ML20149G709
| ML20149G709 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 02/05/1988 |
| From: | Blake J, Hallstrom G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20149G637 | List: |
| References | |
| 50-424-88-05, 50-424-88-5, 50-425-88-04, 50-425-88-4, NUDOCS 8802180372 | |
| Download: ML20149G709 (16) | |
See also: IR 05000424/1988005
Text
.
p2 Kro
UNITED STATES
"
o
.
-
g
'o
NUCLEAR REGULATORY COMMISSION
3%
7*
REGION ll
E
I o
101 MARIETTA STRE ET, N.W.
'
' f
ATLANTA, GEORGI A 30323
%; ~]]
.....
Report Nos.:
50-424/88-0! and 50-425/88-04
Licensee:
Georgia Power Company
P. O. Box 4545
-
-
Atlanta, GA 30302
Docket Nos.:
50-424 and 50-425
License Nos.:
NPF-61 and CPPR-109
Facility Name:
Vogtle 1 and 2
-
Inspection Condu ed:
January 11-15, 1988
Inspector:
.ach t.e.
c/
- [ M
GT AT be1
trom
Date Signed
Approved by:k -
[
A
6
J. J. Blate, Section Chief
' Dats Signed
Ofvtp. ion of Reactor Safety
Engi
ering Branch
SUMMARY
Scope:
This routine, unannounced inspection was in the areas of maintenance
activities (Unit 1),' welding and nonwelding activities associated with
safety-related piping (Unit 2), housekeeping and materials control (Unit 2),
and licensee identified 50.55(e) items (Units 1 and 2).
Results:
One violation was identified.
Lack of Materials Control - Paragraph
7.b.(4).
_
)
8802180372 880209
ADOCK 05000424
0
-
~
.
_
. . _
__
<
.
.
.
.
.
.
.
-
.
-
REPORT DETAILS
1.
Persons Contacted
Licensee Employees
,
,
- J. Austenkampe, Engineering Support Superintendent
- G. Bockhold, General Manager of Nuclear Operations
- L. N. Brooks, Civil Discipline Manager, Construction
- C. M. Burke, Senior Quality Assurance (QA) Field Representative,
Operations
-
.
- E. L. Coleman, Project Welding Supervisor, Construction
- C. L. Cross, Senior Regulatory Specialist, Nucicar Safety and Compliance
(NSAC), Operations
- D. M. Fiquett, Assistant Construction Project Manager - II
- J. J. Gilmartin, Mechanical Staff Engineer, Construction
,
'
- L. B. Glenn, Manager of Quality Control, Construction
- T. Greene, Plant Support Manager, Operations
- M. Griffis, Maintenance Manager, Operations
- E. D. Groover, QA Site Manager, Construction
- C. W. Hayes, Project QA Manager
- W. F. Kitchens Operations Manager
- R. E. Lide, Engineering Support Superintendent
- G. A. McCarley, Project Compliance Coordinator, Construction
- A. L. Mosbaugh, Assistant olant Support Manager, Operations
i
~*R. M. Odom, NSAC Plant Engineering Supervisor, Operations
l
- S. A. Philips, Maintenance Superintendent Operations
- P. D. Rice, Vice President and Vogtle Project Director
- J. E. Sanders, Assistant Construction Project Manager
- J. E. Swartzwelder, NSAC Manager, Operations
- J. M. Watson, QA Specialist, Construction
Other licensee employees contacted included construction craftsmen,
engineers, technicians, mechanics, and office pe.'sonnel.
Other Organizations
- J. M. Agold, Southern Company Services (SCS), Preservice Inspection
Coordinator
- R. W. Braddy, Bechtel Power Corporation (BPC), Mechanical Core
,
Discipline Project Engineer
- D. L. Carlson, BPC, Codes Engineer
- B. L. Edwards, Pullman Power Products (PPP), Rt
dent Construction Manager
- C. Garrett, Oglethorpe Power Corporation (OPC), Operations Engineer
- R. L. Keck, SCS, Inservice Testing Supervisor
- J. E. Miller, PPP, QA Manager
- D. Smith, OPC, Construction Engineer
- D. W. Strohman, BPC, Project QA Engineer
- P. R. Thomas, BPC, Unit 2 Readiness Review
_
_
.
