ML20148U275

From kanterella
Jump to navigation Jump to search
IE Inspec Repts 50-445/78-18 & 50-446/78-18 on 781010-13 During Which 1 Item of Noncompliance Was Noted:Failure to Follow Welding Procedure
ML20148U275
Person / Time
Site: Comanche Peak  
Issue date: 10/20/1978
From: Gilbert L, Rosenberg A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20148U268 List:
References
50-445-78-18, 50-446-78-18, NUDOCS 7812060342
Download: ML20148U275 (7)


See also: IR 05000445/1978018

Text

'

,

-

.

..

g'

U. S. NUCLEAR REGULATORY COMMISSION

0FFICE OF INSPECTION AND ENFORCEMENT

REGION IV

Report No.

50-445/78-18; 50-446/78-18

Docket No.

50-445; 50-446

Category A2

Licensee: - Texas Utilities Generating Company

.,

2001 Bryan Tower

Dallas, Texas

75201

Facility Name:

Comanche Peak, Units 1 & 2

,

Inspection at:

Comanche Peak Site, Glen Rose, Texas

Inspection conducted:

October 10-13, 1978

.

Inspectors:

/#/20/78

L.~ D.'Gilb(rt,' Reactor Inspector, Engineering Support

Date '

Section (Paragraphs 1, 3, 4, 8 & 9)

/0

f

. B. Rosenberg, Reactor Inspector, Engineering Support

D#te '

Section (Paragraphs 2, 5, 6 & 7)

-

/C[2o/7g

Reviewed

r

. G. Taylor, Resident Inspector, Projects Section

Date

/0[#c/78

Approved:

m e- - --

'

W. A. Crossman, Chief, Projects Section

Date

f

/0

0

h. Ef Hail, Chief, Enyfneering Support Section

Date /

781306b3 Q

-

..

Inspection Summary:

Inspection on October 10-13,1978 (Report No. ' 50-445/78-18; 50-446/78-18)

Areas Inspected: Routine, unannounced inspection of construction activities

including review of quality assurance implementing procedures related to

reactor coolant piping (Unit 1); observation of work activities related to

welding of the reactor coolant piping (Unit 1); observation of work activi-

ties related to welding of safety related piping (Unit 1); review of records

related to containment structural welding (Unit 1); observation of work and

review of records related to containment exterior wall concrete placement

(Unit 1); and review of records related to the personnel air lock installa-

tion (Unit 2). The inspection involved fifty-one inspector-hours on-site by

two NRC inspectors.

Results:

Of the seven areas inspected, no items of noncompliance were

identified in six areas.

One item of noncompliance was identified in the

other area (infraction - failure to follow welding procedure - paragraph

3.b).

-2-

.

.

_.

._

_.

'

.

-

s

..

DETAILS

1.

Persons Contacted

Principal Licensee Personnel

  • J. B. George, TUSI, Project General Manager

i

  • H. O. Kirkland, TUSI/B&R, Project General Manager

,

  • 0.

N. Chapman, TUGCO, QA Manager

  • R. G. Tolson, TUGCO, Site QA Supervisor
  • J. V. Hawkins, TUGC0/G&H, Product Assurance Supervisor

J. T. Merrit, TUSI, Resident Manager

Other Personnel

,

R. V. Fleck, Civil Inspection Supervisor, Gibbs & Hill (G&H)

R. C. Barber, Welding Engineer, G&H

B. G. Banks, General Superintendent' Concrete, Brown & Root (B&R)

J. M. Reynolds, Electrical QC Engineer, B&R

K. W. Silverthorne, Mechanical QC Supervisor, B&R

S. S. Howell, Piping & Welding Supervisor, B&R

J. W. Holt, Piping / Welding Engineer B&R

R. H. Bodine, Lead Inspector, B&R.

M. Jeffers Construction QA Supervisor, Chicago Bridge & Iron (CB&I)

The IE inspectors also interviewed other contractor employees during

the course of the inspection.

-

  • denotes those present at the exit interview.

.

2.

Site Tour

The IE inspectors toured the various areas of the site to observe

construction activities in progress and to inspect housekeeping.

During the tour, the number and revisions were recorded for two

drawings observed at El 831'-6" in the Unit 1 Safeguard Building.

Subsequent comparison with the site Document Control Center indi-

cated that one of the drawings in the field was not the current

revision.

Revision

Control

DCC Current

Drawing

in Field

Number

Revision

El 0717-S

1

044

1

S 0901

2

044

3

-

-3-

.

.

-

-

.

Document control records indicated that Revision 3 to drawing S-0901

had been issued to the field on September 23, 1978. The field drawings

previously observed could not be relocated in the field for reverifi-

cation of revisions by the IE inspecter.

This matter is considered unresolved pending verification of the field

drawing status by the licensee to determine the status of the observed

drawing.

Further inspection in this area will be performed during a

subsequent inspection to determine the effectiveness of the licensee's

drawing controls.

3.

Reactor Coolant Pressure Boundary Piping - Unit 1

a.

