ML20149K930
| ML20149K930 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/17/1988 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| L-88-71, NUDOCS 8802240045 | |
| Download: ML20149K930 (1) | |
Text
.
'"~~~u~
"i SAFEGUARDS lie 0RifATI0it APL FEBRUARY 1 7. 1983 L-88-71 10 CFR 73.21 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk h
Washington, D.
C.
20555 Gentlemen:
Re:
St. Lucie Units 1 and 2 V
Docket Nos. 50-335 and 50-389 Canal Barrier Status Report Attached is the status report of the Florida Power & Light Company (FPL) plans h eribed in FPL letter L-87-394 dated a attachtent is a Summary of Testing September 24, 1987, Rer.ults for Decemb ne January.
The material enclosed herewith contains safeguards information as defined by 10 CFR 73.21, its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, pursuant to 10 CFR 2.790 (a) (3), the attachment is exempt fros public disclosure.
Very truly yours, ff' C.
O. Noody Executive Vice President COW /GRM/gp Attachment cc:
Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant (w/o attachment) 8802240045 080217 PDR ADOCK 05000335 F
DCD I
GRM/010.SG ENCLO!! RE CONTAINS SAFEGUARDS INFORM. fl0N. UPON SEPARATION' THIS PAGE IS DECONTROLLED.
I)I 1
SAFEGUARDS INFOR'dATiON
-