VIRGINIA POWER COMPANY NORTH ANNA POWER RTATION MONTHLY OPERATING REPORT MONTH January YEAR 1988 l
4 i
i APPROVED:
.Y f
STATTON MANAGER 97013/
t l)
~ 8802180297 avv---
PDR ADOCK 05000338
., g_,
OPERATING DATA REPORT DOCKET NO.
50-338 DATE 02-01-88 COMPLETED BY Brenda Garner TELEPHONE 703) 894-5151 X2527 OPERATING STATUS 1.
Unit Name:
North Anna 1 2.
Reporting Period:
January 1988 3.
Licensed Thermal Power (E't):
2893 4.
Nameplate Rating (Gross MWe):
947 5.
Design Electrical Rating (Net n'e):
907 6.
Maximum Dependable Capacity (Gross MWe):
963 7.
Maximun Dependable Capacity (Net MWe):
915 8.
If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions If Any:
N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 744 744 12.
Number of Hours Reactor Was Critical 256.2 256.2 _
84,252 58,456.1 13.
Reactor Reserve Shutdown Hours 27.6 27.n 6.302.3 14.
Hours Generator On-Line 172.7 172.7 55,924.9 15.
Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (E'H) 497,018 497,018 146,669,673
~
17.
Gross Electrical Energy Generated (E'H) 161,825 161,825 48,065,717 18.
Net Electrical Energy Generated (E'H) 153,512 153.512 45,448,106 19.
Unit Service Factor 23.2 2 3. 2_ _
66.4 20.
Unit Availability Factor 23.2 23.2 66.4 21.
Unit Capacity Factor (Using MDC Net) 22.6 22.6 55.8 22.
Unit Capacity Factor (Using DER Net) 22.7 22.7 59.5 23.
Unit Forced Outage Rate 76.8 76.8 15.8 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
Februarv 5, 1988 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-338 UNIT NA-1 DATE 02-01-88 COMPLETED BY Brenda Carner TELEPHONE 703-894-5151X2527 MONTH January 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 917 17 0
2 916 18 0
3 916 19 0
4 855 20 0
5 799 21 0
6 898 22 0
7 920 23 0
8 177 24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megavart.
Page 1
of 1
UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SEET DOCKET NO.
50-338 REPORT MONTH January UNIT NAME NA-1 YEAR 1988 DATE 02-01-88 COMPLETED BT Brenda Garner 08-01 1)
January 8,
1988, at 0438 reactor manually tripped from 100%
power - 968 MW, due to loss of circulating water pumps.
Repairs were completed and Unit returned on line January 13, 1988 at 0307.
08-02 2)
January 13, 1988 at 0313, reactor trip occurred at 100 MW - 15%
- power, due to Hi Hi level on "B" steam generator.
Corrective action was taken and January 13, 1988 at 1125 reactor was taken critical.
Approximately eight hours later, the reactor was manually shutdown due to resin intrusion in the steam generator.
Ended the month with Unit in Mode 5, repairing the 1-RC-P-1A reactor coolant pump seal and flushing the steam generator after powdex resin intrusion.
Approximately February 5, 1988, the Unit will return on line.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No.
50-338 UNIT NAME North Anna I DATE 02-01-88 REPORT M0KTH January COMPLETED BY Brenda ':arner TELEPHONE (703) 894-5151 12527 Type' Duration No Date Reason Method of Licensee
. System Component Cause & Corrective o
(Hours)
Shutting Event Code Code
^**I "
- 3 4
5 Down Reactor Report I Prevent Recurrence 88-01 880108 F
118.5 A
1 LER-N1-88-002 KE P
Reactor manually tripped from 100% power, due to loss of circulating water pumps. Unit returned on line January 13, 1988 at 0307.
88-02 880113 F
452.8 II 3
LER-NI-88-005 JB SG Reactor trip occurred at 15% power, due to 111 111 1cyc1 on "B" steam generator.
Reactor taken critical at 1125.
A 1
LER-NI-88-004 KD N/A Approximately eight hours Inter at 1916 the reactor was manually shutdown due to resin intrusion in the steam generator.
Ended the month with Unit in Mode 5.
Approximately February 5, 1988 Unit will return on line.
I 2
3 4
F: Forced Reason:
Method:
Exhibit F - Instructions Se Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)
E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other
^
C-Operational Error (Explain) 5 II-Other (Explain)
Exhibit II - Same Source
l 9
NORTH ANNA POWER STATION UNIT NO.
1 MONTH January SUMARY OF OPERATING EIPERIENCE Listed below in chronological sequence is'a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
DATE TIME DATA January 1, 1988 0000 Began the month with the Unit at 968 W -
100% power.
January 4, 1988 1103 Commenced rampdown of 100 W, to perform work on "A" waterbox.
1158 Unit holding at 868 W - 89% power, to perform. work on "A" waterbox.
January 6, 1988 0340 Commenced ramp up to 98% power, repairs completed on "A" waterbox.
l 0445 Unit holding at 950 W - 98% power, for 1-PT-24 calorimetric.
0455 Commenced ramp up to 100% power, 1 PT-24 calorimetric completed.
0518 Unit stabilized at 965 W - 100% power.
January 8, 1988 0438 Reactor manually tripped from 100% power -
968 W due to loss of circulating water pumps.
January 9, 1988 2332 Reactor critical.
L f
NORTH ANNA POWER STATION UNIT NO.
