Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
-.
'O I, ,
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION HONTHLY OPERATING REPORT MONTH December YEAR 1987 APPROVED:
( }
(h > kuV, sm10NniNAcE7-8802020179 871231 OOcx O n e 44p
- gor .
3 t.
OPERATING DATA REPORT DOCKET NO. 50-338 DATE 01-04-88 COMPLETED BY Brenda Garner TELEPHONE (703) 894-5131 X2527 OPERATING ST?TUS
- 1. Unit Name: North Anna 1
- 2. Reporting Period: December, 1987
- 3. Licensed Thermal Power (MWt): 2893
- 4. Nameplate Rating (Gross MWe): 947
- 5. Design Electrical Rating (Net MWe): 907
- 6. Maximum Dependable Capacity (Gross MWe): 963
- 7. Maximum Dependable Capacity (Net MWe): 915
- 8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 8,760 83,508
- 12. Number of Hours Reactor Was Critical 567.1 4,585.1 58,199.9
- 13. Reactor Reserve Shutdown Hours 22.5 169.3 6,274.7
- 14. Hours Generator On-Line 563.5 4,525.5 55,752.2
- 15. Unit Reserve Shutdown Hot:rs 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 1,479,767 11,386,891 146,172,655
- 17. Gross Electrical Energy Generated (MWH) 490,485 3,775,672 47,903,892
- 18. Net Electrical Energy Generated (MWH) 464,247 3,568,907 45,294,594
- 19. Unit Service Factor 75.7 51.7 66.8
- 20. Unit Availability Factor 75.7 51.7 66.8_
- 21. Unit Capacity Factor (Using MDC Net) 68.2 44.5 61.0_
- 22. Unit Capacity Factor (Using DER Net) 68.8 44.9 59.8
- 23. Unit Forced Outage Rate 24.3 34.9 ___ 15.2
- 26. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
a
.. .t-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT NA-1 DATE 01-04-88 COMPLETED BY Brenda Garner TELEPHONE 703-894-5151X2527 MONTH December, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (hVe-Net) (MWe-Net) 1 0 17 917 2 0 18 '917 ~
3 0 19 918 4 0 20 918 5 0 21 918 6 0 22 917 7 0 23 917 8 94 24 916 9 216 25 916 10 216 26 916 11 492 27 916 12 912 28 916 13 912 20 916 14 916 30 917 15 916 31 918 16 916 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
1 :
Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EX.PLANATION SHEET DOCKET NO. 50-338 REPORT MONTH December UNIT NAME- NA-1 YEAR 1987 DATE 01-04-88 COMPLETED BY Brenda Garner s
87-07 1) Continuation from November 1987, when the Unit was .taken off line to repair "B" reactor coolant pump #1 seal. Repairs were completed and Unit returned on line December 8, 1987, at 1228.
. I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-338' UNIT NAME North Anna 1 DATE 01-04-88 REPORT MONTH December, 1987 COMPLETED BY Brenda Garner TELEPHONE (703) 894-5151 X2527 I
No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours) Shutting 3
4 d* 5
^ ' * "
Down Reactor Report # Prevent Recurrence 87-07 871201 F 180.5 A 1 NA NA NA Continuation from November 1987, when the Unit was taken off line to repair 'B' reactor coolant pump #1 seal. Repairs were completed and Unit returned on line December 08, 1987 at 1228.
1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)
E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 H-Other (Fiplain) Exhibit H - Same Source
J VIRGINIA POWER NORTH ANNA POWER STATION UNIT NO. 1 MONTH December
SUMMARY
OF OPERATINO EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant- non-load related incidents.
.DATE TIME DATA December 1, 1987 0000 Began the month with Unit in Mode 5, continuing with repairs on 'B' reactor coolant pump #1 seal.
December 7, 1987 1023 Entered Mode 4.
1439 Entered Mode 3.
December 8, 1987 0851 Reactor critical.
1228 Unit online.
1250 Unit holding at 174MW-18% power, to unisolate the main feedwater regulator valves.
1401 Commenced ramp up to 30% power, main feed regulator valves in service.
1430 Unit holding at 252MW-30% power, for Chemistry.
l December 11, 1987 1100 Commenced ramp up to 100% power, released from Chemistry hold, 1414 Unit holding at 669MW-68% power, for Chemistry.
1527 Crmmenced e ramp up to 90% power, released from Chemistry hold.
i 1
l l
VIRGINIA POWER h0RTH ANNA POWER STATION UNIT NO. 1 MONTH December
SUMMARY
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
DATE TIME DATA December 11, 1987 1730 Unit holding at 875 MW - 90% power for 1-PT-24.1 calorimetric.
