ADMINISTR ATIVE CONTROL 5 d.

Documentation of all failures (inability to lif t or reclose within the toleranets al!6wed by the design basis) and challenges to the pressurizer PORVs or safety valves.

MONTHLY OPER ATING REPORT 6.9.1.6 Routine reports of operating statistics and shutdown experience shall be submitted on a monthly basis to the Director, Office of Resource Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20333, with a copy to the Regional Administrator, Region I, U.S. Nuclear Regulatory Commission, no later than the !$th of each month following the calen9ar month covered by the report.

SPECIAL REPORTS 6.9.2 Special reports shall be submitted to the Regional Administrator, Region 1, U. S. Nuclear Regulatory Commission, within the time period specified for each report.

These reports shall be submitted covering the activities identified below pursuant to the requirements of the applicable reference specification inoperable Seismic Monitoring Instrumentation, Specification 3.3.3.3.

a.

b.

Inoperable Mateorological Monitoring Instrumentation, Specification 3.3.3.4.

c.

Safety Class 4

Inservice inspection Program

Review, I

Specification 4.4.10.1.

d.

ECCS Actuation, Specifications 3.3.2 and 3.3.3.

e.

Fire Detection Instrumentation, Specifications 3.3.3.7.-

f.

Fire Suppression Systems, Specifications 3.7.9.1 and 3.7.9.2.

g.

RCS Overpressure Mitigation, Specification 3.4.9.3 h.

Radiological Effluent Reports required by Speelfications 3.!!.l.2, 3.13.2.2, 3.11.2.3 arid 3.11.4.

1.

Degradation of containment structure, Specification 4.6.1.6.4 J.

Steam Generation Tute Inspection,5pecification 4.4.3.1.3.

k.

Accident Monitoring Instrumentatton,5peelfication 3.3.3.8.

1.

Radiation Monitoring Instrumentation, Specification 3.3.3.1.

Reactor Coolant System Vents, Specification 3.4.!!.

m.

MILLSTONE - UNIT 2 6-19 Amendment Nos. 36 f)d0gd. !H,!!!,!!),

e80412o255 0e0331 PDR ADOCK 05

[

P

ADMINISTRATIVE CONTROLS 6.10 RECORD RETENTION 6.10.1 The following records shall be retained for at least five years:

Records and logs 'of facility operation covering time interval at 4.

each power level, b.

Records and logs of principal maintenance activities, inspections, repair and replacement of principal items of equipment related to nuclear safety.

c.

All REPORTABLE EVENTS.

d.

Records of surveillance activities, inspections and calibrations required by these Technical Specifications.

Records of reactor tests and experiments.

e.

f.

Records of changes made to operating procedures.

g.

Records of radioactive shipments.

h.

Records of sealed source leak tests and results.

1.

Records of annual physical inventory of all sealed source material of record.

6.10.2 The following records shall be retained for the duration of the facility operating license:

Records and drawing changes reflecting facility design modifications a.

made to systems and equipment described in the final Safety Art.lysit

Report, b.

Records of new and irradiated fuel inventory, fuel transfers and assembly burnup histories,

c.,, Records of facility radiation and cor,tamir,ation surveys.

Re' cords of radiation exposure for all individuals entering d.

radiation control areas.

Records of gaseous and liquid radioactive material released to e.

the environs.

f.

Records of transient or operational cycles for those facility components designed for a limited number of transients or cycles.

l MILLSTONE - UNIT 2 6-20 Amendment No. 7.38,194.111,

.