47 MAR 1988
Public Service Electric and Gas Company
ATTN:
S. E. Miltenberger
Vice President and Chief Nuclear Officer
P. O. Box 236
Hancocks Bridge, NJ 08038
-
Gentlemen:
Subject:
Inspection No. 50-354/88-01
This transmits the findings of the routine resident safety inspection by
Mr. R. Borchardt and Mr. D. Allsopp conducted from January 5,1988 to February
8,1988 at the Hope Creek Nuclear Generating Station, Hancocks Bridge, New
Jersey. The inspection consisted of observation of activities, document
reviews a'nd interview $.
The findings were discussed with Mr. S. LaBruna of
your staff.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements, as
set forth in the Notice of Violation, enclosed herewith as Appendix A.
You are required to respond to this letter and in preparing your response, you
should follow the instructions in Appendix A.
The violation involves the lack of a required waste discharge isolation valve
trip function and the failure of Technical Specification required surveillance
tests to identify this discrepancy. We are concerned that similar violations
were cited in NRC Inspection Report 50-354/87-16 and that your corrective action
in response to those violations did not result in a more timely identification
and correction to this problem. Consequently, in your reply to this violation,
please provide your assessment of the effectiveness of the previous corrective
actions and those remedial actions necessary to assure that future actions are
fully effective.
The letter also acknowledges receipt of your January 15, 1988 response to the
violation cited in the NRC Inspection Report 50-354/87-17. As discussed in
the enclosed report, those corrective actions were found to be acceptable.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
OFFICIAL RECORD COPY
IR HC 88-01 - 0001.0.0
1
8803160032 080307
03/04/88
g4
O\\
l
gDR
ADOCK O
{
_
.
Public Service Electric and
"
Gas Company
2
ggg
Your cooperation with us is appreciated.
Sincerely,
-
.
f W O *f
.
I
G
ddwardC.Wenzinger, Chief
M
Projects Branch No. 2
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Inspection Report i;o. 50-354/88-01
cc w/encis:
S. LaBruna, General Manager, Hope Creek Operations
B. A. Preston, Manager, Licensing and Regulation
M. J. Wetterhahn, Esquire
R. Fryling, Esquire
. W. H. Hirst, Manager, Joint Generation Projects Department, Ai.iantic
Electric
Rebecca A. Green, Bureau of Radiation Protection
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
bec w/encis:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
DRP Section Chief
Robert J. Bores, DRSS
George Rivenbark, NRR Project Manager
B. Clayton, E00
R. J. Summers (TI Coordinator), Attention Paragraph 8
DRS Operation Section Chief, Attention Paragraph 8
DRS Plant Systems Section Chief, Attention Paragraph 8
P
I
-
R :D P
Borchardt/rh1
Swetland
Wenzinger
3/h88
3/f/83
3/ /88
0FFICIAL RECORD COPY
IR HC 88-01 - 0001.0.1