Insp Repts 50-424/88-05 & 50-425/88-04 on 880111-15. Violation Noted.Major Area Inspected:Maint Activities, Welding & Nonwelding Activities Associated w/safety-related Piping,Housekeeping & Matls Control & 10CFR50.55(e) Items
ML20149G709
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/05/1988
From: Blake J, Hallstrom G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20149G637 List:
References
50-424-88-05, 50-424-88-5, 50-425-88-04, 50-425-88-4, NUDOCS 8802180372
Download: ML20149G709 (16)


See also: IR 05000424/1988005

Text

.

p2 Kro

UNITED STATES

"

o

.

-

g

'o

NUCLEAR REGULATORY COMMISSION

3%

7*

REGION ll

E

I o

101 MARIETTA STRE ET, N.W.

'

' f

ATLANTA, GEORGI A 30323

%; ~]]

.....

Report Nos.:

50-424/88-0! and 50-425/88-04

Licensee:

Georgia Power Company

P. O. Box 4545

-

-

Atlanta, GA 30302

Docket Nos.:

50-424 and 50-425

License Nos.:

NPF-61 and CPPR-109

Facility Name:

Vogtle 1 and 2

-

Inspection Condu ed:

January 11-15, 1988

Inspector:

.ach t.e.

c/

  1. [ M

GT AT be1

trom

Date Signed

Approved by:k -

[

A

6

J. J. Blate, Section Chief

' Dats Signed

Ofvtp. ion of Reactor Safety

Engi

ering Branch

SUMMARY

Scope:

This routine, unannounced inspection was in the areas of maintenance

activities (Unit 1),' welding and nonwelding activities associated with

safety-related piping (Unit 2), housekeeping and materials control (Unit 2),

and licensee identified 50.55(e) items (Units 1 and 2).

Results:

One violation was identified.

Lack of Materials Control - Paragraph

7.b.(4).

_

)

8802180372 880209

PDR

ADOCK 05000424

0

DCD

-

~

.

_

. . _

__

<

.

.

.

.

.

.

.

-

.

-

REPORT DETAILS

1.

Persons Contacted

Licensee Employees

,

,

  • J. Austenkampe, Engineering Support Superintendent
  • G. Bockhold, General Manager of Nuclear Operations
  • L. N. Brooks, Civil Discipline Manager, Construction
  • C. M. Burke, Senior Quality Assurance (QA) Field Representative,

Operations

-

.

  • E. L. Coleman, Project Welding Supervisor, Construction
  • C. L. Cross, Senior Regulatory Specialist, Nucicar Safety and Compliance

(NSAC), Operations

  • D. M. Fiquett, Assistant Construction Project Manager - II
  • J. J. Gilmartin, Mechanical Staff Engineer, Construction

,

'

  • L. B. Glenn, Manager of Quality Control, Construction
  • T. Greene, Plant Support Manager, Operations
  • M. Griffis, Maintenance Manager, Operations
  • E. D. Groover, QA Site Manager, Construction
  • C. W. Hayes, Project QA Manager
  • W. F. Kitchens Operations Manager
  • R. E. Lide, Engineering Support Superintendent
  • G. A. McCarley, Project Compliance Coordinator, Construction
  • A. L. Mosbaugh, Assistant olant Support Manager, Operations

i

~*R. M. Odom, NSAC Plant Engineering Supervisor, Operations

l

  • S. A. Philips, Maintenance Superintendent Operations
  • P. D. Rice, Vice President and Vogtle Project Director
  • J. E. Sanders, Assistant Construction Project Manager
  • J. E. Swartzwelder, NSAC Manager, Operations
  • J. M. Watson, QA Specialist, Construction

Other licensee employees contacted included construction craftsmen,

engineers, technicians, mechanics, and office pe.'sonnel.

