Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N8911999-10-15015 October 1999 Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20216E7111999-09-0909 September 1999 Forwards License Renewal Application Including Form NRC-398 & Form NRC-396 for Jp Giar,License SOP-10061-3.Without Encls ML20216E5891999-09-0707 September 1999 Forwards Copy of Pilgrim Station Organization Structure. Encl Refelcts Changes in Upper Mgt Level Structure.Changes Were Effective 990901 ML20211M4501999-09-0303 September 1999 Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2 ML20211M9161999-08-31031 August 1999 Submits Review & Correction of Info in Reactor Vessel Integrity Database (Rvid),Version 2,re Pilgrim Station ML20211J8391999-08-30030 August 1999 Forwards Rev 1 to Provisional Decommissioning Trust Agreement for Plant,Changing Portions of Agreement to Permit Up to Two Distributions & Clarify Formula for Distribution ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20211C3381999-08-19019 August 1999 Provides semi-annual LTP Update,Including Schedule, Commitment Descriptions,Progress Since Last Update & Summary of Changes.Rev Bars Indicate Changes in Status Since Last Submittal ML20210U5761999-08-18018 August 1999 Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP ML20210U6691999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opposing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U7521999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opossing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5151999-08-17017 August 1999 Forwards Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim in Response to .Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI on 990713 ML20211B3841999-08-16016 August 1999 Forwards Response to NRC Second RAI Re Pressure Locking & Thermal Binding of SR power-operated Gate Valves ML20210U4831999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data Sheets for Period of 990101-0630,per 10CFR26.71(d) ML20210S0891999-08-0909 August 1999 Forwards Amend 11 to Indemnity Agreement B-48 Signed by Boston Edison Co & Entergy Nuclear Generation Co ML20210R6251999-08-0606 August 1999 Provides Supplementary Info on USI A-46 Implementation Methodology at Pilgrim Station,To Enable NRC to Perform Evaluation & Issuance of Plant Specific SER for Plant ML20210M9411999-08-0202 August 1999 Requests That NRC Treat Pending Actions Requested by Beco Prior to 990713,as Requests Made by Entergy.Ltr Requests That Minor Administrative Changes to License Amend 182 & Associated Ser, ,reflect 990713 Transfer ML20210H8761999-07-30030 July 1999 Requests That NRC Grant Exemption from Requirements of 10CFR50,App E,Section IV F,Which Would Authorize Rescheduling of 2001 Biennial Full Participation Emergency Preparedness Exercise for Pilgrim Station to 2002 ML20210H8661999-07-29029 July 1999 Provides Revised Response to GL 96-06 & Addresses NRC Insp Concern for Containment Penetration X-12.Info Submitted to Facilitate NRC Review & Closeout of Subject GL for Plant ML20216E2321999-07-26026 July 1999 Discusses GL 92-01,rev 1,suppl 1, Rv Structural Integrity. NRC Revised Info in Rvid & Releasing as Rvid Version 2 ML20216D4131999-07-22022 July 1999 Informs That J Conlon,License OP-11040-1,terminated Employment with Beco on 990703,per 10CFR50.74.Individual Will Not Participate in Util Licensed Operator Requalification Training Program ML20210E2231999-07-20020 July 1999 Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004 ML20210C4151999-07-19019 July 1999 Informs That Util Intends to Submit Approx Eight Licensing Actions in FY00 & Eight in FY01,in Response to Administrative Ltr 99-02.Actions Are Not Expected to Generate Complex Reviews ML20210F3711999-07-14014 July 1999 Informs NRC That Effective 990713,listed Pilgrim Station Security Plans Have Been Transferred from Boston Edison to Entergy & Are Still in Effect ML20210A9441999-07-14014 July 1999 Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p) ML20209G2251999-07-0909 July 1999 Forwards Insp Rept 50-293/99-03 on 990419-0609.Five Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C. Several Individual Tagging Errors Occurred ML20209C4661999-07-0707 July 1999 Forwards SE Accepting Addendum on Proposed Change in Corporate Ownership Structure Involving Entergy Nuclear Generation Co ML20209C7761999-07-0606 July 1999 Submits Annual Summary Rept of Changes Made to QAP Description as Described in QA Manual,Vol Ii.Rept Covers Period of Jul 