.
.
.
-
-
2
,
NRC Resident Inspectors
- R. Schepens, Senior Resident Inspector (Construction)
- C. Burger, Resident Inspector (0perations)
- Attended exit interview
.
.
2.
Exit Interview
The inspection scope and findings were summarized on January 14, 1988
(Unit 2), and January 15,1988 (Unit 1), with those persons indicated in
Paragraph 1 above.
The inspector described the areas inspected and
d.iscussed in detail the inspection findings. No dissenting comments were
-
received from the licensee.
The licensee did not identify as proprietary
any of the materials provided to or reviewed by the inspector during this
inspection.
3.
Licensee Action on Previous Enforcement Matters
Licensee Actions on previous enforcement matters within the scope of this
s.
inspection were not complete.
4.
Unresolved Items
Unresolved items are matters about which more information is required to
determine whether they are acceptable or may involve violations or
deviations.
One unresolved item identified during this . inspection is
discussed in Paragraph 7.b.(1).
5.
Independent Inspection Effort
Housekeeping (548348), Material Identification and Control (429028), and
Material Control (429408)
The inspector conducted a general inspection of Unit 2 contaimnent and
'-
,
Reactor Auxiliary Building to observe activities such as housekeeping,
material identifica. tion and control; material control, and storage.
Within the areas examined, no violations or deviations were identified.
6.
Maintenance Program (62702) (Unit 1)
The inspector reviewed the licensee's maintenance program to verify that
it is
in compliance with Technical Specifications, Regulatory
Requirements, commitments in the application, and industry guides or
l
standards. The review is described below:
a.
Procedures
The inspector reviewed maintenance program related requirements in
the following procedures:
.
.
-
- . --
v
.
,
i
.
.
-
3
Procedure No.
Revision
Title
20407-C
8
Maintenance Conduct of Operations
20427-C
5
Maintenance Cleanliness and
Housekeeping Control
'
'
20012-C
4
Mechanical Maintenance Personnel
Training and Qualification
20016-C
1
Predictive Maintenance Program
20100-C
2
ASME Section XI Repair / Replacement
-
Program
20112-C
1
' Welding Organization
25361-C
0
General Notal Removal
20110-C
3
Weld Control Program
20405-C
7
Control of Maintenance Shop
Measuring and Test Equipment
25340-C
0
Procurement of Welding Filler
Material
_ _ . .
25330-C
5
Control of Welding Cr,nsumables
20111-C
1
Welding Manual / Procedure Revision
25300-C
0
General Welding Procedure
20113-C
0
Welding Procedure Qualification
' ~.
20114-C
1
Welder Qualification
,
'
20115-C
0
Welder Qualification Maintenance
20117-C
0
Welder Qualification - ASW D1.1
25302-C
0
Structural Welding
20408-C
1
Control of Grinding Wheels,
Discs, and Wire Brushes
25350-C
2
Control of Purging and Purge Dam
Control
25360-C
0
Post Weld Heat Treatment
.
-
_
. .
-
~
.
.
.
.
.
.
4
b.
Corrective Maintenance
The inspector reviewed the procedures described in 6.a. to verify
that:
Written procedures have been established for initiating requests
-
for routine and emergency maintenance.
>
,
Criteria and responsibilities have been established for review
and approval of maintenance requests including emergency
maintenance requests.
Criteria and responsibilities have been established that form
,
the basis for designating the activity as safety-related or not
safety-related,
j
Provisions and responsibilities have been established that form
the basis for designating the activity as safety-related or not
safety-related.
Methods and responsibilities have been designated for performing
functional testing of structures, systems, or components
following maintenance work and/or prior to their being returned
to service.