Other Organizations

  • J. M. Agold, Southern Company Services (SCS), Preservice Inspection

Coordinator

  • R. W. Braddy, Bechtel Power Corporation (BPC), Mechanical Core

,

Discipline Project Engineer

  • D. L. Carlson, BPC, Codes Engineer
  • B. L. Edwards, Pullman Power Products (PPP), Rt

dent Construction Manager

  • C. Garrett, Oglethorpe Power Corporation (OPC), Operations Engineer
  • R. L. Keck, SCS, Inservice Testing Supervisor
  • J. E. Miller, PPP, QA Manager
  • D. Smith, OPC, Construction Engineer
  • D. W. Strohman, BPC, Project QA Engineer
  • P. R. Thomas, BPC, Unit 2 Readiness Review

_

_

.

.

.

.

-

-

2

,

NRC Resident Inspectors

  • R. Schepens, Senior Resident Inspector (Construction)
  • C. Burger, Resident Inspector (0perations)
  • Attended exit interview

.

.

2.

Exit Interview

The inspection scope and findings were summarized on January 14, 1988

(Unit 2), and January 15,1988 (Unit 1), with those persons indicated in

Paragraph 1 above.

The inspector described the areas inspected and

d.iscussed in detail the inspection findings. No dissenting comments were

-

received from the licensee.

The licensee did not identify as proprietary

any of the materials provided to or reviewed by the inspector during this

inspection.

3.

Licensee Action on Previous Enforcement Matters

Licensee Actions on previous enforcement matters within the scope of this

s.

inspection were not complete.

4.

Unresolved Items

Unresolved items are matters about which more information is required to

determine whether they are acceptable or may involve violations or

deviations.

One unresolved item identified during this . inspection is

discussed in Paragraph 7.b.(1).

5.

Independent Inspection Effort

Housekeeping (548348), Material Identification and Control (429028), and

Material Control (429408)

The inspector conducted a general inspection of Unit 2 contaimnent and

'-

,

Reactor Auxiliary Building to observe activities such as housekeeping,

material identifica. tion and control; material control, and storage.

Within the areas examined, no violations or deviations were identified.

6.

Maintenance Program (62702) (Unit 1)

The inspector reviewed the licensee's maintenance program to verify that

it is

in compliance with Technical Specifications, Regulatory

Requirements, commitments in the application, and industry guides or

l

standards. The review is described below:

a.

Procedures

The inspector reviewed maintenance program related requirements in

the following procedures:

.

.

-

- . --

v

.

,

i

.

.

-

3

Procedure No.

Revision

Title

20407-C

8

Maintenance Conduct of Operations

20427-C

5

Maintenance Cleanliness and

Housekeeping Control

'

'

20012-C

4

Mechanical Maintenance Personnel

Training and Qualification

20016-C

1

Predictive Maintenance Program

20100-C

2

ASME Section XI Repair / Replacement

-

Program

20112-C

1

' Welding Organization

25361-C

0

General Notal Removal

20110-C

3

Weld Control Program

20405-C

7

Control of Maintenance Shop

Measuring and Test Equipment

25340-C

0

Procurement of Welding Filler

Material

_ _ . .

25330-C

5

Control of Welding Cr,nsumables

20111-C

1

Welding Manual / Procedure Revision

25300-C

0

General Welding Procedure

20113-C

0

Welding Procedure Qualification

' ~.

20114-C

1

Welder Qualification

,

'

20115-C

0

Welder Qualification Maintenance

20117-C

0

Welder Qualification - ASW D1.1

25302-C

0

Structural Welding

20408-C

1

Control of Grinding Wheels,

Discs, and Wire Brushes

25350-C

2

Control of Purging and Purge Dam

Control

25360-C

0

Post Weld Heat Treatment

.

-

_

. .

-

~

.

.

.

.

.

.

4

b.

Corrective Maintenance

The inspector reviewed the procedures described in 6.a. to verify

that:

Written procedures have been established for initiating requests

-

for routine and emergency maintenance.

>

,

Criteria and responsibilities have been established for review

and approval of maintenance requests including emergency

maintenance requests.

Criteria and responsibilities have been established that form

,

the basis for designating the activity as safety-related or not

safety-related,

j

Provisions and responsibilities have been established that form

the basis for designating the activity as safety-related or not

safety-related.

Methods and responsibilities have been designated for performing

functional testing of structures, systems, or components

following maintenance work and/or prior to their being returned

to service.