1998 Through June 1999.No Changes Made During Period ML20209C3851999-07-0606 July 1999 Forwards Redacted Draft of Decommissioning Trust Agreement Re Transfer of PNPS & NRC Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generating Co ML20196J7251999-07-0101 July 1999 Informs of Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Pilgrim Nuclear Power Station ML20209B9411999-06-30030 June 1999 Discusses Deferral of IGSCC Welds to RFO 13.Deferral of Welds to Refueling Outage 13 Does Not Impact Acceptable Level of Quality & Safety Per 10CFR50.55(a)(3)(i) Since Plant in Compliance W/Exam Percentage Requirements ML20209B9431999-06-30030 June 1999 Provides Formal Notification That Closing Date for Sale & Transfer of Pilgrim Station Scheduled to Occur on 990713. a Wang Will Be Verbally Notified of Time of Sale Closing ML20209B9791999-06-29029 June 1999 Forwards Rev 13A to Pilgrims COLR for Cycle 13,IAW TS 5.6.5 Requirements.Rev 13A Provides cycle-specific Limits for Operating Pilgrim During Remainder of Cycle 13 ML20196H2381999-06-29029 June 1999 Forwards SER Denying Licensee 980820 Request for Alternative Under PRR-13,rev 2 for Use of Code Case N-522 During Pressure Testing of Containment Penetration Piping ML20209A8761999-06-28028 June 1999 Forwards SER Authorizing Licensee 990317 Relief Request to Use ASME Code Case N-573 as Alternative to ASME Code Section XI Article IWA-4000 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209A8701999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant,Reporting Status of Facility Y2K Readiness Encl ML20210U5901999-06-25025 June 1999 Opposes Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts.Expresses Skepticism Re Claim by Companies That Consumers Will Benefit from Proposed Consolidation & four-year Freeze in Base Rates ML20209C3431999-06-22022 June 1999 Forwards Addendum 1,Rev 14 to Pilgrim Station Security Plan,Iaw 10CFR50.54(p)(2).Changes Proposed Have Been Implemented & Constitute Increase in Plant Defense Plan Commitments.Encl Withheld,Per 10CFR73.21 1999-09-09
[Table view] Category:NRC TO U.S. CONGRESS
MONTHYEARML20246F9781989-08-17017 August 1989 Responds to Requesting Environ Assessment Re Resumption of Operation at Plant ML20236A4171989-03-0101 March 1989 Responds to 881222 Request That NRC Include Town of Bourne within Plume Exposure Pathway Epz.Entire Town Defined to Be within Ingestion Exposure Pathway EPZ Since Risk from Exposure Expected to Be Negligible ML20196C4151988-12-0101 December 1988 Responds to 881031 Requests from Town of Plymouth & Commonwealth of Ma for Addl Meetings Re Plant Emergency Preparedness Issues ML20205H2951988-10-13013 October 1988 Confirms 881012 Request to Address Commission at 881014 Meeting Re Restart of Plant.Commission Allotted Time for Personal Appearance at Beginning of Meeting ML20205B8321988-10-13013 October 1988 Responds to Re Results of NRC Integrated Assessment Team Insp,Results of Recent SALP & Current Status of Emergency Planning at Plant.Confirms 881012 Request to Address Commission at 881014 Meeting ML20205B7941988-10-13013 October 1988 Responds to Re Results of NRC Integrated Assessment Team Insp,Results of Recent SALP & Current Status of Emergency Planning at Plant ML20205C1741988-10-0707 October 1988 Confirms 880928 Request to Address Commission During 881014 Meeting Re Proposed Restart of Facility.Any Restart Decision Will Be Based on Judgement of Adequacy of Plant,Mgt & Offsite Emergency Planning ML20205B8791988-10-0707 October 1988 Confirms 881005 Request to Address Commission Scheduled 881014 Meeting Re Proposed Restart of Plant ML20207M2481988-10-0707 October 1988 Responds to Re Proposed Restart of Plant.Decision Will Be Based on Adequacy of Plant,Mgt & Offsite Emergency Planning.Commission Will Consider NRC Evaluations & Recommendations Re Restart at 881014 Meeting ML20154R5881988-05-27027 May 1988 Informs That Commission Has Not Made Decision Re Resumption of Plant Operations & Will Not Proceed Until Issues Addressed Satisfactorily.Nrc Evaluation of Direct Torus Vent Sys Will Determine Need for Environ Assessment ML20154C1561988-05-0909 May 1988 Responds to 880322 Request for Facility Fsar.Fsar Will Be Delivered within 2 Wks to ML Butler at Recipient District Ofc in Pembroke,Ma,As Requested ML20150F7091988-03-29029 March 1988 Forwards Response to Expressing Concern Re Both Process NRC Adopted to Reach Decision on Restart of Plant & Possible Timing of That Decision.Nrc Taking