Administrative controls of maintenance _ activities require that
the following records will be prepared, assembled, and reviewed
for transfer to records storage:
approvals of maintenance requests
-
identification of the personnel who performed the
-
maintenance task
identification of the personnel who inspected the
-
maintenance work
'
cause of the malfunction or failure which necessitated the
-
maintenance work, including generic implications of the ~
failure
description of the corrective action taken
-
identification of the post-maintenance functional testing
-
performed
identification
of
personnel
that
perfonned
the
-
post-maintenance testing
1
identification of replacement parts or materials used
-
,
a
'
.
.
.
.
.
l
5
,
identification of test and measuring equipment used
-
Responsibility has been established to assemble and review the
records identified above.
Requirements have been established for reviewing completed
corrective maintenance records to identify repetitive failures
of parts and components, and to identify design deficiencies.
Responsibilities have been assigned to ensure implementation of
records review identified above.
Work control procedures have been established to require special
,
authorization for activities involving welding, open flame, or
other ignition sources and take cognizance of nearby flammable
material, cable trays, or critical process equipment.
Work control procedures have been established to require a
firewatch, with capability for comunication with the control
room, if an activity identified abova is to be performed in the
proximity of flamable material, cable trays, or vital process
equipment.
Revisions to Technical
Specifications' (TS) have been
incorporated into procedures and included in the master program.
,
~
c.
Equipment Control
The inspector reviewed the procedures listed in 6.a. to verify that:
Procedures have been established to specify that the operating
staff grants permission to release equipment or systems for
maintenance.
Before granting. permission for removal of equipment for service,
the operating staff is required to verify that the equipment or
system can be released without violating TS requirements.
Additionally, they shall determine how long the~ equipment may be'
out of service.
Granting of such permission shall be
documented.
Equipment that is environmentally qualified should be identified
as such prior to maintenance and sufficient control should exist
to ensure it is returned to that status upon reassembly.
When testing of redundant components or systems is required by
TS or 10 CFR 50, such testing shall be documented.
The status of equipment and systems will be clearly identified.
.
~
]
.
\\
.
.
.
.
6
Procedures have been established and responsibility has been
assigned for determining when independent verification has been
implemented correctly.
Procedures and responsibility have been established for
returning equipment to service.
Revisions to TS have been incorporated into procedures and
included in the master program;
d.
Preventive Maintenance
The inspector reviewed the procedures listed in 6.a. to verify that a
,
written Preventive Maintenance (PM) program for safety-related
structures, systems, and components has been established to include:
responsibility for the program
,
master schedule for preventive maintenance
,
,
documentation and review of completion of preventive maintenance
activities
'
responsibilities and' methods for establishing PM frequencies
- _ _ responsibility for periodic upgrading based on system or
component failures
methods for incorporating revisions to TS into procedures and
the master program
e.
Special Processes
The inspector reviewed the procedures listed in 6.a. to:
~
~
Verify that administrative controls for special processes have
been established as follows:-
I
a requirement that~only qualified procedures will be used
-
a requirement that only qualified personnel will be used
-
a requirement tha' a current file of special processes will
-
be maintained to include qualification records of
procedures and personnel
criteria to establish when the use of mock-ups or ot'her
-
special training will be required
Verify that responsibilities have been assigned to assure that
the requirements identified above will be accomplished.
.
.-
,
'
-
-
.
..
.
7
.
f.
Cleanliness Controls
The inspector reviewed the procedures listed in 6.a. to:
Veri fy that procedures have been developed for cleaning
safety-related components and systems.
Verify that procedures have been established for maintaining the
cleanliness of previously cl.eaned systems.
Verify that the cleanliness classifications of plant systems
have been established.
.
Verify that responsibilities for implementing the requirements
of this section have been established.
g.
Housekeeping Controls
The inspecto,r reviewed the procedures listed in 6.a. to verify that
administrative controls and responsibilities for general housekeeping
have been established to include:
, defining housekeeping zones
controlling housekeeping during work activities
_ _ _ -
7.
