-w-
..i 4. , i
MN
.
FEB 2s ley;
Docket Nos. 50-348, 50-364
.~ Alabama Power Company
LATTN: Mr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291-0400
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-348/88-03 AND 50-364/88-03)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
W. H. Bradford on January 12 - February 10, 1988.
The inspection included a
review of activities authorized.for your Farley facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in +.he enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
N'lC requirements.
The violations, references to pertinent requirements, and
elements to be included in your response are described in the enclosed Notice
of Violation.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room-
The responses directed by this letter and its enclosure are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
8803160282 880225
catotNM W
R
ADocg o
8
0,WlD M. O
G
David M. Verre111, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosures:
(See page 2)
' V
Y -d)
L ...
.. _
______ ____-____
_ _ _
_
_ _ _ _ _ .
__ -__ ___-____ - _____
- _ _ _ - _ _
_ -___-________ __________ _____--__
.
st$'
.
.
,
' Alabama Power Company-
2
FED. 2 5 10s
'
. Enclosures:
1.
2.
NRC Inspection Report-
cc w/encls:
.
.
~ (, 0. Whitt, Executive Vice President
(4PI D. Woodard, General Manager -
Nuclear. Plant
cW( G. Hairston .III, Vice President -
Nuclear Support
i)<'W. McGowan, Manager-Safety Audit
t
and Engineering Review
Fulmer, Supervisor-Safety.
gAudit.andEngineeringReview
bc w/encis:
RC Resident-Inspector
-ORS Technical Assistant
c5f' Reeves, Project Manager, NRR
Document Control Desk
State of Alabama
,
RI
RII
R
fp
LModenos
H0ance
DVerrelli
02/ti/88
02/gp/8F
02/ /88