Necessary Steps to Assure That Plant Will Not Restart Unless Licensee Ready ML20148Q3221988-01-25025 January 1988 Responds to Re Constituents Alleged Core Exposure at Plant.Plant Experienced Fuel Problems in 1970s,fission Product Releases Resulted from Cladding Problems & Core Exposure Incident Has Not Occurred ML20239A7021987-12-0303 December 1987 Responds to Urging NRC to Convene Formal & Comprehensive Hearing on Plant Restart.Planned Public Meetings & Addl Steps Taken to Ensure Full Public Participation in Restart Process Listed ML20236W4981987-11-24024 November 1987 Responds to Requesting That NRC Perform Environ Assessment of Mods Made to Plant Containment Structure Prior to Restart.Util Will Not Be Allowed to Place Direct Torus Vent Sys Into Svc Until NRC Evaluation Complete ML20236T9521987-11-20020 November 1987 Responds to Urging NRC to Convene Formal & Comprehensive Hearing on Restart of Facility.Commission Believes That Commitment to Comprehensive Public Participation in Restart Decision Has Been Demonstrated ML20236W4381987-11-20020 November 1987 Responds to Urging NRC to Convene Formal & Comprehensive Hearing on Restart of Facility.Public Meetings Planned Discussed.More Views Will Be Heard & Considered Through Planned Meetings than in Requested Formal Hearing ML20236W9301987-11-20020 November 1987 Responds to Urging NRC to Convene Formal Comprehensive Hearing on Restart of Facility.Nrc Will Hold Public Meetings Before Taking Position on Facility Restart NUREG-0020, Responds to Encl Re Spent Fuel Storage Capacity at Plant.Spent Fuel Pool at Plant Has Sufficient Space to Accommodate Addl Fuel Storage Racks of Current Design1987-08-25025 August 1987 Responds to Encl Re Spent Fuel Storage Capacity at Plant.Spent Fuel Pool at Plant Has Sufficient Space to Accommodate Addl Fuel Storage Racks of Current Design ML20245B2111987-05-21021 May 1987 Responds to Re Emergency Response Plan & Request Re Pending Petition Concerning Facility.Nrc Awaiting FEMA Results of self-initiated Review of Overall State of Emergency Preparedness Before Responding to Petition ML20206C3571987-04-20020 April 1987 Responds to Forwarding Concerns of Mc Ott Re Facility.Response to Mc Ott Encl ML20212M5001987-03-0404 March 1987 Responds to 870130 Note Forwarding H Shetterly Re Availability of NRC Matls in PDR & Lpdr.Replacement Copy of Insp Rept 50-293/82-20 Will Be Placed in Plant Lpdr ML20209E6291986-08-26026 August 1986 Responds to 860731 Request to Be Kept Informed of Proceedings Re Facilities ML20212N1381986-08-25025 August 1986 Responds to 860714 Concerns Re Problems at Plant & Recommendation That Safety Issues Be Resolved Before Plant Resumes Operation.Nrc Insp History & Util Activities Since 860412 Shutdown Discussed.Related Info Encl ML20206M6321986-08-13013 August 1986 Responds to 860701 Request for Info Re Radioactive Emissions at Plant.Encl 1 Provides Requested Info,Including Identity of Releases Exceeding Limits for Normal Operation.Licensee Semiannual Radioactive Effluent Release Repts Also Encl ML20244E0761986-07-15015 July 1986 Responds to Encl Re Safety of Operations at Facility.Salp Repts,Special Diagnostic Team Insp,Augmented Insp Team & Confirmatory Action Ltr 86-10 Demonstrate NRC Pursuit of Responsibilities in Protecting Public ML20204G1251986-07-15015 July 1986 Responds to Listed Questions in 860715 Request Re Safety Operations at Plant,Including NRC Actions Taken to Assure That Deficiencies Identified in SALP Rept Corrected IA-87-645, Responds to Encl Re Safety of Operations at Facility.Salp Repts,Special Diagnostic Team Insp,Augmented Insp Team & Confirmatory Action Ltr 86-10 Demonstrate NRC Pursuit of Responsibilities in Protecting Public1986-07-15015 July 1986 Responds to Encl Re Safety of Operations at Facility.Salp Repts,Special Diagnostic Team Insp,Augmented Insp Team & Confirmatory Action Ltr 86-10 Demonstrate NRC Pursuit of Responsibilities in Protecting Public ML20207E4271986-07-11011 July 1986 Forwards Commissioner Responses to Prehearing Questions for 860716 Hearing on Significance of Mgt Problems at Commercial Nuclear Facilities in Response to ML20140H8221984-04-18018 April 1984 Forwards Press Release 84-50 Re NRC Proposed Fine Against Util for Failure to Implement Adequate Radiological Controls During Maint ML20054E6111982-06-22022 June 1982 Responds to Re Ma Executive Ofc of Energy Resources Request to Use Civil Penalty Imposed on Util in Home Weatherization & Conservation Program.Commission