Forwards Insp Rept 50-424/88-02 on 871222-880129.No Violations or Deviations Noted
ML20149H023
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/12/1988
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20149H026 List:
References
NUDOCS 8802190067
Download: ML20149H023 (2)


See also: IR 05000424/1988002

Text

'

'

FEB 1213es

Docket No. 50-424

License No. NPF-68

Georgia 90wer Company

ATTN: Mr. James P. O'Reilly

Senior Vice President-

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-424/88-02

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

Pessrs J. F. Rogge, R. J. Schepens, and C. W. Burger on Dece-ber 22, 1987 -

January 29, 1988. The inspection included a review of activities authorized

for yeur Vogtle facility. At the conclu', ion of the inspection, the findings

were discussed with those renbers of your staff identified in the enclosed

inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective eraninations of procedures

and representative records, interviews with personnel, erd ob:ervation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

Your attention is invited to unresolved items identified in the inspection

recort. These matters will be pursued during future inspections.

In accordance with Section 2.790 of the NPC's "Rules of Practice," Part 2

Title 10, Code of Federal Regulations, a copy of this letter and the enclosure

will be placed in the NRC Public Docurent Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

V rgil L. Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure: (See page 2)

0802190067 080'12

PDR ADOCK 05060424

0 DCD [

.

,

Georgia Power Cornpany 2

,

FEB 1 <.13s8

Enclosure:

NRC Inspection Report

cc w/ encl:

P. D. Rice Vice President, Project

Director

C. W. Hayes Vogtle Quality

Assurance Manager

G. Bockhold, Jr., General Manager.

Nuclear Operations

L. Gucwa, Manager, Nuclear Safety

and Licensin

J. A. Bailey, gProject Licensing

Manager

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

D. Kirkland, !!!, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

bec w/ enc 1:

E. Reis. OGC

J. Hopkins, NRR

M. Sinkule. R!!

DRS Technical Assistant

NRC Resident Inspector

Document Control Desk

State of Georgia

i

'

R!! RI!

CPatterson:er PSinkule

02/t./88 02/ /88 l

Gw. l

j

]