Administrative controls of maintenance _ activities require that

the following records will be prepared, assembled, and reviewed

for transfer to records storage:

approvals of maintenance requests

-

identification of the personnel who performed the

-

maintenance task

identification of the personnel who inspected the

-

maintenance work

'

cause of the malfunction or failure which necessitated the

-

maintenance work, including generic implications of the ~

failure

description of the corrective action taken

-

identification of the post-maintenance functional testing

-

performed

identification

of

personnel

that

perfonned

the

-

post-maintenance testing

1

identification of replacement parts or materials used

-

,

a

'

.

.

.

.

.

l

5

,

identification of test and measuring equipment used

-

Responsibility has been established to assemble and review the

records identified above.

Requirements have been established for reviewing completed

corrective maintenance records to identify repetitive failures

of parts and components, and to identify design deficiencies.

Responsibilities have been assigned to ensure implementation of

records review identified above.

Work control procedures have been established to require special

,

authorization for activities involving welding, open flame, or

other ignition sources and take cognizance of nearby flammable

material, cable trays, or critical process equipment.

Work control procedures have been established to require a

firewatch, with capability for comunication with the control

room, if an activity identified abova is to be performed in the

proximity of flamable material, cable trays, or vital process

equipment.

Revisions to Technical

Specifications' (TS) have been

incorporated into procedures and included in the master program.

,

~

c.

Equipment Control

The inspector reviewed the procedures listed in 6.a. to verify that:

Procedures have been established to specify that the operating

staff grants permission to release equipment or systems for

maintenance.

Before granting. permission for removal of equipment for service,

the operating staff is required to verify that the equipment or

system can be released without violating TS requirements.

Additionally, they shall determine how long the~ equipment may be'

out of service.

Granting of such permission shall be

documented.

Equipment that is environmentally qualified should be identified

as such prior to maintenance and sufficient control should exist

to ensure it is returned to that status upon reassembly.

When testing of redundant components or systems is required by

TS or 10 CFR 50, such testing shall be documented.

The status of equipment and systems will be clearly identified.

.

~

]

.

\\

.

.

.

.

6

Procedures have been established and responsibility has been

assigned for determining when independent verification has been

implemented correctly.

Procedures and responsibility have been established for

returning equipment to service.

Revisions to TS have been incorporated into procedures and

included in the master program;

d.

Preventive Maintenance

The inspector reviewed the procedures listed in 6.a. to verify that a

,

written Preventive Maintenance (PM) program for safety-related

structures, systems, and components has been established to include:

responsibility for the program

,

master schedule for preventive maintenance

,

,

documentation and review of completion of preventive maintenance

activities

'

responsibilities and' methods for establishing PM frequencies

  • _ _ responsibility for periodic upgrading based on system or

component failures

methods for incorporating revisions to TS into procedures and

the master program

e.

Special Processes

The inspector reviewed the procedures listed in 6.a. to:

~

~

Verify that administrative controls for special processes have

been established as follows:-

I

a requirement that~only qualified procedures will be used

-

a requirement that only qualified personnel will be used

-

a requirement tha' a current file of special processes will

-

be maintained to include qualification records of

procedures and personnel

criteria to establish when the use of mock-ups or ot'her

-

special training will be required

Verify that responsibilities have been assigned to assure that

the requirements identified above will be accomplished.

.

.-

,

'

-

-

.

..

.

7

.

f.

Cleanliness Controls

The inspector reviewed the procedures listed in 6.a. to:

Veri fy that procedures have been developed for cleaning

safety-related components and systems.

Verify that procedures have been established for maintaining the

cleanliness of previously cl.eaned systems.

Verify that the cleanliness classifications of plant systems

have been established.

.

Verify that responsibilities for implementing the requirements

of this section have been established.

g.

Housekeeping Controls

The inspecto,r reviewed the procedures listed in 6.a. to verify that

administrative controls and responsibilities for general housekeeping

have been established to include:

, defining housekeeping zones

controlling housekeeping during work activities

_ _ _ -

7.