Considering Review of Director Denial ML20054H8551982-06-0202 June 1982 Responds to to Nj Palladino Re Concerns About Facility Operation.Assignment of Resident Inspectors to Maintain Continuous 24-h Coverage Is Not Best Approach to Assure Adequate Protection of Public Health & Safety ML20054E8491982-05-25025 May 1982 Responds to 820503 Request for Addl Info Re Safety Concerns Expressed by Local Residents Concerning Facility ML20062J3251980-09-30030 September 1980 Discusses Emergency Planning Regulations,In Response to Re L Boyd Concerns.Fema Is Responsible for Adequacy of Emergency Preparedness in States & Communities Around Nuclear Plants NUREG-0474, Forwards NUREG-0474 Re Safety of Pressure Suppression Containment Sys,Per 780615 Request.Rept Covers All Pressure Suppression Containment Designs in Use in Us.W/O Encl1978-08-0101 August 1978 Forwards NUREG-0474 Re Safety of Pressure Suppression Containment Sys,Per 780615 Request.Rept Covers All Pressure Suppression Containment Designs in Use in Us.W/O Encl 1989-08-17
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20210U7521999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opossing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5761999-08-18018 August 1999 Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP ML20210U6691999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opposing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5151999-08-17017 August 1999 Forwards Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim in Response to .Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI on 990713 ML20216E2321999-07-26026 July 1999 Discusses GL 92-01,rev 1,suppl 1, Rv Structural Integrity. NRC Revised Info in Rvid & Releasing as Rvid Version 2 ML20210E2231999-07-20020 July 1999 Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004 ML20210A9441999-07-14014 July 1999 Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p) ML20209G2251999-07-0909 July 1999 Forwards Insp Rept 50-293/99-03 on 990419-0609.Five Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C. Several Individual Tagging Errors Occurred ML20209C4661999-07-0707 July 1999 Forwards SE Accepting Addendum on Proposed Change in Corporate Ownership Structure Involving Entergy Nuclear Generation Co ML20196J7251999-07-0101 July 1999 Informs of Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Pilgrim Nuclear Power Station ML20196H2381999-06-29029 June 1999 Forwards SER Denying Licensee 980820 Request for Alternative Under PRR-13,rev 2 for Use of Code Case N-522 During Pressure Testing of Containment Penetration Piping ML20209A8761999-06-28028 June 1999 Forwards SER Authorizing Licensee 990317 Relief Request to Use ASME Code Case N-573 as Alternative to ASME Code Section XI Article IWA-4000 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20195K3071999-06-15015 June 1999 Forwards Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Plant ML20195K3851999-06-11011 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing.Application Seeks Approval of Proposed Indirect Transfer of FOL for Plant ML20196K9921999-06-0404 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990328.As Part of Reorganization,Division of Licensing Project Mgt Created ML20207E7351999-05-27027 May 1999 Responds to Requesting Reduction in IGSCC Insp Frequency Per GL 88-01 to Be Performed During Upcoming RFO 12.Forwards SE Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of H Water Chemistry ML20207B6341999-05-26026 May 1999 Informs That Licensee 990415 Submittal Re Financial Position of Entergy Intl Ltd,Llc Will Be Marked as Proprietary & Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20207B7391999-05-24024 May 1999 Forwards from Kc Goss of FEMA to Cl Miller Forwarding FEMA Analysis of Prompt Alert & Notification Sys for Pilgrim Nuclear Power Station.Based on Review,No Significant Problems Exist with Alert & Notification Sys ML20207B0701999-05-24024 May 1999 Responds to Sent to Ofc of Congressional Affairs Requesting Info on Concerns Raised by One Constituent,J Riel Re Y2K Compliance of Pilgrim NPP in Plymouth,Ma ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20206U7501999-05-17017 May 1999 Forwards Insp Rept 50-293/99-02 on 990308-0418.