ML20149M968

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-271/87-16 on 870801-1030 & Notice of Violation.Util 870910 Response to Violations Noted in Insp Rept 50-271/87-12 Re Nonconservative Trip Setpoints in Toxic Gas Monitoring Sys Responsive to NRC Concerns
ML20149M968
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/25/1988
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20149M969 List:
References
NUDOCS 8802290330
Download: ML20149M968 (3)


See also: IR 05000271/1987016

Text

_.

__

_ _ _

__

_

' & ,:

.

-

"

FEB 251988

Docket No. 50-271-

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. Warren P. Murphy

Vice President and Manager of Operations

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

Gentlemen:

Subject:

Inspection Report No. 50-271/87-16

This rebrs to the routine resident safety inspection conducted by Mr. G. Grant

and others of this office on August 1 - October 30, 1987, at the Vamont Yankee

Nuclear- Power St nion, Vernon,' Ver1nont. The inspection consisted of observa-

tion of activities, interviews with personnel and document reviews. The results

of the inspection are described in the NRC Region I Inspection Report enclosed

with this letter and were discussed with Mr. J. Pelletier of your staff at the

conclusion of the inspection.

This inspection was conducted during regular and backshift periods by five

resident and regional inspectors over a three-month period that included pre-

parations for, conduct of and startup from refueling / maintenance outage XIII.

No safety-significant concerns were noted as a result of their comprehensive

inspections. Licensed operator and non-licensed personnel performance, at all

levels and within all departments, and particularly plant and outage management

performance, was considered superior throughout the inspection period.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation enclosed herewith as Appendix A.

The violation concerns

failures to meet Technical Specification 6,5.8 requirements for radiation

control procedures, which establish controls and set limits on the release of

radioactive material from controlled areas. This violation has been categorized

by severity level in accordance with the "General Statement of Policy and

Procedure for NRC Enforcement Actions", 10 CFR Part 2, Appendix C.

You are

required to respond to this letter and, in so doing, should folluw the

instructions in Appendix A.

$$$22}ggy hhg

G

0FFICIAL RECORD COPY

IR VY 87-16 - 0001.0.0

02/24/88

/

.

- . -

r-

,

.

s

t.

t

Vermont Yankee Nuclear Power

2

FEB 251988

4

Corporation

-

Section 3.4 of this report details the history of a violation brought to your

-

attention in our letter dated February 6,1987 (Inspection Report 86-25) and

the Notice of Violation enclosed therewith, concerning a failure to comply with

'

inservice testing requirements of ASME Section XI.

As described, the - NRC

Office of Nuclear Reactor Regulation has reaffirmed its position on this issue

which indicates that our initial assessment was proper and will therefore

stand.

The corrective actions detailed in your letter of March 12, 1987, in

response to the Notice of Violation, require revision to ensure future regula-

tory compliance on this issue. Please review this matter and respond in writ-

ing within 30 days detailing your additional measures or actions.

We have received your September 10, 1987 reply to the Notice of Violation,

brought to your attention in our letter dated August 21, 1987 (Inspection

Report 87-12), concerning non-conservative trip setpoints in - the Toxic Gas

Monitoring System. Your corrective actions appear responsive to our concerns.

Further evaluation of the long-term effectiveness of these actions will be

,

accomplished during routine inspections.

,

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice", a copy of

,

this letter and the enclosures will be placed in the NRC Public Document Room.

Your cooperation with us is appreciated.

i

Sincerely,

L

'

James T. Wiggins, Chief

Reactor Projects Branch No. 3

Division of Reactor Projects

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region I Inspection Report No. 50-271/87-16

t

,

OFFICIAL RECORD COPY

IR VY 87-16 - 0002.0.0

02/24/88

)

,

-

!6

FEB 251988

'

Vermont Yankee Nuclear Power

3

,'

Corporation

cc w/encis:

J. G. Weigand, President and Chief Executive Officer

.

J, P. Pelletier, Plant Manager

.

J. DeVincetis, Vice President,-Yankee Atomic Electric Company-

R. W. Capstick, L_icensing Engineer, Yankee Atomic Electric Company

C. Richardson, Vermont Public Interest Research Group, Inc.

G. Tarrant, Commissioner, Vermont Department of Public Service

P. W. Agnes, Assistant Secretary of Public Safety, Commonwealth of

Massachusetts

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

State of Vermont

Commonwealth of Massachusetts

bec w/encis:

-

-

Region I Docket Room (with concurrences)

M. Perkins, Management Assistant, DRMA (w/o encis~)

D. Haverkamp, Section Chief, DRP

G. Grant, SRI - Vermont Yankee (w/ concurrences)

H. Eichenholz, SRI - Yankee

C. Warren, SRI - Pilgrim

V. Rooney, PM, NRR

R. Bores, Technical Assistant, DRSS

H. Williams, Project Engineer, DRP (See Sections 7.0 and 14.0)

i

R

RI

/

RI:DRP

GGrant/mjd

DHaverkamp

iggps

2/ d/88

2/?S/88

2/D88

,

0FFICIAL RECORD COPY

IR VY 87-16 - 0003.0.0

02/24/88