e
,
,
FEB 121988
o
Docket No. 30-29
Yankee Atomic Ele;tric Company
ATTN:
Mr. Jahr. DeVincentis
Vice c resident and Acting
W nager of Operations
1671 Worcester Road
Framiagham, Massachusetts 01701
Gentlemen:
Subject:
Region I Inspection Report No. 50-29/87-16
This
refers
to
the
routine
resident
safety
inspection
conducted
by
Mr. H. Eichenholz and Mrs. C. Carpenter of this office on October 27, 1987 -
January 19, 1988, at the Yankee Nuclear Power Station, Rowe, Massachusetts.
The inspection consisted of observations of activities, interviews with per-
sonnel, independent measurements and document reviews.
The results of the
inspection are described in the NRC Region I Inspection Report enclosed with
this letter and were discussed with Mr. N. St. Laurent of your staff at the
conclusion of the inspection.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the "General Statement of
Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C
You are required to respond to this letter and in
preparing your response, you should follow the instructions in Appendix A.
The violation (described in Appendix A) concerns the failure to notify the NRC
as required by 10 CFR 50.72 (b)(1)(A) within one hour of the initiation of
plant shutdown required by Technical Specifications.
You cooperation with us in this matter is appreciated.
Sincerely,
MM:a1 Civ.m q.,
James T. Wiggins, Chief
Reactor Projects Branch No. 3
Division of Reactor Projects
8802220270Og2g29
ADOCK O
Q
OFFICIAL RECORD COPY
IR YR 87-16 - 0001.0.0
l [
02/10/88
/
_,--
J
__
___ _ _ _ _ - _ _ _ _ _ _
__
_
,
'
-Yankee Atomic Electric Company
2
FEB 121988
.
Enclosures:
1.
Appendix A, Notice of Violation
2.
'NRC Region I Inspection Report Number S0-29/87-16
cc'w/encis:
N. N. St. Laurent, Plant Superintendent
J. E. Tribble, President
G. J. Papanic, Jr. , Senior Project Engineer - Licensing -
P. W. Agnes, Assistant Secretary of Public Safety,- Commonwealth of
-
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
CommonwealthofMassachusetts(2)
bec w/encis:
Region I Docket Room (with concurrences)
M. Perkins, Management Assistant, DRMA (w/o encis)
D. Haverkamp, Section Chief, DRP
H. Eichenholz, SRI - Yankee (w/ concurrences)
'
G. Grant, SRI - Vermont Yankee
R. J. Bores, Technical Assistant. DRSS
J. Kaucher, Project Engineer, DRP
R. Summers, Project Engineer, DRP (See Section 15)
N. Blumberg, Chief, OPS, DRS (See Sections 6 and 9)
R. Bellamy, Chief, FRS&SB, DRSS (See Section 9)
W. Lazarus, Chief, EPS, DRSS (See Section 9)
.
!
RI:DRP
RI:DRP
RI:0RS
RI:DRSS
JI:DRP
(Eic
h Iz/mjd
D v r mp
NBlumberg
R
JWiggins
,
t,ip s 6&9
S
on 9
L
-
,
2//2-/88
2/It488
2/f88
2/
88
2/l488
0FFICIAL RECORD COPY
IR YR 87-16 - 0002.0.0
02/10/88