Maintenance Program Implementation (62700) (Unit 1)
The inspector reviewed the licensee's implementation of the maintenance
program to determine:
whether the program is being implemented in
accordance with regulatory requirements, the effectiveness of the program
on important plant equipment and the ability of the maintenance staff to
conduct an effective maintenance program.
-
a.
Maintenance Procedures
The inspector- also reviewed the maintenance procedures identified in
6.a. to assure that:
The
procedures
conform
to
licensee's
administrative
requirements, including format, approval and control.
The post-maintenance testing is appropriate for the repairs
made.
The inspection and hold points are identified in the procedures
or in a documented plan and are based on a set of established
guidelines.
Supplementary reference material such as drawings and technical
manuals is adequate and controlled.
l
.
,
.
.
.
- - _ _ _ _ - - -
'
,
.
.
.
,
.
8
t
'
The activity is described in sufficient detail.
Consideration is given to radiological, temperature, pressure,
and electrical hazards, as appropriate to the circumstances.
.
The provisions for fire protection cleanliness, and housekeeping
are adequate.
Appropriate instructions and quality control checks are included
to verify that environmentally qualified equipment is properly
protected against moisture intrusion when reassembled.
The provisions for obtaining approval from operations as well as
,
methods for notifying operations when affected systems are
removed from service and ready to be restored to normal service
are present.
b.
In-Process Maintenance Activities
The inspector witnessed the below listed maintenance activities in
progress to verify:
Maintenance personnel assigned understand the scope of the job.
'
,
Applicab,le parts of item 6 b. are saticfied for the work in
progress.
The technicians are qualified for their respective tasks.
Supervisory oversight of the work is adequate.
QC personnel assigned are knowledgeable of the task.
I
MWO
TASK
l
18710430
Add additional restraints to relieve the overstressed
condition resulting from improper valve weights being
-
used in analysis of RWST, sludge line between valves
The above inspection included examination of field welding activities
associated with the fabrication and installation of support
V1-1204-239-H601 (Dwg. No. 82-P-87V1E0243-100 Rev. A).
The
applicable Codes are the ASME Boiler and Pressure Vessel Code Section
III,1977, Edition with addenda through W77 and the AWS Structural
Welding Code D.1.1-1975.
,
.
._.
_ _ _
.
.
.
.
.
'
9
,
(1)
Production Wel' ding
The below listed welds were examined in-process to verify work
conducted in accordance with traveler, welder identification and
,
location, welding procedures, WPS assigninents, welding technique
and sequence, materials identify weld geometry, fit-up;
temporary attachments, gas purging, preheat, electrical
characteristics, shielding gas, welding equipment condition,
interpass temperature, interpass cleaning, process control
systems, qualifications of inspection personnel, and weld
history records.
Size
Status
-
Pc A to Pc B
Flare Bevel Both Sides
Final Weld *
(6x6 TS to 6x6 TS)
Pc B to Embed
S/16" fillet
Fill Passes
- Welding completed but not QC inspected.
Completed visual
examination of final weld.
During the above examination the inspectnr noted an apparently
abandoned uncompleted support located directly above safety
injection swing check valve 1-1204-263-3 IN (IV501204-241-02) .
.
The partially completed support included a length of 4x4 Tube
Steel which had been machine cut at an angle, and partially
welded to an embed such that the other end was directly over the
valve and perpendicular to the longitudinal axis of the piping
involved.
The support appeared to infringe on the hot pipe
seismic separation clearances required to be verified during
as-built and construction turnover inspections.
The partially
completed weld was unp(ainted and had been in place long enough
for moderate rusting
in an enclosed pumphouse).
During the
time of this inspection, cognizant licensee personnel were
unable to properly identify or explain whether this item was an
unremoved construction aid, an uncompleted support which was
"
necessary and not shown on design drawings, or miscellaneous
steel deemed unnecessary but properly left in place.
The'
inspector informed cognizant licensee personnel that NRC concern
on this matter would be identified as Unresolved item
424/88-05-01; 425/88-04-01, Abandoned Pipe Support for Safety
Injection Piping.