Review of QA Implementing Procedures

The IE inspector reviewed the B&R QA manual and selectively

examined the following quality related procedures issued by

B&R to cover purchase, receiving inspection, storage, hand-

ling, installation and cleaning of reactor coolant pressure

boundary piping:

Procedure MEI-6, Rev. O, " Engineering Data for Preparation

of Component Support Travelers"

Procedure MEI-8, Rev. O, "NSSS Cleanliness Control During

Coolant Loop Installation"

Procedure PCI-001, Rev.1, " Pipe Department Cleanliness

Control"

Procedure CPM-10.4, Rev. O, " Cleanliness Control"

Procedure CPM-6.3, Rev. 3, " Preparation, Approval and

Control of Operation Travelers"

Procedure CPM-6.8, Rev. 0, " Fabrication and Installation

of Component Supports, including ASME III"

In the areas inspected, no discrepancies with the requirements

of Section III of the ASME B&PV Code were noted.

No items of noncompliance or deviations were identified.

-4-

_ .

.

.

-

.

.

.-.

-

_ _ -

,

q

j

&

.

i

.

i

b.

Observation of' Work Activities

,

'

The IE' inspector observed welding being performed on field welds

FW-15 and FW-16, Dwg BRP-RC-1-520-2.

FW-15 and FW-16 are the

butt welds connecting the " cold leg"' pipe spool of Loop 2 to the'

t

reactor coolant pump and reactor vessel, respectively.

A welder was monitored, while welding FW-15, for conformance to

the welding variables. specified.in WPS 88025, Rev. O and ICN 2.

The amperage, voltage, and travel speed were observed to be with-

in the requirements of the welding procedure specification.

The automatic welding being accomplished on FW-16 was monitored

for compliance with the requirements specified in WPS 99028,

Rev. O for welding variables.- The amperage and voltage were

observed to be within the' ranges permitted by the welding pro-

cedure specification. The travel speed was observed to'be~

2.5 inches per minute; whereas the travel speed required by

WPS 99028, Rev. 0 was 4-6 inches per minute.

Failure to follow the welding procedure. specification with

respect to travel speed appears to be in noncompliance with

the requirements of 10 CFR Part 50, Appendix B, Criterion V.

'

4.

Safety Related Piping - Unit 1

The IE inspector observed the following operations for fabrication

welding of safety related piping:

Fitup of FW-31, thy) BRP-DD-1-YD-20-1 and FW-6, Dwg BRP-SI-1-

YD-03-0

,

Root weld of FW-13, Dwg BRP-FW-1-17-RB-03-0 and FW-6 Dwg BRP-

SI-1-YD-03-0

,

Balance welding of FW-3, Dwg BRP-SI-1-SB-19.0

,

Final weld surface preparation of FW-1-1, Dwg BRP-FW-1-17-

l

1303-2 and FW-4, Dwg BRP-SI-1-SB-19-0

,.

In the areas inspected, no discrepancies from the requirements of

Section III of the ASME B&PV Code'were noted.

<

No items of noncompliance or deviations were identified.

l

t

'

i

f

a

-5-

.

..

_

.x..

_

+

.

-

ma-

- . .

.a...n_.

a,e

an

au

, _ _ _

.

-

.

..

.

1

5.

Installation of Cable Tray Hangers - Unit 1

<

The IE inspector visually inspected the~ installation welds for four

,

cable tray hangers, Mark Nos. 42, 227, 229 and 1213.

Review of

- inspection' records, records of welding variables checks, welder

qualifications, and nonconformance reports indicated that the welds

and documentation were in accordance with Gibbs & Hill Specifications

ES-100 and SS-16B and Brown ~ & Root Procedures ECP-10 and CP-QP-18.0.

No discrepancies with these requirements were noted.

No items of noncompliance or' deviations were identified.

..

.

.c

6.

Containment Exterior' Wall - Unit 1

The IE inspector observed a portion of concrete placement number

101-5805-026 for the containment exterior wall. This placement

included the circumference of the containment exterior wall from

elevations 955 to 961. The IE inspector observed preplacement clean-

liness ano form integrity, concrete placement techniques, consoli-

dation and lift height controls.

Review of field records for con-

crete temperature, air entrainment and slump tests indicated that

results were within the acceptable tolerances.

In the areas in-

spected, no discrepancies with the requirements of Gibbs & Hill

Specification 2323-SS-9 were noted,

No items of noncompliance or deviations were identified.

p

7.

Personnel Air Lock Installation - Unit 2

The Chicago Bridge and Iron records for the installation of the Unit

2 personnel air lock were reviewed. The' specific items reviewed

included welder qualification, weld procedure qualification, weld

material control records, weld inspection and air lock location

inspection.

Records reviewed did not indicate any discrepancy with

Gibbs & Hill Specification 2323-SS-14.

l

No items of noncompliance or deviations were identified.

8.

Unresolved Items

Unresolved items are matters about which more information is required

in order to ascertain whether they are acceptable items, items of

noncompliance, or deviations. An unresolved item disclosed during the

inspection is discussed in paragraph 2.

'

,

I

i

-6-

.

-

c,

--,-+.-___-_--6.________

+

-.. --

.

. .

~ _ _ _ _ _ , _ _ . - _ _-

.

.

,

.

.-

9.

_ Exit Interview _

The IE inspectors met with licensee representatives (denoted in para-

graph 1) and R. G. Taylor (NRC Resident Inspector) at the conclusion

of the inspection on October 13, 1978.

The IE inspectors summarized

the purpose, scope and findings of the inspection.

The licensee

representatives acknowledged the statements by the inspectors with

regard to the item of noncompliancc and the unresolved item.

i

>

-7-