Forwards Insp Repts 50-424/88-05 & 50-425/88-04 on 880111-15 & Notice of Violation
ML20149G635
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/09/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20149G637 List:
References
NUDOCS 8802180341
Download: ML20149G635 (2)


See also: IR 05000424/1988005

Text

'.

f

-

'. ,,

.

-

.

FEB 091988

Docket Nos. 50-424, 50-425

L4 cense Nos. NPF-68, CPPR-109

Georgia Power Company

ATTN: Mr. James P. O'Reilly

Senior Vice President-

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

,

'

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT N05. 50-424/88-05 AND 50-425/88-04)

This refers to the Nuclear Regulatory Comnission (NRC) inspection conducted by

G. A. Hallstrom on January 11-15, 1988. The inspection included a review of

activities authorized for your Vogtle facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report. -

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activfties in progress.

The inspection findings-indicate that certain activities appeared to violate i

NRC requirements. The violation, references to pertinent requirements, and j

elements to be included in your response are described in the enclosed Notice i

of Violation. l

l

Your attention is invited to the unresolved items identified in the inspection i

report. This matter will be pursued during future inspections. l

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room. -

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

8802180341 880209

f 0

f

fE0 f

.., *,

'

..

.

.

FEB 091988

.

' Georgia Power dompany 2

Should you have any questions concerning this letter, please contact us.

Sincerely,

Alan . Herdt, Chief

Engineering Branch

Division of Reactor Safety

Enclosures:

1. Notice of Violation -

2. NRC Inspection Report

cc w/encis:

P. D. Rice, Vice President, Project

Director

C. W. Hayes, Vogtle Quality

Assurance Manager

G. Bockhold, Jr., General Manager, *

Nuclear Operations

L. Gucwa, Manager, Nuclear Safety

and Licensing

J. A. Bailey, Project Licensing

Manager

B. W. Churchill, Esq., Shaw,

-

Pittman, Potts and Trowbridge ~

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

bec w/encls: l

E. Reis, 0GC i

M. Miller, NRR .

I

M. Sinkule, RII -

DRS Technical Assistant

NRC Resident Inspector

State of Georgia

Document Control Desk

RII g f'I RII

GHal'strcm:tm JB a e MSinkule

02/6/88 02h)/88

i

02/g/88 '

1

+ . . . ., - .