OPERATING DATA REPORT DOCKET NO. 50-336 DATE 02/10/88-COMPLETED BY G. NERON TELEPHONE (203) 447-1791 Extension 4417 OPERATING STATUS
'1.
Unit Name: MILLSTONE UNIT 2 l Notes: Items 21 and 22 l'
2.
Reporting Period: JANUARY, 1988 l cumulative are weighted 1
-3.
Licensed Ti.ermal Power (MWt): 2700 l averages.
Unit operated atl 4.-
Nameplate Rating ~(Gross MWe): 909 l2560 MW thermal prior to j
5.
Design Electrical Rating.(Net MWe): 870 lits uprating to the current l 6.
Maximum Dependable Capacity (Gross MWe):888.75l2700 MWTH power level.
l 7.
Maximum Dependable Capacity (Net MWe): 857.25 l l
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N/_A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 744 744 106,080 12.
Number Of Hours Reactor Was Critical 0.0 0.0 77,380.3 2,205.5 13.
Reactor Reserve Shutdown Hours 0
0 -
73,253.0-14.
Hours Generator On-Line 0.0 0.0
~
15.
Unit Reserve Shutdown Hours 0
0 468.2 16.
Gross Thermal Energy Generated (MWH) 0 0
204,562,262
- 17. Gross Elec. Energy Gererated (MWH) 0 0
60,871,579 18.
Net Electrical Energy Generated (MWH)
(-3,336.0)
(-3,336.0) 58,373,202 19.
Unit Service Factor 0.0 0.0 69.1 2A.
Unit Availability Factor 0.0 0.0 69.5 21.
Unit Capacity Factor (Using MDC Net) 0.0 0.0 64.9 22.
Unit Capacity Factor (Using DER Net) 0.0 0.0 63.9 23.
Unit Forced Outage Rate 0.0 0.0 15.2 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l Currently in EOC 8 Refueling and Maintenance Outage 25.
If Shut Down At End Of Report Period, Estimated Date of Startup: FEBRUARY 15, 1988
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A P 02170345 88023e gDR ADOCK 05000336 PDR f
l
F AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-336 UNIT MILLSTONE 2 DATE,02 /10/88 COMPLETED BY G. NERON TELEPHONE (203) 447-1791 Extension 4417 MONTH JANUARY, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
l I
~ s 3u DOCKET'NO. 50-336 UNIT SHUTDOWNS AND PCWER REDUCTIONS UNIT NAME MILLSTONE 2-
'M DATE 02/10/88
-.j
' COMPLETED BY G. NERON
. i REPORT MONTH JANUARY, 1988 TELEPHONE (203) 447-1791 1
' Extension 4417 Na.
Date Type Duration Reason 2 Method of Licensee System Component Cau'se & Corrective.
8 (Hours)
Shutting Event Code 4 Code 5 Action to Report #
Prevent Recurrence.
Down Reactor 3 87-09 123187 5
744 C
.4 N/A N/A N/A Continuation of refueling ~
and maintenance outage from previous month.
i l
-l i
1 2
3 4
F:
Forced Reason:
Method:
Exhibit G Instructions 5:
Scheduled A-Eqaipment Failure (Explain) 1-Manual
.for Preparation of Data' B-Maintenance or Test 2-Manual Scram
. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event' Report (LER) File.
D-Regulatory Restriction
'4-Continued from (NUREG-0161)
~g E-Operator Training & License Examination previous month F-Admi nistrative S-Power Reductior.
5 G-Operational Error (Explain)
-(Duration = 0)
Exhibit 1 - Same Source H-Other (Explain) 6-Other (Explain) 1 n
e i
e REFUELING INFORMATION REQUEST l '.
Name of facility:
Millstone 2 2.
Scheduled date for next refueling shutdown:
Currently in EOC 8 refueling outage 3.
Schedule date for restart following refueling: FEBRUARY 15, 1988 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
A change to Surveillance Requirement 4.6.1.2, paragraph (c), of Technical Specification 3.6.1.2 (CONTAINMENT LEAKAGE) requires erros analyses of the test systems used in calculating the Containment Integrated Leak Rate to determine an acceptable integrated leakage measurement system.
5.
Scheduled date(s) for submitting licensing action and supporting information:
(a)'A Special Report containing the results of the E0C 8 steam generator inspections and repairs, as required by Technical Specification 4.4.5.1.5.c., will be submitted to the NRC in February, 1988.
6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
NONE 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core: (a) 217 (b) 580 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Currently 1277 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1994, Spent Fuel Pool Full Core off load capacity is reached 1998, Core Full, Spent Fuel Pool Full 2009, Spent Fuel Pool, Full Core off load capacity is reached-contingent upon license approval to store consolidated fuel.