ML20150B513

From kanterella
Jump to navigation Jump to search
Requests That Util Review Encl Allegations Re Radiation Protection Program & Submit Results of Review & Disposition within 45 Days of Ltr Date.Encl Withheld (Ref 10CFR2.790)
ML20150B513
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/01/1988
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
References
NUDOCS 8807120049
Download: ML20150B513 (2)


Text

p .

l,'  ; .. ,

w

( ,

Ul.01l980 Docket No. 50-461 Illinois Power Company ATTN: Mr. W. C. Gerstner Executive Vice President 500 South 27th Street Decatur, IL 62525 Gentlemen:

NRC Region III has received allegations concerning your radiation protection program at the Clinton Nuclear Power Station. Details of the allegations.are-enclosed and are considered as Exempt from Pubif: Disclosure in accordance with Title 10, Code of Federal Regulations,- Part 2.790(a).

We request that the Illinois Power Company review the allegations, initiate an

' appropriate investigation, and 'ake any actions yon deem appropriate. Inasmuch as the allegations involve activities by, or controlled by, Clinton station personnel, your review and investigation should be perforrad by personnel who do not report through.Clinton station management. We also request that the results of your review and disposition of this matter be submitted to us within

.; 45 days of the date of this ietter. Documentation supporting your results should be maintained at Clinton station for subsequent review by Region III.

In accordance with 10 CFR 2.790 of the Commission's regulations a copy of this letter, excluding the enclosure, will be placed in the NRC Public Document Room.

The response directed by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us is appreciated. Should you have an regarding this matter, please contact Mr. W. Slawinski, at (y questions 312) 790-5618.

Sincerely, 8 ORIG lNE SIGNED SY C. E. NOREUUS

^R8' l Charles E. Norelius, Director h

h Division of Radiation Safety

.$d and Safeguards

Enclosure:

Sumary of Alle MOSURE CONTAINS (10CFR2.790INFORMATIONjation 10CFR2. 790 INFORMATI0F

'y~ UPON SEPARATION THIS 8eo. See Attached Distribution %gp0NTROM RIII RII J RIII 411 RIII f$ 1 Gre asp S1 i i ei h er gus 06/9fEi8 Of2y (, g[f ( M q\1

a -

3

>(- .. , , ,

Illinois Power Company Jgg'g 11'1989 Distribution -  ;

cc w/ enclosure:

D. P.-Hall, Vice President,-

R. D. Freeman, Manager, > 3 Nuclear. Station -  ! -

Engineering Department cc w/o enclosure:

DCD/DCB(RIDS)

Licensing Fee Management- Branch Resident Inspector, R!II Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division-H. S. Taylor, Quality Assurance Division, Sargent & Lundy-Engineers-David Rosenblatt, Governor's Office of Consumer Services Sheldon Zabel,' Esquire, Schiff, Hardin, & Waite L. Larson, Project Manager, General Electric Company Chairman of- DeWitt, County Illinois Department of '

Nuclear Safety D. Schopfer, Project Manager, Sargent & Lundy Engineers

-i; I

ENCLOSURE CONTAINS 10CFR2.790 INFORMATION UPON SEPARATION THIS P' '? DE';0NTROLLED