Forwards Insp Rept 50-346/94-13 on 941025-1208 & Notice of Violation
ML20149J151
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/28/1994
From: Lanksbury R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stetz J
CENTERIOR ENERGY
Shared Package
ML20149J155 List:
References
NUDOCS 9501050061
Download: ML20149J151 (2)


See also: IR 05000346/1994013

Text

._. _ .

_

Mf j/g

l

.

I

t

.

December 28, 1994

1

-

Centerior Service Company

l

ATTN: Mr. John P. Stetz

Vice President-

h:

Nuclear - Davis-Besse

c/o Toledo Edison Company

300 Madison Avenue

Toledo, OH 43652

l

Dear Mr. Stetz:

SUBJECT: ROUTINE RESIDENT INSPECTION AT DAVIS-BESSE (50-346/94013(DRP))

This refers to the inspection conducted by S. Stasek, C. Lipa, and D. Shepard

of this office on October 25, 1994, through December 8, 1994. The inspection

included a review of activities authorized for your Davis-Besse Nuclear Power

Station. At the conclusion of the inspection, the findings were discussed

with those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

p-

and representative records, interviews with personnel, and observation of

activities in progress.

'

Based on the results of this inspection, certain of your activities appeared

I

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice). Tha violation is of particular concern because it

J

involved wcaknesses in yo9r implementation of foreign material exclusion (FME)

[

controls around the reacte cavity and is the third such violation related to

4 1

FME issued since August 1994 (reference NRC inspection reports 50-346/94006

J

and 50-346/Nell). A management meeting with you and members of your staff

II

was held in the Region III office on November 14, 1994, to discuss, in part,

i}LlI

refueling outage related issues including those involving FME.

p

i

Although 10 CFR 2.201 would normally require you to submit a written statement

of explanation to this office within 30 days of the date of this letter

transmitting the enclosed Notice, we note that you now appear to be

impleenting sufficient corrective actions to prevent further recurrence.

Those actions were reviewed during this inspection as documented in the

j

enclosed report. Therefore, no response with respect to this matter is

required at this time.

In addition, certain other of your activities also appeared to be in violation

of NRC requirements. Specifically, a spent fuel pool (SFP) gate was lifted

over the SFP without an operable emergency ventilation system in violation of

I

your Technical Specifications. However, as described in the enclosed

inspection report, the violation was identified by licensee personnel,

ft

adequate corrective actions were taken, and appropriate notifications made.

'

Therefore, this violation will not be subject to enforcement action because

]

your efforts in identifying and correcting the violation met the criteria

j p

9501050061 941228

'

!

PDR

ADOCK 05000346

i

G

PDR

f[g O{O(b

i

- _ - _ _ _ _ _ _ _ .

'

.

Centerior Service Company

2

specified in Sectior. VII.S.2 of the " General Statement of Policy and

Procedures for NRC Enforcement Actions," (Enforcement Policy,10 CFR Part 2,

Appendix C).

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Roger

absbbhyfCief' " ** " ~/

-

Reactor Projects Section 3B

Docket No. 50-346

Enclosures:

1.

Notice of Violation

2.

Inspection Report

No. 50-346/94013(DRP)

cc w/ encl:

D. C. Shelton, Senior

Vice President - Nuclear

J. K. Wood, Plant Manager

W. T. O'Connor, Manager

Regulatory Affairs

State Liaison Officer, State

of Ohio

Robert E. Owen, Ohio

.

Department of Health

A. Grandjean, State of Ohio,

Public Utilities Commission

Distribution:

Docket File w/ encl

DRP w/ encl

PUBLIC IE-01 w/ enc 1

RIII PRR w/ encl

OC/LFDCB w/ encl

SRI, Davis Besse w/ encl

Project Manager, NRR w/ encl

g g., i .. . .. , . , i n i . .

. .

. .. . i . i n. 6.. .c.

c.,, .

.. .

..nf.

i .c. . c.,, . . ..

...f.

i ... .

OFFICE

RIII\\l M //

RIII

fc.

RIII

//

RIII

M

NAME

Burdick b

McBarger 9pfd

Burgess [

Olteanu MCO

DATE

(Sec.1.2I

(Sec. 5.1)

(Sec. 4.h f t/d[9@

Cht//V

0FFICE

RIII

7)

NAME

Lanksbury k

DATE

NMb

0FFICIAL RECORD COPY