(2) Welding Procedures
Welding Procedures Specifications (WPS) applicable to the weld
joints listed in Paragraph 7.b.(1) were selected for review and
comparison with the ASME code as follows:
4
'
. .
.
.
'
10
Procedure
Quaufication
WPS
Process 1/ 2/
PQR Reports
GTSM-11-0-1, Rev. 0 '
GTAW/SMAW
507, 508, 547, 562
& 563
1/ GTAW - Gas Tungsten Arc Welding
~2/ SMAW - Shielded Metal Arc Welding
The above WPSs and their supporting Procedure Qualification'
Records (PQRs) were reviewed to ascertain whether essential,
supplementary and/or nonessential variables, including thermal
,
treatment, were consistent with Code requirements; whether the
WPSs were properly qualified and their supporting PQRs were
accurate and retrievable; whether all mechanical tests had been
performed and the results met the minimum requirements; whether
the PQRs had been reviewed and certified by appropriate
contractor / licensee personnel; and whether essential were noted.
WPSs are qualified in accordance with ASME Section IX, the
latest edition and addenda at the time of qualification.
(3) Welder Perfonnance Qualification
l
J
The inspector reviewed the licensee's program for qualification
of welders and welding operators for compliance with QA
procedures and ASME Code requirements.
)
The fo110 wing welder qualification status records and "Records
of Performance Qualification Test" were reviewed relative to the
weld joints listed in Paragraph 7.b.(1).
Welder Symbol
WPS
WPQT
AAAD
SM-11-8-1
SM-4-B-3-H
AAAD
SM-11-B-1
SM-4-B-1-L
l
NOTE:
Only SM portion of WPS GTSM-11-0-1 was used for
i
production welds involved.
(4) Welding Filler Material Control
The inspector reviewed the licensee's program for control of
welding material to determine whether materials were being
purchased, accepted, stored and handled in accordance with QA
procedures and applicable code requirements.
The follow 1.ng
specific area were examined.
Purchasing:
receiving, storing, and distribution and
-
handling
procedures;
material
identification;
and
inspection of welding materials issuing stations.
-
's
.
..
,,
,: s
-
.
.
s.
'
b
y
.
\\.
s.
,
.
,
/
f
g
'
11
,
s
.
,
r
y(
Welding material purchasing and receiving records for the
-
following material applicable to the weld joints listed in
Paragraph 7.b.(1) were reviewed for i:ontomance with
applicable prosec'ures and code requirements,
,
s
.
_
Type
Size
Heat, Lot Batch /Nr.
,
E7018
1/8" w
' > 23540
E7018
3/32"
34945
,
-
.
1
During 'the above examinaticq the inspector noted1t:ml room
personnel applying flag. tags 'to 18" length bare welding rods.
N The inspecto, noted trdt GPC Procedure 25340-C,' Revision 0,
,
-
,
Section 3.3.3 requires that 18" length bare rods be_ procured
eith a fi: g attached to one end of each ' length.
Further that
-
- '
GPC Procaure 25$30-C, .F.avision 5, did not illow tool room
,
attendants to attach,[ lag tags and' further N.1uired t. hat bare
.-
welding. rods be controHed so that hea) Mot and/or control
s
.
number identification was maintained.
The.InspectBr requested
independent verification of the identification of the bare
-
~
welding rods irNelved and was informed thd the boxes involved
nad been inadvertently discarded.
Further ihat the personnel
-
involved were respoNing to verbal inst.*uctions and not aware
,
that transfer of heat, lot and/or coiitro) information was
-
.
regarded as a QC function by th5 progr6matic. controls involved.
,
During the course of this inspectfon, 'cogntnnt licensee
.
?c'
personnel were unable to explain how the bare rods involved had
'v
been adequately receipt inspected by the central ware.' wse and
properly transmitted and receipt inspected by' the oper tions
a
tool room.
