ML20149K166
| ML20149K166 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 06/01/1994 |
| From: | Christensen H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Demiranda O NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20149K047 | List: |
| References | |
| FOIA-96-32 NUDOCS 9602210465 | |
| Download: ML20149K166 (3) | |
Text
.
JUN - l 1993 MEMO TO: O. DeMiranda, EICS From:
H. Christensen, Acting Chief, DRP Branch 1
Subject:
REVIEW OF RII-93-A-0125 I have conducted a review of the investigation material for allegation RII A-0125. The following information may need to be paneled.
Page 13 line 19-25, page 14 line 1-8, page 15 line 21, page 34 line 19-25, and page 82 line 13-25.
Additionally, one document was provided to OI, a copy of i*. is at the beginning of the OI package.
0dr k 3
H. Christensen M
k 0
9602210465 960201
.9 '
2 PDR FOIA LATIMER96-32 PDR ivs gr
I i
e' November 23, 1994 i
CASE CHRONOLOGY RII-93-A-0125 FACILITY: ROBINSON OPENED BY:
O.
DEMIRANDA lDATE/ INT'LS ACTIVITY SECTION 6/27/93 -ODM LETTER FROM CI DTD 6/27/93 RCVD 7/21/93.
1 ATTACHED WITH LTR DTD 5/27/93.
CI CLAIMS THE 5/27/93 LTR WAS PROVIDED TO RII AND HE HAS NOT HEARD ANY RESPONSE.
RII SEARCHED ALL AREAS INCLUDING MAIL ROOM AhD WE HAD NEVER RCVD 5/27/93 LTR.
ALLEG: ALGD TERMINATION OF EMPLOYMENT FOR REPORTING ERROSION/ CORROSION PROBLEMS TO THE NRC.
7/8/93 -ODM YELLOW STICKY NOTE PREPARED BY JENKINS WHICH 1
DENOTES THE MINUTES OF A MANAGEMENT /ARP MEETING WITH EBNETER.
AP:
1.
EICS CONTACT ALGR AND ACKNOWLEDGE RECEIPT f
OF HIS LETTER, 2.
DRS INSPT, 3.
OI ?
s'13/93 -CDM ETTER TO ALGR ACKNOWLEDGING RECEIPT OF HIS 1
6/27/93 LETTER AND ADVISING OF DOL REPORTING REQUIREMENTS EVEN THOUGHT FILING TIME HAS EXPIRED.
s 23/93 -CDM ALLEGATION PACKAGE DTD 8/23/93 RCVD 8/30/93.
1 fL 2,97 -COM ARP MEETING MINUTES.
2 l
AP: ENG/DRS INSPT 1.19/94 -ODM CLOSURE MEMO FROM DRS/JULIAN WITH ATTACHED 3
INSPECTION REPORTS 92-13 & 93-20.
~ 25/94 -ODM MEMO FROM VORSE TO URYC.
REQUEST STAFF REVIEW SUPPLEM OI TRANSCRIPT (OI CASE NO. 2-93-040 ENTAL DISCRIMINATION) AND ADVISE OF RESULTS ALONG WITH FILE PRIORITY.
A NEW TECH ISSUE WAS PROVIDED DURING THE INTERVIEW.
EICS DISTRIBUTED TRANSCRIPT TO GIBSON & VERRELLI REQUESTING REVIEW ISD COMMENTS BY 3/29/94 PER DIRECTION OF D/EICS.
4 13/94 -CDM RAC STATUS LETTER TO ALGR 3
9 26/94 -CDM ALGR CALLED RAC REQUESTING STATUS OF CASE.
RAC NONE ADVISED THE ALGR THE ST/sFF IS STILL REVIEWING TECH ISSUE.
11/23/94 -
RAC STATUS LETTER TO ALGR 3
CDM N
c.
j l
l
m.
e f
7/12/95;ODM ALGR CALLED REQUESTING STATUS.
SAC ADVISED ALGR
'NONE THAT WE WERE NEARING COMPLETION OF OUR REVIEW AND THAT HE WOULD BE RECEIVING A LETTER WITH OUR FINDINGS HOPEFULLY IN THE NEAR FUTURE.
8/22/95 LMS LCA l
t
!