4J OPERATING DATA REPORT
-DOCKET NO. 50-336-DATE 1/7/88 COMPLETED BY J. GIBSON TELEPHONE (203) 447-1791 Extension 4431
. OPERATING STATUS.
1.
Unit Name: MILLSTONE UNIT 2 l Notes:= Items 21 and 22 l
2.'
Reporting Period: DECEMBER, 1987 l cumulative are weighted l
3.
Licensed Thermal. Power (MWt): 2700 laverages.
Unit operated atl 4.
Nameplate Rating (Gross MWe): 909 12560 MW thermal prior to l
S.
Design Electrical Rating (Net MWe): 870 lits uprating to the current l 6.
Maximum Dependable Capacity (Gross MWe):888.7512700 MWTH power level.
l 7.
Maximum Dependable Capacity (Net MWe): 857.25 l l
8.
If Changes Occur'in Capacity Ratings (Items Number 3 Through 7)-
i Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A 10.
Reasons For Restrictions, If Any:
N/A r
t This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 744 8,760 105,336 12.
Number Of-Hours Reactor Was Critical 722.8 8,242 77,380.3 1
i 13.
Reactor Reserse Shutdown Hours 0
0 2,205.5 14.
Hours Generator On-Line 720.8 8,180.1 73,253 15.
Unit Reserve Shutdown Hours 0
0 468.2 16.
Gross Thermal Energy Generated (MWH) 1,879,773 21,767,398 204,562,262 17.
Gross Elec. Energy Generated (MWH) 612,900 7,154,100 60,871,579 18.
Net Electrical Energy Generated (MWH) 590,443 6,892,531 58,376,538 19.
Unit Service Factor 96.9 93.4 69.5 l
20.
Unit Availability Factor 96.9 93.4 70.0 21.
Unit Capacity Factor (Using MDC Net) 92.t, 91.8 65.4 22.
Unit Capacity Factor (Using DER Net) 91.2 90.4 64.4 23.
Unit Forced Outage Rate 0.0 6.4 15.2 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Currently in EOC 9 Refueling and Maintenance Outage:
12/31/87:
Duration approximately 8 weeks
- 25.
If Shut Dowr, At End Of Report Period, Estimated Date of Startup: MARCH, 1988 26.
Units In Test Status (Prior to Commercial Operation):
Fork
.t Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COM4ERCIAL OPERATION N/A N/A
- Correction of Typographical Error 8802170371 BB 3