Text
4 , in
-
4
da.
<
,
'
.:r
.
4
7
,
,.
. July 22; 1997.
EE. Thomas Boulette, PhD
L Senior Vice President - Nuclear
~
< Boston' Edison Company
Pilgrim Nuclear Power Station
' 600 Rocky Hill Road
' Plymouth, Massachusetts 02380-5599
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-293/97-03 AND NOTICE OF
- VIOLA'llON
..
- Dear Mr. Boulette:
On June 24,1997 the'NRC completed an inspection at the Pilgrim Nuclear Power Station in
Plymouth, Massachusetts. The enclosed report presents the results of that inspection.
During' the 8 weeks covered by this inspection period, your conduct of activities at the
t
L
Pilgrim facility was generally characterized by safe plant operations. ' The emergency
preparedness (EP) program and latest initiatives were inspected. The inspection consisted
"
p,
_of selective reviews of procedures and records and interviews with licensee personnel. No
~
safety concerns or violations were identified. The program was found to be directed
'
.toward public health and safety. Of particular note was the generally smooth transition in
,
the transfer of the offsite reception center from the South Weymouth naval air station to
U
the Braintree high school. A solid radwaste/ transportation program inspection was also
conducted. Shipping activities met the new regulatory requirements; however, the quality
p
=~
assurance oversight of the radwaste/ transportation program area was considered very
weak.
,
Based on the results of this inspection, we identified one violation of NRC requirements
when a station services worker tied open the boiler room door which forms part of the
,
-radiological controlled area boundary. You are required to respond to this letter and should
F
follow the instructions specified in the enclosed Notice when preparing your response, in
your response, you should document the specific actions taken and any additional actions
%
'you plan to prevent recurrence. Your response may reference or include previous docketed
l
.' correspondence if the correspondence adequately addresses the required response. After
- reviewing'your response to this Notice, including your proposed corrective actions and the
.
results of future inspections, the' NRC will determine whether further NRC enforcement
action isnecessary to ensure compliance with NRC regulatory requirements.
'
Lin accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
.
.
,,
and its enclosures will be placed in the NRC Public Document . oom (PDR). To the extent
~
R
'!~
.
possible, your response'should riot include and personal privacy, proprietary, or safeguards
',
information so that it'can be.placed in the PDR without redaction.
g
1
\\
f.0I
g
%l
'
.-
19707290212 970722
.W
.
... . >
ADOCK 05000293
9
.
w ot -
e.
PDR.
g
-
.
.
_
_
_
_ .
__
_
. . _ . _ _ _ - - . _ _ _ , _
jk . , .
m[
,
q
.E. Thomas Boulette, PhD
2
.
.,
-
The responses directed by this letter and the enclosed Notice are not subject to the
clearance procedures of the Office of Management and Budget as required by the
-
Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
Your continued cooperation with us is appreciated.
Sincerely,
Original Signed By:
Richard Conte, Chief
Reactor Projects Branch 8
l
Division of Reactor Projects
!
Enclosures:
2. NRC Inspection Report 50-293/97-03
3. BECo Presentation Material From June 5,1997 Onsite Meeting
Docket No. 50-293
License No. DPR-35
t
l
4
1
4
i
-
-
.
.
-
.
.- -
- --
.W
.
,; .
.
-
-:
E. Thomas Boulette, PhD
3
.
cc w/ encl:
L. Olivier, Vice President - Nuclear and Station Director
.
T. Sullivan, Plant Department Manager
"
N. Desmond, Regulatory Relations
D. Tarantino, Nuclear Information Manager
R. Hallisey, Department of Public Health, Commonwealth of Massachusetts
The Honorable Therese Murray
B. Abbanat, Department of Public Utilities
Chairman, Plymouth Board of Selectmen
Chairman, Duxbury Board of Selectmen
Chairman, Nuclear Matters Committee
Plymouth Civil Defense Director
' P. Gromer, Massachusetts Secretary of Energy Resources
J. Shaer, Legislative Assistant
J. Fleming
A. Nogee, MASSPIRG
Regional Administrator, FEMA
Office of the Commissioner, Massachusetts Department of Environmental Quality
Engineering
Office of the Attorney General, Commonwealth of Massachusetts
i
T. Rapone, Massachusetts Executive Office of Public Safety
i
Chairman, Citizens Urging Responsible Energy
)
Commonwealth of Massachusetts, SLO Designee
.
.
4
.
<
_
..
-
,.
. .
..
.- .
.
. . - .
.
. ..
- .- . . . .
..
l
,
,, ;;; V
,
7 'i,;
E. Thomas Boulette, PhD'
4
~
' -
. Distribution' w/ encl:'
- Region i Docket Room (with concurrences)
PUBLIC
-Nuclear Safety information Center (NSIC)-
- .NRC Re'sident inspector -
R. Conte, DRP '
E. Connor, DRP
C. O'Daniell, DRP.
' Distribution w/enci (VIA E-MAIL):
P. Milano,- NRR
A. Wang, NRR
'
'
4 W. Dean, OEDO
.R. Correia, NRR
~ F. Talbot, NRR
~DOCDESK'
Inspection Program Branch, NRR (IPAS)
l
l
1
DOCUMENT NAME: g:\\ branch 8\\pg\\pil9703.bek
To receive e copy of tNo document,Indleate in the bos: 'C' = Copy without ottachment/eMiosure
"E* = Copy with attachment /enclocute
_
j
- N* a No copy '
'
i
7
j
OFFICE
RUDRP
f) , / l.
RUDRP
M,[
/
l
/
l
)
'
NAME
R. Laura
y yp
R. Conte M My
DATE
7/18/97
.I
,yf
7G97
//
j
"
'
- OFFICIAL RECORD CO 'Y
_
-
-
..
b
,
.
%n
.
-