Maintenance Program Implementation (62700) (Unit 1)

The inspector reviewed the licensee's implementation of the maintenance

program to determine:

whether the program is being implemented in

accordance with regulatory requirements, the effectiveness of the program

on important plant equipment and the ability of the maintenance staff to

conduct an effective maintenance program.

-

a.

Maintenance Procedures

The inspector- also reviewed the maintenance procedures identified in

6.a. to assure that:

The

procedures

conform

to

licensee's

administrative

requirements, including format, approval and control.

The post-maintenance testing is appropriate for the repairs

made.

The inspection and hold points are identified in the procedures

or in a documented plan and are based on a set of established

guidelines.

Supplementary reference material such as drawings and technical

manuals is adequate and controlled.

l

.

,

.

.

.

- - _ _ _ _ - - -

'

,

.

.

.

,

.

8

t

'

The activity is described in sufficient detail.

Consideration is given to radiological, temperature, pressure,

and electrical hazards, as appropriate to the circumstances.

.

The provisions for fire protection cleanliness, and housekeeping

are adequate.

Appropriate instructions and quality control checks are included

to verify that environmentally qualified equipment is properly

protected against moisture intrusion when reassembled.

The provisions for obtaining approval from operations as well as

,

methods for notifying operations when affected systems are

removed from service and ready to be restored to normal service

are present.

b.

In-Process Maintenance Activities

The inspector witnessed the below listed maintenance activities in

progress to verify:

Maintenance personnel assigned understand the scope of the job.

'

,

Applicab,le parts of item 6 b. are saticfied for the work in

progress.

The technicians are qualified for their respective tasks.

Supervisory oversight of the work is adequate.

QC personnel assigned are knowledgeable of the task.

I

MWO

TASK

l

18710430

Add additional restraints to relieve the overstressed

condition resulting from improper valve weights being

-

used in analysis of RWST, sludge line between valves

HV 10957 and HV 10958

The above inspection included examination of field welding activities

associated with the fabrication and installation of support

V1-1204-239-H601 (Dwg. No. 82-P-87V1E0243-100 Rev. A).

The

applicable Codes are the ASME Boiler and Pressure Vessel Code Section

III,1977, Edition with addenda through W77 and the AWS Structural

Welding Code D.1.1-1975.

,

.

._.

_ _ _

.

.

.

.

.

'

9

,

(1)

Production Wel' ding

The below listed welds were examined in-process to verify work

conducted in accordance with traveler, welder identification and

,

location, welding procedures, WPS assigninents, welding technique

and sequence, materials identify weld geometry, fit-up;

temporary attachments, gas purging, preheat, electrical

characteristics, shielding gas, welding equipment condition,

interpass temperature, interpass cleaning, process control

systems, qualifications of inspection personnel, and weld

history records.

Weld

Size

Status

-

Pc A to Pc B

Flare Bevel Both Sides

Final Weld *

(6x6 TS to 6x6 TS)

Pc B to Embed

S/16" fillet

Fill Passes

  • Welding completed but not QC inspected.

Completed visual

examination of final weld.

During the above examination the inspectnr noted an apparently

abandoned uncompleted support located directly above safety

injection swing check valve 1-1204-263-3 IN (IV501204-241-02) .

.

The partially completed support included a length of 4x4 Tube

Steel which had been machine cut at an angle, and partially

welded to an embed such that the other end was directly over the

valve and perpendicular to the longitudinal axis of the piping

involved.

The support appeared to infringe on the hot pipe

seismic separation clearances required to be verified during

as-built and construction turnover inspections.

The partially

completed weld was unp(ainted and had been in place long enough

for moderate rusting

in an enclosed pumphouse).

During the

time of this inspection, cognizant licensee personnel were

unable to properly identify or explain whether this item was an

unremoved construction aid, an uncompleted support which was

"

necessary and not shown on design drawings, or miscellaneous

steel deemed unnecessary but properly left in place.

The'

inspector informed cognizant licensee personnel that NRC concern

on this matter would be identified as Unresolved item

424/88-05-01; 425/88-04-01, Abandoned Pipe Support for Safety

Injection Piping.