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML20206M1891999-05-11011 May 1999 Forwards SE of 980826 Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Sys Piping for Plant ML20206E0551999-04-29029 April 1999 Discusses Bulletin 96-03 Issued on 960506 & Beco Responses ,970207,981230,990121 & 990309 for Pilgrim Npp. Determined That Actions Taken Should Minimize Potential for Clogging of ECCS Suction Strainers ML20206B3031999-04-20020 April 1999 Forwards Insp Rept 50-293/99-01 on 990125-0307.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy.Security Program Was Also Inspected ML20205Q9491999-04-0909 April 1999 Informs That on 990225 NRC Staff Completed PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20205B9391999-03-24024 March 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure-Locking & Thermal-Binding of Safety-Related Power-Operated Gate Valves ML20204C7871999-03-17017 March 1999 Informs That Application Submitting Transfer of Facility Operating License & Matls License & Proposed Amend, Will Be Marked as Proprietary & Be Withheld from Public Disclosure Pursuant to 10CFR2.709(b)(5) ML20199K8321999-01-22022 January 1999 Forwards Request for Addl Info Re Transfer of Facility Operating License for Plant ML20199H5811999-01-20020 January 1999 Submits Exemption Withdrawal of 10CFR70.24(a) Re Criticality Accident Monitoring Requirements ML20198L7781998-12-22022 December 1998 Forwards Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted.Nrc Regional Specialists Reviewed EP & Fire Protection Programs.Ep Program Was Found to Be Well Implemented ML20198J0891998-12-21021 December 1998 Forwards NRC Response to Me Lampert Re Transfer of Ownership of Pilgrim Station in Response to Senator Kerry Ltr Dtd 981019.NRC Will Terminate License Only When Licensee Remediates Site to Levels Specified in Regulations ML20198J1041998-12-21021 December 1998 Forwards NRC Response to Me Lampert Re Transfer of Ownership of Pilgrim Station in Response to Congressman Markey Ltr Dtd 981019.NRC Will Terminate License Only When Licensee Remediates Site to Levels Specified in Regulations ML20137T2211998-12-17017 December 1998 Responds to to Chairman Jackson Re Concerns About Possible Sale of Pilgrim Station & Waste Disposal Issues.No Application for License Received Nor Contract of Sale Between Beco & Entergy.Record Copy ML20198J1161998-12-17017 December 1998 Responds to to Chairman Jackson in Which Recipient Expressed Concern About Possible Sale of Pilgrim Station & About Waste Disposal Issues.Nrc Has Not Received Application for Transfer of License to Date ML20198P2781998-12-17017 December 1998 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety.App B Records Being Withheld in Entirety (Ref FOIA Exemption 4) ML20198B2021998-12-0909 December 1998 Advises of Planned Insp Effort Resulting from Licensee Irpm Review.Details of Insp Plan for Next 6 Months & Historical Listing of Plant Issues Encl ML20197H8521998-12-0909 December 1998 Responds to Ltr Sent to Chairman SA Jackson on 981028 Re Concern That NRC Will Not Perform Environ Assessment in Connection with Consideration of Approval of Transfer of License for Plants to Permit Sale ML20196J1201998-12-0404 December 1998 Ack Receipt of 971217 & 30 & 980112,0309,0423 & 0630 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-293/97-02,50-293/97-11,50-293/97-13, 50-293/97-80 & 50-293/98-01.Actions Found Acceptable ML20196B5421998-11-24024 November 1998 Forwards Plant SRO & RO Initial Exam Rept 50-293/98-301OL During Wk of 981016-23 ML20196F7631998-11-24024 November 1998 Forwards Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted.Three Issues Identified Re Containment Flooding,Surveillance Testing Criteria & Protection for RBCCW System from High Energy Line Break Inside Drywell ML20196C1191998-11-20020 November 1998 Forwards Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted.During Insp Period,Chemical Decontamination of Residual Heat Removal Sys Was Well Planned & Implemented Which Reduced Radiation Doses in Heat Removal Quadrants ML20195H7361998-11-16016 November 1998 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 981016 & 981019-23 at Facility.Nine Applicants Were Administered Exam & Nine Passed.Licenses Issued & Individual Test Results Encl.Without Encl ML20155C4781998-10-29029 October 1998 Forwards RAI Re Resoultion to GL 96-06 Issues at Plant,Unit 1.Response Requested by 981130 ML20154J7881998-10-0808 October 1998 Authorizes Mb Santiago to Administer Initial Written Exams to Applicants Listed (Except Applicants Redlined), on 981016.NRC Region I Operator Licensing Staff Will Administer Operating Tests During Week of 981019 1999-09-30
[Table view] |
Text
. m..
