ML20149D773
| ML20149D773 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 01/07/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20149D777 | List: |
| References | |
| NUDOCS 8801130119 | |
| Download: ML20149D773 (2) | |
See also: IR 05000267/1987029
Text
-
_
-
_~
-
.
_.
-
--
.
.
..
,
JAN
7 1988
,
,
.
.In Reply Refer To:
.
Document Contains
Docket:
50-267/87-29
SAFEGUARDS INFORMATION
l
Public Service Company of Colorado
ATTN:
Robert O. Williams, Jr.
Vice President, Nuclear Operations
2420 W. 26th Avenue, Suite 15c
Denver, Colorado 80211
i
i
Gentlemen:
This refers'to the, inspection conducted by Mr. A. B. Earnest of this office
.
-during the period November 2-6, 1987, of activities authorized by NRC Operating
,
License DPR-34 for the Fort St. Vrain Nuclear Generating Station, and to the
,
j
discussion of our findings with Mr.. F. Novachek and other members of your staff
at the conclusion of the inspection.
Areas examined during the inspection included management effectiveness,
security organization, security audits.-records and reports, testing and
'
maintenance, physical barriers - vital areas, security systems power supply,
access control
packages, access control - vehicles, access control -
1
personnel, detection aids - vital areas, alarm stations, communications,
training and qualifications, and compensatory measures.
Within these areas,
,
the inspection consisted of selective examination of procedures and
'
representative records, interviews with personnel, and observations by the NRC
1
inspector.
The inspection findings are documented in the enclosed inspection
!
i
report.
!
Ouring this inspection, it was found that certain of your activities were in
j
violation of NRC requirements.
Consequently, you are required to respond to
-
these violations, in writing, in accordance with the provisions of
!
Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of
1
Federal Regulations.
Your response should be based on the specifics contained
"
e
in the Notice of Violation enclosed with this letter.
'
s
1
j
We have also examined actions you have taken with regard to previously
'
l
identified inspection findings.
The status of-these items is identified in
i
paragraph 2 of the enclosed report.
,
,
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
i
{
by the Paperwork Reduction Act of 1980, PL 96-511.
1
i
i
The material enclosed herewith contains Safeguards Information as defined by
!
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
l
by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
i
$
material, with the exception of the report cover page which is an inspection
'
summary, will not be placed in the Public Document Room.
.
j
ENCLOSURE CONTAINS
RIV: 1?
C:RPSB
C:DRP/8
0:DRP
SAFEGUARDS INFORMATION,
!
l
ABEa*
st/tw
LAYand
TFWesterman
LJCall n
UPON SEPARATION THIS
I
i)A0/87
( W /87
I /q/83
1 /5 /87
PAGE IS DECONTROLLED.
'
<
h
'
!
f
8801130119 880107
%cament Contains
/E
4
j
gDR
ADOCK05002g7
CIMRDS INFORMATIGil
4 8%L
. _ _ _ - _ _ _ _ _,
.
.
.
,,
.I
.I
Public Service Company of Colorado
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
l
- Original Signed By
,
A. B. Beach gb>
L. J. Callan, Director
Division of Reactor Projects
,
t
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-267/87-29
,
cc w/ summary page only:
Fort St. Vrain Nuclear Station
Manager, Nuclear Production Division
16805 WCR 19\\
Platteville, Colorado
80651
Fort St. Vrain Nuclear Station
P. Tomlinson, Manager, Quality
,
Assurance Division
!
(same address)
t
Colorado Radiation Control Program Director
'
Colorado Public Utilities Commission
bec:
Copy of entire report:
l
RIV Security File
P. A. Starcher, RSGB/NRR
Resident Inspector
!
R. D. Martin, RA
R. L. Bangart, DRSS
'
Security Inspector
i
Chief, RPSB
RPSB Security File
l
D. A. Powers, E0
l
!
bec:
RIV - Letter and Inspection Summary only w/766*
t
MIS
Lisa Shea, RM/ALF
RSTS Operator
Section Chief, DRP/B
RIV File
,
RPSB
R. E. Hall, DRSS
Project Engineer, DRP/B
bec:
RIV - Letter and Inspection Summary only w/out 766:
A MB IE-04
DRS 0. D. T. Lynch, PBSS
ENCLOSURE CONTAINS
K. Heitner, NRR Project Inspector
SAFEGUARDS INFORMATION.
UPON SEPARATION THIS
PAGE IS DECONTROLLED.