Forwards Insp Repts 50-348/88-03 & 50-364/88-03 on 880112-0210 & Notice of Violation
ML20150B286
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/25/1988
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20150B289 List:
References
NUDOCS 8803160282
Download: ML20150B286 (2)


See also: IR 05000348/1988003

Text

- ;- .

-w-

..i 4. ,

.

i MN

FEB 2s ley;

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

.~ Alabama Power Company

LATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-348/88-03 AND 50-364/88-03)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. H. Bradford on January 12 - February 10, 1988. The inspection included a

review of activities authorized.for your Farley facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in +.he enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

N'lC requirements. The violations, references to pertinent requirements, and

elements to be included in your response are described in the enclosed Notice

of Violation.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room-

The responses directed by this letter and its enclosure are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

8803160282

R ADocg 880225

o catotNM W

G 8 0,WlD M. O

David M. Verre111, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosures: (See page 2)

' V

Y -d)

L ...

.. _ ______ ____-____ _ _ _ _ _ _ _ _ _ . __ -__ ___-____ - _____ - _ _ _ - _ _ _ -___-________ __________ _____--__

.

.

st$' .

,

'

' Alabama Power Company- 2 FED. 2 5 10s

. Enclosures:

1. Notice of Violation

2. NRC Inspection Report-

cc w/encls: . .

~ (, 0. Whitt, Executive Vice President

(4PI D. Woodard, General Manager -

Nuclear. Plant

cW( G. Hairston .III, Vice President -

Nuclear Support

i)<'W.

t McGowan, Manager-Safety Audit

and Engineering Review

Fulmer, Supervisor-Safety.

gAudit.andEngineeringReview

bc w/encis:

RC Resident-Inspector

-ORS Technical Assistant

c5f' Reeves, Project Manager, NRR

Document Control Desk

State of Alabama

,

R RI RII

fp

LModenos H0ance DVerrelli

02/ti/88 02/gp/8F 02/ /88

L___