The inspector informed cog 1ftent licensee personnel
that this matter was considered a lack gf conforman:e to Vogtle
. *
a
Technical Specifications Section 6.7.la and would be identified
'-
s
as Violation 424/88-05-02, Lack of Materidis Control.
8.
Safety-Related Piping (Unit 2)
-
'
,
The inspector examined weldtng "and nonweldinD 'ac tivities
for
^
safety related piping to determine whether applicable code and procedure
requirements were being met. ' The applicable code for safety-related
piping is the ASME Boiler and Pressure Vessel Code,Section III,1977
l
Edition with Addenda through W77.
i
a.
Review of Nonwelding Quality Records (49065)
The inspector seiscted varicus safety-related piping components
(e.g. , pipe , fittings .and welded-in components) for review of
pertinent records to determine confonnande with procurement, storage
N.
and installation specifications and QA/QA site procedures.
-
<y
.
s.
%
%
.
+
\\
..
,
'
$
w
".1
,
fm :
_ __
_ _ _ _ _ . _ _ _ _ _
, - - - - - - - - - - - - - - - - - - -
- - - _
'
.
'
12
Records of the following items were selected for review to ascertain
whether they (records) were in conformance with applicable
requirements relative to the following areas:
material test
reports / certifications; vendor supplied NDE reports; Nuclear Steam
,
Service Supply quality release; site receipt inspections; storage;
installation; vendor nonconformance reports.
Item
Heat / Control No.
System
1/2" dia SS
474744
Sched 80 Pipe
FBV
-
DSO
EYH
b.
Welding Activities
.
(1)
Production Welding (55050)
The inspector observed in-process velding activities of
safety-related piping field welds inside containment as
described below to determine whether applicable code and
procedure requirements were being met.
The below listed welds were examined in process to verify work
conducted in accordance with traveler, welder identification and
location, welding procedures, WPS assignments, welding technique
and sequence, materials identify vald geometry , fit-up;
temporary attachments, gas pur
preheat, electrical
characteristics, shielding gas, ging,
welding equipment condition,
interpass temperatur9, interpass cleaning, pree.ess control
systems, qualifications of inspection personnel, and weld
history records.
Size
Status
068-W-130F
1/2"
Root & Cover Passes
R/1
068-W-1300
1/2"
Root & Cover Passes
R/1
068-W-134A
1/2"
Fit-up, Tack, &
R/1
Root Pass
068-W-134
1/2"
Fit-up. Tack, &
R/1
Root Pass
c
-___
_
.-
-
.'.
-
'
,
.
4
'
13
The following inspection qualification status reccrds and QA/QC
Inspector Qualification / Certification records were reviewed
relative to inspection of the weld joints listed below.
'
Inspector
Type of Certification
KWL-PPP
VT-II
EAS-PPP
VT-II
(2) Welding Procedures
Welding Procedure Specifications (WPS) applicable to the weld
joints listed in Paragraph 8.b.(1) were selected for review and
,
comparison with the ASME code as follows:
Procedure
WPS
Process 1/
Qualification PQR Reports
38-111/1-8-XI-1
120, 121
(12/6/85)
J_/GTAW-GasTungstenArcWelding
The above WPSs and their supporting Procedure Qualification
.
Records (PQRs) were reviewed to ascertain whether essential,
supplementary and/or nonessential variables, including thermal
treatment, were consistent with Code requirements; whether the
WPSs were properly qualified and their supporting PQRs were
accurate and retrievable; whether all mechanical tests had been
performed and the results met the minimum requirements; whether
the PQRs had been reviewed and certified by. appropriate
contractor / licensee personnel; and whether essential were noted.
WPSs are qualified in accordance with ASME Section XI, the
latest edition and addenda at the time of qualification.
(3) Welder Performance Qualification
The inspector reviewed the PPP program for qualification of
welders and welding operators for compliance with QA procedures
and ASME Code requirements.
The following welder qualification status records and "Records
of Performance Qualification Test" were reviewed relative to the
weld joints-listed in Paragraph 8.b.(1).
