ML20150B488

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/88-01 on 880101-0215 & Notice of Violation
ML20150B488
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/09/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20150B491 List:
References
IEB-87-002, IEB-87-2, NUDOCS 8803170018
Download: ML20150B488 (2)


See also: IR 05000458/1988001

Text

P

.

In Reply Refer To:

Docket: 50-458/88-01 g

9 (989

Gulf States Utilities

ATTN: Mr. James C. Deddens

Senior Vice President, (RBNG)

Nuclear Licensing

P.O. Box 220

St. Francisville, LA 70775

Gentlemen:

This refers to the inspection conducted by Messrs. D. D. Chamberlain and W. B.

Jones of this office during the period January 1 through February 15, 1988, of

activities authorized by NRC Operating License NPF-47 for the River Bend

Station, and to the discussion of our findings with you and other members of

your staff at the conclusion of the inspection.

Areas examined during the inspection included review of licensee action on NRC

Bulletin 87-02, 10 CFR Part 21 reports, surveillance test observation,

maintenance observation, safety system walkdown, and operational safety

verification. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors. The inspection findings are

documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

cf the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

RIV: SRI [ h RIY DRP/C Dhs)-h/

DRP

DDChamberlain/tw WBJonesf EJHoller LJCc)lan

3 /4 /88 3 /4 /88 3 //

e/ 88 3 / 15 / 8 8

8803170018 880309 / M', f

PDR ADOCK 05000450

G PDR I

I {

, .

Gulf States Utilities -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed By:

L. J. CALLAN

L. J. Callan, Director

Division of Reactor Projects

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Repo t

50-458/88-01

cc w/ enclosures:

Gulf States Utilities

ATTN: J. E. Booker, Manager-

River Bend Oversight

P.O. Box 2951

Beaumont, Texas 77704

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • DRP * Resident Inspector

R. D. Martin, RA *Section Chief (DRP/C)

  • Lisa Shea, RM/ALF * MIS System

RPSB-DRSS *RSTS Operator

  • Project Engineer, DRP/C *RIV File
  • W. Paulson, NRR Project Manager *R. Hall
  • DRS *TSS
  • w/766