.. s JAN 2 51988 The Honorable Gerry E. Studds United States House of Representatives Washington, D.C. 20515
Dear Congressman Studds:
This is 'n response to your letter dated November 23, 1987, concerning the Pilgrim Nuclear Power Station.3 The following information is provided on the "matter of an alleged "core exposur.e incident" (taken here to mean partial core uncovering), raised in the letter from your constituent which was enclosed with your letter. Our review concludes that, although there were some fuel problems in the 1970's, these were associated with fuel design and fabrication tech-nology and not due to any fuel uncovering during plant operation.
By early 1971, the Atomic Energy Comission was aware that as a result of fab-rication and quality centrol problems at one of the vendor's fuel facilities, the General Electric (GE) Company supplied fuel to several reactor facilities, including Pilgr'm, which contained fuel pellets with improper fuel enrichment.
All of the fuel supplied to Pilgrin was returned to the GE facility for rework between August and November 1971. During that time, 2452 fuel rods were re-placed. After the fuel was returned to Pilgrim, additional problems were iden-tified which required that fourteen fuel rods from each of twelve fuel bundles be replaced. This work was done onsite and all prior to the initial loading of fuel into the Pilgrim reactor. Inspectors from the Atomic Energy Comissien followed the fuel enrichment problems, including witnessing portions of the onsite fuel rod replacement, to ensure the issue was resolved prior to the Boston Edison Conpany (BECo) loading the fuel into the reactor between June 9-15, 1972.
The initial criticality at Pilgrin occurred on June 16, 1972. Following start-up testing, the facility was placed in commercial operation in December 1972.
The facility then operated until its first refueling outage which occurred from December 28, 1973 through July 24, 1974. During this outage, 6ECo began re-lacing the original type of fuel bundles with those of a newer design. Twenty p(cut of 580) fuel bundles were replaced with newer type fuel bundles.
During late 1974, BEco noted a rise in the release from the fuel of airborne iodine and particulate fission products at Pilgrim. Reactor power level had to be reduced to maintain the gaseous effluent levels within the NRC License and Technical Specification requirements. Thn increase in gaseous effluents was subsequently detemined to be due to cracks in the fuel cladding. These cracks were caused by hydriding, a recognized corrosion mechanism, and fuel pellet-clad interaction which allowed fission products to enter the reactor coolant system. Other facilities experienced similar "leaking fuel" problems with the older type fuel. It was intended that the newer type fuel bundle would resolve such fuel leakage problems.
moA88?i!Bi8%a H
The Honorabl'e Gerry E. Studds As noted above, the reactor power level had to be reduced to maintain gaseous effluents within regulatory liW.ts. Increased AEC/NRC inspection effort was spent to ensure the facility cperated within these limits. This included.
several independent measurement inspections. In addition, refueling activities were observed during the 1974, 1976 and 1977 refueling outages. BEco completed
- the replacement of the older type fuel during the 1977 outage which resolved the problems.
