Ack Receipt of Plan for Restart of Peach Bottom Atomic Power Station,Section I,Corporate Action & Approves 871125 Implementation of Corporate Plan
ML20149E238
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/24/1987
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Joseph Austin
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 8801130267
Download: ML20149E238 (2)


Text

r~ ',.3 24 DEC 1987 Docket Nos. 50-277 50-278 Philadelphia Electric Company ATTN: Mr. J. H. Austin President 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:

Subject:

Plan for Restart of Peach Bottom Atomic Power Station,Section I, Corporate Action On November 25, 1987 we received your "Plan for Restart of Peach Bottom Atomic Power Station,Section I, Corporate Action." Our preliminary review indicates that your posposed actions are responsive to the Order issued March 31, 1987 and the concerns expressed in my October 8 1987 letter.

Specifically, the corporate action plan now acknowledges the failure of corporate managemer,t to recognize the severity of the problems at Peach Bottom.

The corporate plan further described the connection between the problems that led to the Commission's shutdown order of March 31, 1987, the root causes, and the corrective actions that you consider necessary to address the problems.

On December 18, 1987 the staff issued a Temporary Waiver of Compliance based upon proposed changes to both corporate and plant organizational structures which you s bmitted on November 19, 1987.

Based upon our preliminary review of your corporate plan and our Temporary Waiver of Compliance you should proceed with implementation of your November 25, 1987 corporate plan.

Our conclusions regarding the corporate plan tre preliminary until we have assessed the effectiveness of the revised corpcrate structure and have completed action on your proposed amenc' ment re':uest1 We understand that Sections II through IV of the plan related to tctions at the plant will be submitted in January 1988. Our review of Sections II through IV of your plan will be the subject of future correspondence, i

Sincerely, Original Signed By' WILLI AM T. BUSSELL j

William T. Russell Regional Administrator 0FFICIAL RECORD COPY PLAN FOR RESTART OF PB - 0001.0.0 12/23/87

,8801130267 8712?4 PDR ADOCK 05000277 Ol I

P DCD

F-Philadelphia Electric Company 2

i 24 DEC 1987 cc w/ encl:

l J. W. Gallagher, Vice President, Nuclear Operations Dickinson M. Smith, Manager, Peach Bottom Atomic Power Station John S. Kemper, Senior Vice President, Engineering and Production Thomas S. Shaw, Jr., Vice President, Production Troy B. Conner, Jr., Esquire W. H. Hirst, Director, Joint Generation Projects C;partment, 4

Atlantic Electric G. Leitch, NLclear Generation Manager i

Eugene J. Bradley, ' Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations W. M. Alden, Engineer in Charge, Licensing Section Doris Poulsen, Secretary of Harford County Council Public Docurnent Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania i

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP i

Robert J. Bores, DRSS i

i 1

1 i

i l

1 i

l M[

Wh' hP k:DRf RINDRP RT:DRP R

I R

R; RI:

Williams /rh1 Linville W

Mnger Col ins K

Gan Russell 12/gp/87 12/}f/87 12/j/87 1)/

7 12/17/87 12/4//87 M *g87 l

i OFFICIAL RECORD COPY PLAN FOR RESTART OF PB - 0002.0.0 i

12/18/87 i

i

-