1745 Commenced ramp up to 100% power, 1-PT-24.1 calorimetric completed.
1913 Unit stabilized at 962MW-100% power.
December 31, 1987 2400 Ended the month with Unit at 968MW-100% power.
l l
l 2
t :
OPERATING DATA REPORT DOCKET NO. 50-339 DATE 01-04-88 COMPLETED BY Brenda Garner TELEPHONE (703) 894-5151 X2527 OPERATING STATUS
- 1. . Unit Name: North Anna 2 2 .' Reporting Period: December, 1987 '
Licensed Thermal Power (MWt):
.3. 2893
- 4. Nameplate Rating (Gross MWe): 947
- 5. Design Electrical Rating (Net MWe): 907
- 6. Maximum Dependable Capacity (Gross MWe): 963
- 7. ' Maximum Dependable Capacity (Net MWe): 915
- 8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
N/A L
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A __
l l This Month Yr.-to-Date Cumulative l
- 11. Hours In Reporting Period 744___ 8,760 61,776
- 12. Number of Hours Reactor Was Critical 744 6,842.2 48,468.3
- 13. Reactor Reserve Shutdown Hours 0 13.2 5,653
- 14. Hours Generator On-Line 744 6,785.5 47,656
[
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross. Thermal Energy Generated (MWH) 2,152,259 18,006,585 124,318,781
- 17. Gross Electrical Energy Generated (MWH) 715,304 5,971,044 41,205,121
- 18. Net Electrical Energy Generated (MWH) 680,468 5,653,448 39,058,347 t 19~ . Unit Service Factor 100 77.5 77.1 e
- 20. Unit Availability Factor 100 77.5 77.1
- 21. Unit Capacity Factor (Using MDC Net) 100 70.5 70.8
- 22. ' Unit Capacity Factor (Using DER Net) 100.8 71.2 69.7
- 23. Unit Forced Outage Rate 0 0 9.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): "
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ,
i
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-339 UNIT NA-2 DATE 01-04-88 COMPLETED BY Bren_da Garner TELEPHONE 703-894-5151X2527 MONTH December, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 916 17 923 2 917 18 920 3 918 19 904 4 919 20 904 5 915 21 903 6 915 22 901 7 914 23 900 8 915 24 916 9 915 25 918 l
10 916 26 917 11 917 27 917 12 919 28 917 l 13 922 29 916 l
l 14 905 30 917 l
l 15 920 31 918 16 922 l
l INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
i j
Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-339 REPORT MONTH December UNIT NAME NA-2 YEAR 1987 DATE 01-04-88 COMPLETED BY Brenda Garner No Entry This Month i
l l
l l
l
UNIT SifUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-339 UNIT NAME North Anna 2 '-
DATE 01-04-88 REPORT MONTH December COMPLETED PY Brenda Garner TELEPHONE (703) 894-5151 X2527 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours) Shutting 3
^C "
Down Reactor Report # Prevent Recurrence No Entry This Month 1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuatioas (NUREG-0161)
E-Operator Training & License Examination 5-Load Reduction F-Adminis t ra tive 9-Other G-Operational Error (Explain) 5 H-Other (Explain) Exhibit H - Same Source
NORTH ANNA POWER STATION UNIT NO. 2 MONTH December
SUMMARY
OF OPERATING EXPERIENCE Listed below in chronological sequence .s a summary of operating experiencec for this month which required load reductions or resulted in significant non-load related incidents.
DATE TIME DATA December 1, 1987 0000 Began the month with the Unit at 960 MW -
100% power.
December 14, 1987 0020 Commenced rampdown of 100 MW to perform Turbine Valve Freedom Test.
0059 Unit holding at 860 MW - 89% power, to perform Turbine Valve Freedom Test.
0350 Commenced ramp up to 100% power, Turbine Valve Freedom Test completed.
0430 Unit stabilized at 966 MW - 100% power.
December 31, 1987 2400 Ended the month with Unit at 961 MW -
100% power.
.4 VinoIxu ELucTuic Axn Pownn COMPANY Hicnxoxn,VinoixiA 2006i W.L.StawAur we!E."d"".'.""'..
o January 15, 1988 U.S. Nuclear Regulatory Commission Serial No.88-002 Attention: Document Control Desk N0/DJV:jmj Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the mor.th of December 1987.
Very truly yours, W. L. S wart 4a%ded &
Enclosures cc: U.S. Nuclear Regulatory Commission 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. J. L. Caldwell NRC Senior Resident Inspector North Anna Power Station l
l fh h
-. -.