Based on our onsite reviews conducted at the time and our recent review of records, including inspection reports, we conclude that the fission product releases at Pilgrim resulted from the cladding problems discussed above and that a "core exposure incident" has not occurred.
We remain willing to receive further information, or talk directly to the interested constituent in order to more fully appreciate his concern if you deem it appropriate.
I trust this letter has been responsive to your request.
Sincerely, (signea) T. A. Rehnt
'ictor Stello, Jr Executive Director for Operations
- p , , - - - . a -. - -c
.- +
7
- . l . p. V .
The Honorable Gerr'y E. Studds' DISTRIBUTION:
V. Stello
-J. Taylor T. Rehm T. Murley J. Hurray H. Denton W. Russell J. Allan W. Kane S. Collins J. Wiggins R. Blough L. Doerflein C. Warren S. Varga B. Boger R. Wessman D. Mcdonald EDO 003376 Secy No. 139 Docket No. 50-293 Public Document Room (PDR) local Public Document Room (LPDR)
EDO Reading File Comonwealth of Massacubusetts (2) 4/A2re.-
C4 RI:DRP Dnerflein RI:DRP Blough RI:DRP Wiggins RI:DRP Kane RI:RA Russell E
Stello M -
1/20/88 1/20/88 1/20/88 1/20/88 1/20/88 1/g /88
- p. 99
4 2 '*
,..s n eds . _.
'h[ ') , ( jl. UNITED STATES
-[- f ,g _ NUCLEAR REGULATORY COMMISSION
.t- .-e j- WAS!HNGTON, D. C. 20555 g ,
EDO PRINCIPAL CORRESPONDFNCE' CONTROL 003376
~
FROM: DUE: 04,/-44N EDO CONiROL
/ -/p- gy DOC DT: 11/23/87 REP._GEPRY E. STUDDS FINAL REPLY:
- tot -
^
PRADBURNE FOR SIGNATURE OF: ** GRFEN ** SFCY NO: 1391 EXECUTIVF DIRECTOR DESC: POUTING:
- ENCLOSES l.ETTER FROM CONSTITUENT RE POSSIBLE MURLEY -
INCIDENT A*. PILCPIM MURRAY-DATE:-12/22/87 ASSIGNED TO: -RI CONTACT: RUSSELL
! SPECIAL INSTRUCTIONS OR REM. ARKS:
l l
l
(.
t 1
l l
l 4
l l
1 i
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER NUMBER: CRC-87-1391 LOGGING DATE: Dec 4 87
-ACTION OFFICE
AUTHOR: G.E. Studds AFFILIATION: U.S. HOUSE OF REPRESENTATIVES LETTER-DATE: Nov 23 67 FILE CODE: ID&R-5 Pilgrim
SUBJECT:
Questions about a possible incident at the Pilgrim plant ACTION: Direct Reply DISTRIBUTION: OCA to Ack, Docket SPECIAL HANDLING: None NOTES.
DATE DUE: . Jan 4 8$
SIGNATURE: . DATE SIGNED:
AFFILIATION:
l l
l l
l l
l l Rec'd Off. EDO Date I # ~ 2 A 'O b-
-~-
=
Time l
l l
l I
l
{ --- 001376 f
E DO w_
,)I :. (' '
. , OFFICE OF THE SECRETARY.
. CORRESPONDENCE CONTROL TICKET U.S. IRC PAPER NUMBER: CRC-87-1391 LOGGING DATE: Dec 4 87 ACTION OFFICE: es tvo 037 DEC -7 PH 2: 58 AUTHOR: G.E. StuddsCEib,k[hk'
-AFFILIATION:' U.S. HOUSE OF REPRESENTATIVES LETTER DATE: Nov 23 87 FILE CODE: ID&R-5 Pilgrim
SUBJECT:
Questions about a possible incident at the Pilgrim plant ACTION: Direct Reply DISTRIBUTION: OCA to Ack, Docket SPECIAL HANDLING: None NOTES:
DATE DUE: Bec 10::87 Jan 4 88 SIGNATURE: . DATE SIGNED:
AFFILIATION:
pu l pdi [hsyv
- ~ /-
- i. ,,
I;
)
- 'r* M ' i i
- AA hen bil. Ibb f' Date-- l}- 2Al ny h50 N / ED0 --- 003376 N
l } J l
a