARINGS ,
Environmental qualification of electrical equipment
~
V PSB (1) Normal enviroriment nearly completed Monitoring for NSSS equipment a r T, . _ . . l? :;
-EE3 % :t ( $ & c.
[,4PM e n gXst a-afe . 6, )
(2) Severe environment 80P equipment PSB Justify or ce:w containment penetrations 9/ ;/7C PSB Justify or retest Boston cable,(9/15/76'hos et/-c/d ASB ustify deleting two auxiliary feedwater valves from list - SAittes 7/::/72 fcv/eu'co#//###
PSB SER input ICSB (3) Severe environment NSSS equipment (generje program items)
{
Describf environmental qualification of replacements -
/,5//[4M/Es for Fi cher & Porter transmitters -- L ,;;e. -,:/70 9/,:*//rs fr#/h/
/#//2//t Documen information on Sostman RTD's /J If ' ^ '?' /'3) r/;:f/78 Provide Model numbers on ASCO con}ainment isolation .
solenpid valves J/::/7: f/2 2/73 g RevisFreferences on Fischer & Porter feedwater flow anf steam pressure transmitters 8/:' '77 r/ /rs f DocumentYqualification of RC flow instruments for required environment (which is not severe), S/21/'t f/12/78 Describe 7 qualification of containment pressure bellows and trrnsmitter S/::/73 f/f 2/:rs SER input (4) Later, steam line break analysis is expected to require reevaluation /requalification of a few specific items (5) Miscellaneous generic questions Connectors, review completed
- Polyethylene, review completed Penetrations - dielectric strength, provice} fur *.hers, * ,
information on details of penetration design 8/N/78 Penetrations - fault current, draf t info mation under review 8/4/78, st'eH /es}7/ds 70 /S.c4 sc// /pg '
k t'otNlf Cb/Yr l'e/0 W of s e F S.s / m fe~.rfa ffj g p f -
i csn,me apar ,yps ,g,4,,4, g \f#$s$ )Aa%s<0dimpnhen ,s/ , , ,,,
Y <
'S6 & 'e/057 i 1 nceo& n
~.
8-PSB Degraded grid voltage
/
Strtertt positionFurther information C/:/7: - .ce 2 % G'v meeting s lstafff/a's2-f70Vf/A//"f78 CSB Containment purge system Submittaljexpected 9/!5/7S 9/ap/yp SER input 8/25/78 _ -
If not justified, can use tech. specs.
MTEB Reactor vessel toughness Under evier Question
??eS/**$e to app 9 /' M/'18licant 7/25/78 MTEB Inservice inspection plan e ec[e/
ME8 M7E6fvaluation to LPM _ _ _ _ _ g H E6 Essa:elue/pi,.e to ef x _
RSB Overpressure prot __ection final fix mm Submittalgexpected 8/15/78 SER input Have accepted interim fi RSO -
CSB
> DmdmufZr hacc3 wp g for Unit 1, first c le
,ggyg7 AB Main Submittal steam line break expected 10/2/70-analysis
// ////78 PSB SER input 10/2/73 AB ECCS meta water reactions RSB Complete generic review 9/15/70 Submit revised analysis e/15/70 /0////7B SER input TASK Regulatory Guide 1.97, Revision 1 FORCE Review applicant submittal Not an issue to hold up licensing. To be completed on generic basis HMB Meteorology Review completed SER input completed FINANCIAL Financial update Under rgview Submitf%dd1tional information 8/21/78 SER input 9/15/'? tent at' ve /0/s/rp Pss 'Dik sel Testing techmio( a/JeciMoi%
frovide codNMD 4 of slIb/bolrS
c.
_9 PAS Probability Studies GSB GSB input completed PAS input tc L.rti 0/1/70- ch//e/e!
Publish evaluation ..
CSB Containment access hatch leak testing tech spec Writc r to L?" 2 2dA In/Wf co/1/70
- ffffel n sre % u;ab e ese H.s of wo/enA ear,y ' '
we/Woaist P
A l
_ _ _ _ - _ - _ - _ _ _ _ _ _ _ . _ _ _ _ - _