Welder Sy*ool
WPS
OF1
24 - 111/1-8-XI-12
,
-
. . ~
'.
"*
.
.
..
.
,
14
(4) Welding Filler Material Control
The inspector reviewed the licensee's program for control of
welding materials to determine whether materiais were .being
purchased, accepted, stored and handled in accordance with QA
procedures and applicable code requirements.
The following
specific area were examined:
Purchasing; receiving, storing, and distribution and
-
handling
procedures;
material
identification;
and
inspection of welding materials issuing stations.
Welding material purchasing and receiving records for the
-
-
following material applicable to the weld joints listed in
Paragraph 8.b.(1) were reviewed for confonnance with
applicable procedures and code requirements.
M
Size
Heat Lot Batch /No.
1/8" x 3'6
P0443
3/32" x 36"
P5474
Within the area inspected, no violations or deviations were identified.
9.
Licensee Identified Items (92700)
Prior to the inspection, the licensee identified the following items under
a.
(Closed) Item 425/CDR 85-77 TDI Diesel Generator Crankshaft Oil Plugs
On April 24, 1985, the licensee notified Region II of a 50.55(e) item
concerning potential failure of TDI diesel generator crankshaft oil
plugs.
Corrective action required replacement of 22 gauge oil plugs
with new plugs from 16 gauge material.
The final report was submitted on May 23, 1985.
The final report has
been reviewed and determined to be acceptable by Region II.
The
inspector held discussions with responsible licensee representatives
and reviewed supporting documents to verify that corrective actions
have been completed.
This item is considered closed,
b.
(Closed) Item 425/CDR 86-98, Manually Operated Butterfly Values
On April 15, 1986, the licensee notified Region II of a potentially
reportable 50.55(e) item associated with failure of the worm gear
sectors of some manually operated butterfly values.
The licensee, in
a letter dated June 26, 1986, stated that this condition is not
recortable per the criteria of Parts 10 CFR 50.55(e) or Part 10 CFR 21.
The inspector reviewed the licensee evaluation and concurs that
the failure of the actuators has no impact on plant safety.
This
item is considered closed.
J.,.
,.
.
,
-
.
15
c.
(Closed) Item 425/CDR 86-106, Dragon Needle Valves
On April 10, 1986, the licensee notified Region II of the 50.55(e)
item concerning excessive vibration during balance flow testing of
Dragon Needle Valves.
Corrective actions required a new valve disc
design for the 1 1" and 2" valves involved.
The final report was submitted on July 11, 1986.
The final report
has been reviewed and determined to be acceptable by Region II.
The
inspector held discussions with responsible licensee representatives
and reviewed supporting documents to verify that corrective actions
have been completed. This item is considered closed.
,
d.
(Closed) Item 424, 425/CDR 86-122, Containment Cooler Bearing Cavity
Lubricant
On August 6,1986, the licensee notified Region II of a 50.55(e) item
concerning the lubricant used in the bearing cavities of containment
cooler f,an motors.
Corrective actions required bearing replacement
and use of proper lubrication of the fan motors involved.
Further
investigation detennined that these actions were necessary for other
common Q class HVAC fan motors.
The final report was submitted on December 31 1986. The final report
has been reviewed and determined to be acceptable by Region II. The
inspector held discussions with responsible licensee representatives
and reviewed supporting documents to verify that corrective actions
"
have been completed.
This item is considered closed,
e.
(Closed) Item 425/CDR 86-131. Turbine Driven AFW Pump Speed Governor
On November 4,1986, the licensee notified Region II of a 50.55(e)
item concerning the turbine driven auxiliary feedwater pump speed
governor.
The governor was defective due to installation of
incorrect springs.
Corrective actions required a new governor from
the vendor involved.
!
The final report was submitted on December 16, 1986.
The final
report has been reviewed and determined to be acceptable by.
Region II.
The inspector held discussions with responsible licensee
representatives, reviewed supporting documents and completed field
inspections to verify that corrective actions have been completed.
This item is considered closed.
l
,
-
_ - . -