(2) Welding Procedures

Welding Procedures Specifications (WPS) applicable to the weld

joints listed in Paragraph 7.b.(1) were selected for review and

comparison with the ASME code as follows:

4

'

. .

.

.

'

10

Procedure

Quaufication

WPS

Process 1/ 2/

PQR Reports

GTSM-11-0-1, Rev. 0 '

GTAW/SMAW

507, 508, 547, 562

& 563

1/ GTAW - Gas Tungsten Arc Welding

~2/ SMAW - Shielded Metal Arc Welding

The above WPSs and their supporting Procedure Qualification'

Records (PQRs) were reviewed to ascertain whether essential,

supplementary and/or nonessential variables, including thermal

,

treatment, were consistent with Code requirements; whether the

WPSs were properly qualified and their supporting PQRs were

accurate and retrievable; whether all mechanical tests had been

performed and the results met the minimum requirements; whether

the PQRs had been reviewed and certified by appropriate

contractor / licensee personnel; and whether essential were noted.

WPSs are qualified in accordance with ASME Section IX, the

latest edition and addenda at the time of qualification.

(3) Welder Perfonnance Qualification

l

J

The inspector reviewed the licensee's program for qualification

of welders and welding operators for compliance with QA

procedures and ASME Code requirements.

)

The fo110 wing welder qualification status records and "Records

of Performance Qualification Test" were reviewed relative to the

weld joints listed in Paragraph 7.b.(1).

Welder Symbol

WPS

WPQT

AAAD

SM-11-8-1

SM-4-B-3-H

AAAD

SM-11-B-1

SM-4-B-1-L

l

NOTE:

Only SM portion of WPS GTSM-11-0-1 was used for

i

production welds involved.

(4) Welding Filler Material Control

The inspector reviewed the licensee's program for control of

welding material to determine whether materials were being

purchased, accepted, stored and handled in accordance with QA

procedures and applicable code requirements.

The follow 1.ng

specific area were examined.

Purchasing:

receiving, storing, and distribution and

-

handling

procedures;

material

identification;

and

inspection of welding materials issuing stations.

-

's

.

..

,,

,: s

-

.

.

s.

'

b

y

.

\\.

s.

,

.

,

/

f

g

'

11

,

s

.

,

r

y(

Welding material purchasing and receiving records for the

-

following material applicable to the weld joints listed in

Paragraph 7.b.(1) were reviewed for i:ontomance with

applicable prosec'ures and code requirements,

,

s

.

_

Type

Size

Heat, Lot Batch /Nr.

,

E7018

1/8" w

' > 23540

E7018

3/32"

34945

,

-

.

1

During 'the above examinaticq the inspector noted1t:ml room

personnel applying flag. tags 'to 18" length bare welding rods.

N The inspecto, noted trdt GPC Procedure 25340-C,' Revision 0,

,

-

,

Section 3.3.3 requires that 18" length bare rods be_ procured

eith a fi: g attached to one end of each ' length.

Further that

-

  • '

GPC Procaure 25$30-C, .F.avision 5, did not illow tool room

,

attendants to attach,[ lag tags and' further N.1uired t. hat bare

.-

welding. rods be controHed so that hea) Mot and/or control

s

.

number identification was maintained.

The.InspectBr requested

independent verification of the identification of the bare

-

~

welding rods irNelved and was informed thd the boxes involved

nad been inadvertently discarded.

Further ihat the personnel

-

involved were respoNing to verbal inst.*uctions and not aware

,

that transfer of heat, lot and/or coiitro) information was

-

.

regarded as a QC function by th5 progr6matic. controls involved.

,

During the course of this inspectfon, 'cogntnnt licensee

.

?c'

personnel were unable to explain how the bare rods involved had

'v

been adequately receipt inspected by the central ware.' wse and

properly transmitted and receipt inspected by' the oper tions

a

tool room.

The inspector informed cog 1ftent licensee personnel

that this matter was considered a lack gf conforman:e to Vogtle

. *

a

Technical Specifications Section 6.7.la and would be identified

'-

s

as Violation 424/88-05-02, Lack of Materidis Control.

