ML20150A773
| ML20150A773 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 02/29/1988 |
| From: | Elms A, Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| MP-11610, NUDOCS 8803160033 | |
| Download: ML20150A773 (4) | |
Text
t j
General Offices e Seiden Street, Berlin. ConnectH:ut Er!. 7 S N UsI E
~
P.O. BOX 270
~
.n.x
- eta wa wa HARTFORD, CONNECTICUT o6141-o270 L
L J [l(([,C,C~.
(2o3) 665-5000 March 10, 1988 MP-11610 Re:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Reference:
Facility Operating License No. NPF-49 Docket No. 50-423
Dear Sir:
In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 88-3 covering operations for the month of February is hereby forwarded.
Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY
/[w uc t.-
Ste hen E. Scace Station Superintendent Millstone Nuclear Power Station SES/AE:jlm Attachment cc:
W. T. Russell, Region I Administrator, W. J. Raymond, Senior Resident Inspector
'h 8803160033 880229 PDR ADOCK 05000423 R
DCD Pstsno w
8 AVERAGE DAILY UNIT PCHER LEVEL DOCKET NO.
50-421_
UNIT Millstone thit 3 DATE Q3-07-19BS CCMPLETED BY 1. L. It!S 203-HM388 Matml FFnRUARY DAY AVERAGE DAILY FGER LEVEL DAY AVERAGE DAILY IWER LEVEL (tfdE-tET)
(tfdE-NET) 1 0
16 1.120 2
0 17 1.150 3
0 18 1.150 4
0 19 1.154 5
0 20 1.138 6
0 21 1.147 7
0 22 1.139 8
0 23 1.148 9
23 24 1.139 10 65 25 1.148 11 0
26 1.143 12 283 27 1.147 13 469 28 __
1.150 14 6 16 29 1.143 15 832_
/
o tIIIIII kRC CFERATIN6 STATUS REPORT COMPLETED BY REACTOR ENGINEER!h6 IIIIIII
- 1. 00CKET.... 50-423 0FERAi!NG5fATUS
- 2. REPORilNSPERIOD... FEBRUARY 1928 OUTABE + ONLINE HOURS... 247.5 + 448.5 = 696
- 3. UTIL!iY CONTACT.................A. L. ELMS 203 444 5368 8IIIIIIIIIIII 4.
LICENSED THERMAL PCWER.........................................
3411 i MILLSTONE I
- 5. k A"EPL ATE R Ai!NS (6ROSS MWE )................................... 1,253 MW I UNii 3 8
- 6. DES!6N ELECTRICAL R ATING (NET MWE)............................. 1,153.6 8IIIIIIIIiti8
- 8. PAIIRUM CEFEh ABLE CAPACITY (NET PWE)..........................
1,141.9 9.
IF CHANSES OCCUR AB0VE SINCE LAST REFORT, REASONS ARE...........
N/A
- 10. PCWER LEVEL 10 WHICH RESTRICIED, IF ANY (hEt MWE)...............N/A
- 11. REASON FOR RESTRICTICN, IF A%Y....N/A MCNTH YEAR TO DATE CUMULATIVE TO CATE 33333 9*33333338 833838383332833332
- 12. HOURS IN REPCRTINS FIR 10D 696.0 10.0 16,272.0
- 13. N'JMEER OF HOURS THE REACTOR WAS CRITICAL 614.7
'7 12,378.2
- 14. REACICR RESERVE SHUIDOWN HOURS 0.0 s.0 226.0
- 15. HOURS SENERATCR CNLINE 449.5 448.5 12,039.0
- 16. L'N!T RESERVE SHUTDCWN HOURS 0.0 0.0 0.0
- 17. GROSS THERPAL ENERSY GENERATED (RWH) 1,349,671.0 1,349,671.0 39,629,103.4 18.GROSSELECTRICALENERSYGENERATED(FWH) 462,292.5 462,292.5 13,671,565.5 19.hEtELECTRICALEhER6Y6tNERATED(PWH)
A31,737.1 422,750.0 13,026,381.9
- 20. UNIT SERVICE FACICR 64.4 31.1 74.0
- 21. UNIT AVAILAl!L!iY FACTCR 64.4 31.1 74.0
- 22. UNif CAPAtlif FACICR (USINS M;C NET) 54.3 25.7 70.0
- 23. UNIT CAPACITY FACTOR (US!k6 CER NET) 53.8 25.4 69.4 24.UNITFORCEDOUTAGERATE 7.6 7.6 8.5 i
2!. UNIT FCRCED OUTASE HOURS 37.1 37.1 1,111.6 SHUTDCWNS SCHEDULED CVER NEli S!! PONTHS (ifFE, DATE AND DURAi!ON OF EACH)..............
N/A IF CURRENTLY SHUTOCWN, ES!! RATED STARTUP CATE......N/A j
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-423 UNIT Millstone Unit.No. 3 DATE March 3, 1988 COMPLETED BY A. Elms TELEPHONE (203) 444-5388- ~-~
REPORT MONTH FEBRUARY 1988 Page 1 of 1 Method of Licensee Cause and Corrective Duration Shutting Event System Component Action to No.
Date Type (1) (Hours)
Reason (2)
Down Reactor (3) Report #
Code Code Prevent Recurrence 87-12 2-01-88 S
208.8 C
4 N/A N/A N/A Shutdown continuation from last month.
Refuel outage.
88-01 2-10-88 F
37.1 G
3 88-009 JB FCV Reactor trip due to low S/G water level during transfer from Feed Reg Valve to Bypass valve.
88-02 2-12-88 5
1.6 B
N/A N/A N/A N/A Turbine trip for overspeed testing.
1 2
3 4
F:
Forced
{eason:
Method:
Exhibit G - Instructions S:
Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from (LER) File (NUREG-0161)
E - Operator Training & License previous month Examination 5 - Power Reduction 5 F - Administrative (Duration = 0)
Exhibit 1 - Same Source G - Operational Error (Explain) 9 - Other (Explain)
H - Other (Explain)
-