LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREMENT 3.5.0 Reactor core Isolation Cooling-4.5.0 attslor core Isolation CoolLqn t
(RCIC) Subsystem (Cont'd)
(RCIC) Subsystem (Cont'd) 2.
From and after the date that d.
Flow Rate Once/3 months the RCICS is made or found to at 1000 psig be inoperable for any reason, i
continued reactor power e.
Flow Rate Once/ operating i
operation is permissible only at 150 psig cycle during the succeeding seven days provided that during such The RCIC pump shall deliver j
seven days the HPCIS is at least 400 gpm for a
- operable, system head corresponding to a reactor pressure of l
3.
If the requirements of 3.5.0 1000 to 150 psig.
cannot be met, an orderly shutdown shall be initiated 2.
When it is determined that the and the reactor pressure shall RCIC subsystem is inoperable, be reduced to or below 150 the HPCIS shall be demonstrated i
psig within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, to be operable immediately and j
weekly thereafter, j
3.5.E Aglos tic Dcoressurization__
4.5.E Automatic Depressurization-l System (ADS)
System _MQ11
(
).
The Automatic Depressurization 1.
During each operating cycle the i
Subsystem shall be operable following tests shall be
[
whenever there is irradiated performed on the ADS fuel in the reactor vessel and i
the reactor pressure is a.
A simulated automatic l
greater than 104 psig and actuation test shall be i
prior to a startup from a Cold n rformed prior to startup Condition, except as specified vter each refueling in 3.5.E.2 below.
outage.
The ADS manual inhibit switch will be included in this test.
t b.
With the rtictor at pressure, each relief valve shall be manually opened i
until a corresponding l
change in reactor pressure i
or main turbine bypass
}
valve positions indicate that steam is flowing from i
the valve.
c.
Perform a test from the alternate shutdown panel to verify that the reitef valve solenoids actuate.
Test shall be performed after each refueling outage prior to startup.
Amendment 42, 57. 104, 109 109 0802240131 800216 DR ADOCK 0 g3
.i t.
CORRECTION TO AMEN 0 MENT 109 DISTRIBUTION:
'Doctet File.
NRC & Local PDRs PDI-3 R/F BBoger MRushbrook DMcDonald SVerga OGC DHagan EJordan OPartlow TRarnhart WJores EPutcher ARCS (10) l GPA/PA ARM /LFMB 1
I l
i 4
l l
\\
i 1
1 i
i l
1 1
f
\\
\\
i J
I 1
2 1
l
.