8.

Safety-Related Piping (Unit 2)

-

'

,

The inspector examined weldtng "and nonweldinD 'ac tivities

for

^

safety related piping to determine whether applicable code and procedure

requirements were being met. ' The applicable code for safety-related

piping is the ASME Boiler and Pressure Vessel Code,Section III,1977

l

Edition with Addenda through W77.

i

a.

Review of Nonwelding Quality Records (49065)

The inspector seiscted varicus safety-related piping components

(e.g. , pipe , fittings .and welded-in components) for review of

pertinent records to determine confonnande with procurement, storage

N.

and installation specifications and QA/QA site procedures.

-

<y

.

s.

%

%

.

+

\\

..

,

'

$

w

".1

,

fm :

_ __

_ _ _ _ _ . _ _ _ _ _

, - - - - - - - - - - - - - - - - - - -

- - - _

'

.

'

12

Records of the following items were selected for review to ascertain

whether they (records) were in conformance with applicable

requirements relative to the following areas:

material test

reports / certifications; vendor supplied NDE reports; Nuclear Steam

,

Service Supply quality release; site receipt inspections; storage;

installation; vendor nonconformance reports.

Item

Heat / Control No.

System

1/2" dia SS

474744

Main Steam

Sched 80 Pipe

1/2" dia. SS coupling

FBV

Main Steam

-

1/2 " dia SS coupling

DSO

Main Steam

1/2 " dia SS coupling

EYH

Main Steam

b.

Welding Activities

.

(1)

Production Welding (55050)

The inspector observed in-process velding activities of

safety-related piping field welds inside containment as

described below to determine whether applicable code and

procedure requirements were being met.

The below listed welds were examined in process to verify work

conducted in accordance with traveler, welder identification and

location, welding procedures, WPS assignments, welding technique

and sequence, materials identify vald geometry , fit-up;

temporary attachments, gas pur

preheat, electrical

characteristics, shielding gas, ging,

welding equipment condition,

interpass temperatur9, interpass cleaning, pree.ess control

systems, qualifications of inspection personnel, and weld

history records.

ISO

Weld

Size

Status

2K4-1301-068-01,

068-W-130F

1/2"

Root & Cover Passes

R/1

2K4-1301-068-01,

068-W-1300

1/2"

Root & Cover Passes

R/1

2K4-1301-068-01,

068-W-134A

1/2"

Fit-up, Tack, &

R/1

Root Pass

2K4-1301-068-01,

068-W-134

1/2"

Fit-up. Tack, &

R/1

Root Pass

c

-___

_

.-

-

.'.

-

'

,

.

4

'

13

The following inspection qualification status reccrds and QA/QC

Inspector Qualification / Certification records were reviewed

relative to inspection of the weld joints listed below.

'

Inspector

Type of Certification

KWL-PPP

VT-II

EAS-PPP

VT-II

(2) Welding Procedures

Welding Procedure Specifications (WPS) applicable to the weld

joints listed in Paragraph 8.b.(1) were selected for review and

,

comparison with the ASME code as follows:

Procedure

WPS

Process 1/

Qualification PQR Reports

38-111/1-8-XI-1

GTAW

120, 121

(12/6/85)

J_/GTAW-GasTungstenArcWelding

The above WPSs and their supporting Procedure Qualification

.

Records (PQRs) were reviewed to ascertain whether essential,

supplementary and/or nonessential variables, including thermal

treatment, were consistent with Code requirements; whether the

WPSs were properly qualified and their supporting PQRs were

accurate and retrievable; whether all mechanical tests had been

performed and the results met the minimum requirements; whether

the PQRs had been reviewed and certified by. appropriate

contractor / licensee personnel; and whether essential were noted.

WPSs are qualified in accordance with ASME Section XI, the

latest edition and addenda at the time of qualification.

(3) Welder Performance Qualification

The inspector reviewed the PPP program for qualification of

welders and welding operators for compliance with QA procedures

and ASME Code requirements.

The following welder qualification status records and "Records

of Performance Qualification Test" were reviewed relative to the

weld joints-listed in Paragraph 8.b.(1).

