ML20148U266
| ML20148U266 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/20/1978 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES CO. |
| Shared Package | |
| ML20148U268 | List: |
| References | |
| NUDOCS 7812060338 | |
| Download: ML20148U266 (2) | |
See also: IR 05000445/1978018
Text
._
.
.
. _
,
..
. . .
gP "4c,[of
-
UNITED STATES
..
e(
- NUCLE AR REGULATORY COMMISSION
o
REGION IV
N
e$'
611 RYAN PLAZA DRIVE,SulTE 1000
o
'
October 20, 1978
In Reply Refer To:
RIV
Docket No. 50-445/i<pt. 78-18
50-446/Rpt. 78-18
Texas Utilities Generating Company
ATTN: Mr. R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
'
Dallas, Texas
75201
Gentlemen:
This refers to the inspection conducted by Messrs. L. D. Gilbert and
A. B. Rosenberg of our staff during the period of October 10-13, 1978,
of activities authorized by NRC Construction Permit Nos. CPPR-126 and
127 for the Comanche Peak facility, Units No.1 and 2, and to the dis-
cussion of our findings with Mr. R. G. Tolson and other members of
,
your staff at the conclusion of the inspection.
.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection con-
sisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with Appendix B to 10 CFR 50 of
the NRC Regulations, " Quality Assurance Criteria for Nuclear Power
Plants." The item of noncompliance and reference to the pertinent re-
quirements are identified in the enclosed Notice of Violation.
One new unresolved item is identified in paragraph 2 of the enclosed
report.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office, with-
,
in 30 days of your receipt of this notice, a written statement or expla-
nation in reply including: (1)correctivestepswhichhavebeentakenby
you, and the results achieved; (2) corrective steps which will be taken
to avoid further noncompliance; and (3) the date when full compliance
will be achieved.
7812060 % %
Q
l
_ . _ _ _
.
.
_
_
_.
1
.
...
Texas Utilities Generating
Company
-2-
October 20, 1978
!
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
l
enclosed inspection report will be placed in the NRC's Public Document
Room.
If the report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
this office, within 20 days of the date of this letter, requesting that
such information be withheld from public disclosure. The application
must include a full statement of the reasons why it is claimed that the
information is proprietary.
The application should be prepared so that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
.
Sincerely
-
.
effe
-
W. C. ISei d e, Chief
Reactor
nstruction and
Engineering Support Branch
.
Enclosures:
1.
Appendix A, Notice of Violation
2.
IE Inspection Report No. 50-445/78-18
50-446/78-18
cc: w/ enclosure
Texas Utilities Generating Company
ATTN:
Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas
75201
i
.
-
.. -
- -
-
-
- -
-