1 MONTE January StmetARY OF OPERATING EIPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
DATE TIME DATA January 13, 1988 0307 Unit on line.
January 13, 1988 0313 Reactor trip occurred at 100 MW - 15%
power, due to Hi Hi level on "B" steam generator.
1125 Reactor critical.
1916 Reactor manually shutdown, due to resin l
intrusion in the steam generator.
January 31, 1988 2400 Ended the month with Unit in Mode 5,-
repairing 1-RC-P-1A reactor coolant pump seal and flushing the steam generator after powdex resin intrusion.
Approximately February 5, 1988, the Unit will return on line.
t 9
6 6
i i
e
4 OPERATING DATA REPORT DOCKET NO.
50-339 DATE 02-01-88 COMPLETED BY Brenda Garner TELEPHONE 703) 894-5151 X2527 OPERATING STATUS 1.
Unit Name:
North Anna 2 2.
Reporting Period:
January 1988 3.
Licensed Thermal Power (MWt):
2893 4.
Nameplate Rating (Gross MWe):
947 5.
Design Electribal Rating (Net MWe):
907 6.
Maximum Depenoaole Capacity (Gross MWe):
963 7.
Maximum Dependable Capacity (Net MWe):
915 8.
If Changes Occur in Capacity Racings (Items No. 3 thru 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative 1 1..
Hours In Reporting Period 744 744 62,520 12.
Number of Hours Reactor Was Critical 744 744 49,212.3 13.
Reac' tor Reserve Shutdown Hours 0
0 5,653 14.
Hours Generator On-Line 744 744 48,400 15.
Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (MWH) 2.151,711 2,151.711 126,470,492 17.
Gross Electrical Energy Generated (HWH) 716.595 716,595 41,921,716 18.
Net Electrical Energy Generated (MWH) 681,949 681,949 39,740,296 19.
Unit Service Factor 100.0 100.0 77.4 20.
Unit Availability Factor 100 0 100 0 77.4 21.
Unit Capacity Factor (Using MDC Net) 100.2 100.2 64.3 22.
Unit Capacity Factor (Using DER Net) 101.1 101.1 70.1 23.
Unit Forced Outage Rate 0
0 9.1 24.
Shutdowns Scheduled Over' Next 6 Months (Type Date, and Duration of Each):
25.
If Shut Down At End Of Report Period. Estimated Date of Startup:
26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-339 UNIT NA-2 DATE 02-01-88 COMPLETED BY Brenda Garner TELEPHONE 703-894-5151X2527 MONTH January 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 919 17 918_
2 917 18 918 3
910 19 917 4
919 20 917 5
919 21 917 6
920 22 917 7
920 23 917 8
919 24 916 9
919 25 915 10 918 26 914 11 919 27 915 l
12 919 28 913 1
13 917 29 912 14 917 30 911 15 918 31 911 16 918 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
z _- __
Page 1
of 1
UNIT SHUTDOWN AND POWER REDUCTIONS EIPLANATION SHEET DOCKET NO.
50-339 REPORT MONH January UNIT NAME NA-2 TEAR 1988 DATE 02-01-88 COMPLETED BY Brenda Carner No entry this month.
1 I
i O
S k
M 1
s i
f F
~~~
m
-. =.
UNIT SNUTDOWMS AND POWER REDUCTIONS DOCKET NO.
50-339 UNIT NAME North Anna 1-DATE 02-01-88 REPORT MONTH January COMPLETED BY Brenda Carner TELEPHONE (703) 894-5151 X2527 No.
Date Type Duration Reason Metlood of Licensee System Component Cause & Corrective (Nours)
Sheetting Event Code Code $
Action to 4
Down Reactor)
Report i Prevent Recurrence No entry this month.
1 2
3 4
F: Forced Reason:
Method:
Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File
, ~
D-Regulatory Restriction 4-Continuations (NUREC-0161)
E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other C-Operational Error (Explain) 5 H-Other (Explain)
Exhibit H - Same Source m- -
u a
u b
m a-e--
w
NORTE ANNA POWER STATION UNIT NO.
2 NONTE January SUlWARY OF OPERATING EIPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
DATE TIME DATA January 1, 1988 0000 Began the month with the Unit at 961 MW -
100% power.
January 2, 1988 2325 Commenced rampdown of 100 MW, to perform Turbine Valve Freedom Test.
January 3, 1988 0011 Unit holding at 865 MW - 89% power, to perform Turbine Valve Freedom Test.
0150 Commenced ramp up to 100% power, Turbine Valve Freedom Test completed.
0220 Unit stabilized at 960 MW - 100% power.
January 31, 1988 2400 Ended the month with Unit at 958 MW 100%
power.
l r
)
J l
VIRGINIA ELECTRIC AND Powan COMPANY Hrenwoxo,V woixrA 20c61 I
W.1. SrawAat x$'.'l"".'.*lfo..
February 11, 1988 U.S. Nuclear Regulatory Comission Serial No.
88 062 Attention: Document Control Desk N0/DJV:jmj Washington, D.C.
20555 Docket Nos.
50-338 50 339 License Nos. NPF-4 NPF-7 Gentlemen:
I VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of January 1988.
Very truly yours,
(
W. L. Stewart Enclosures cc:
U.S. Nuclear Regulatory Comission 3
101 Marietta Street, NW Suite 2900 l
Atlanta, GA 30323 Mr. J. L. Caldwell NRC Senior Resident Inspector North Anna Power Station l
(