Welder Sy*ool

WPS

OF1

24 - 111/1-8-XI-12

,

-

. . ~

'.

"*

.

.

..

.

,

14

(4) Welding Filler Material Control

The inspector reviewed the licensee's program for control of

welding materials to determine whether materiais were .being

purchased, accepted, stored and handled in accordance with QA

procedures and applicable code requirements.

The following

specific area were examined:

Purchasing; receiving, storing, and distribution and

-

handling

procedures;

material

identification;

and

inspection of welding materials issuing stations.

Welding material purchasing and receiving records for the

-

-

following material applicable to the weld joints listed in

Paragraph 8.b.(1) were reviewed for confonnance with

applicable procedures and code requirements.

M

Size

Heat Lot Batch /No.

ER308L

1/8" x 3'6

P0443

ER308L

3/32" x 36"

P5474

Within the area inspected, no violations or deviations were identified.

9.

Licensee Identified Items (92700)

Prior to the inspection, the licensee identified the following items under

10CFR50.55(e),

a.

(Closed) Item 425/CDR 85-77 TDI Diesel Generator Crankshaft Oil Plugs

On April 24, 1985, the licensee notified Region II of a 50.55(e) item

concerning potential failure of TDI diesel generator crankshaft oil

plugs.

Corrective action required replacement of 22 gauge oil plugs

with new plugs from 16 gauge material.

The final report was submitted on May 23, 1985.

The final report has

been reviewed and determined to be acceptable by Region II.

The

inspector held discussions with responsible licensee representatives

and reviewed supporting documents to verify that corrective actions

have been completed.

This item is considered closed,

b.

(Closed) Item 425/CDR 86-98, Manually Operated Butterfly Values

On April 15, 1986, the licensee notified Region II of a potentially

reportable 50.55(e) item associated with failure of the worm gear

sectors of some manually operated butterfly values.

The licensee, in

a letter dated June 26, 1986, stated that this condition is not

recortable per the criteria of Parts 10 CFR 50.55(e) or Part 10 CFR 21.

The inspector reviewed the licensee evaluation and concurs that

the failure of the actuators has no impact on plant safety.

This

item is considered closed.

J.,.

,.

.

,

-

.

15

c.

(Closed) Item 425/CDR 86-106, Dragon Needle Valves

On April 10, 1986, the licensee notified Region II of the 50.55(e)

item concerning excessive vibration during balance flow testing of

Dragon Needle Valves.

Corrective actions required a new valve disc

design for the 1 1" and 2" valves involved.

The final report was submitted on July 11, 1986.

The final report

has been reviewed and determined to be acceptable by Region II.

The

inspector held discussions with responsible licensee representatives

and reviewed supporting documents to verify that corrective actions

have been completed. This item is considered closed.

,

d.

(Closed) Item 424, 425/CDR 86-122, Containment Cooler Bearing Cavity

Lubricant

On August 6,1986, the licensee notified Region II of a 50.55(e) item

concerning the lubricant used in the bearing cavities of containment

cooler f,an motors.

Corrective actions required bearing replacement

and use of proper lubrication of the fan motors involved.

Further

investigation detennined that these actions were necessary for other

common Q class HVAC fan motors.

The final report was submitted on December 31 1986. The final report

has been reviewed and determined to be acceptable by Region II. The

inspector held discussions with responsible licensee representatives

and reviewed supporting documents to verify that corrective actions

"

have been completed.

This item is considered closed,

e.

(Closed) Item 425/CDR 86-131. Turbine Driven AFW Pump Speed Governor

On November 4,1986, the licensee notified Region II of a 50.55(e)

item concerning the turbine driven auxiliary feedwater pump speed

governor.

The governor was defective due to installation of

incorrect springs.

Corrective actions required a new governor from

the vendor involved.

!

The final report was submitted on December 16, 1986.

The final

report has been reviewed and determined to be acceptable by.

Region II.

The inspector held discussions with responsible licensee

representatives, reviewed supporting documents and completed field

inspections to verify that corrective actions have been completed.

This item is considered closed.