Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20214G6691987-05-19019 May 1987 Notice of Reconstitution of Aslb.* C Bechhoefer,Chairman & Ga Ferguson & Rf Cole,Members.Served on 870520 ML20062A8861982-07-23023 July 1982 Clarification of Closing of Record in Proceeding.Record Closed,Effective 801022 ML20008D9331980-10-20020 October 1980 Notice of Withdrawal of 750725 CP Application.Certificate of Svc Encl ML19296B9771980-01-30030 January 1980 Order by Ny State Board on Electric Generation Siting & Environ,Closing Proceeding Re PASNY Application for Certificate to Construct Plant at Cementon,Ny.Application Withdrawn on 800118 ML19210E6431979-10-24024 October 1979 Response to Util 791016 Rept Re Status of Application.Util Application Must Be Dismissed Per ASLB 791016 Order ML19210C3441979-10-0101 October 1979 Order from State of Ny Board of Electrical Generation Siting & Environ Dismissing Util Application for Certificate of Environ Compatibility & Public Need.Continuation of Proceeding Not in Public Interest ML19224D6951979-06-0505 June 1979 Green County,Ny Joins & Supports Ny Dept of Public Svc 790514 Appeal of Ruling of Presiding Examiner Cohen.Ruling Denied Motion to Dismiss Application to Terminate Proceeding.Requests Dismissal of Util License Application ML19289E9921979-03-19019 March 1979 Response by Intervenor Greene County (Ny) to NRC & Ny State Public Svc Commission Objections to Interrogatories Submitted by County to NRC & State Commission Witnesses ML19273B3251979-03-16016 March 1979 Transcript of Testimony Before ASLB Re Const Application for Nuclear Site Adjacent to Present Facility Operated by Lehigh Portland Cement Co ML19263E0861979-03-12012 March 1979 Testifies on Land Use Issues.Supporting Documentation Encl ML19282C4381979-02-27027 February 1979 Motion for Extension of Time Until 790314 in Which to File Testimony & Exhibits ML19263D2411979-02-27027 February 1979 Supports Ny State Dept of Environ Conservation'S Interrogatories to Nrc.Interrogatories Re Fes Encl ML19263D2381979-02-27027 February 1979 Supports Ny State Dept of Environ Conservation'S Request to NRC for Production of Documents ML19296A4841979-02-27027 February 1979 Motion of Dept of Environ Conservation for Extension of Time to Submit Discovery Requests ML19282C3621979-02-23023 February 1979 Greene County,Ny'S Interrogatories to NRC Re NUREG-0512. Answers Requested on or Before 790309.Certificate of Svc Encl ML19282C2771979-02-23023 February 1979 Lehigh Portland Cement Co'S Motion for Extension of Time Until 790316 in Which to File Testimony & Exhibits.Lehigh Has Been Investigating New Info Made Available 790201. Affidavit of AF White Encl ML19312B6121979-02-12012 February 1979 Testimony Before State of Ny Board on Electric Generation Siting & Environ & Before ASLB Re Const of Proposed Plant ML20104A2451979-02-0909 February 1979 Notifies That Power Authority of State of Ny Applied for Discharge Permit & Requested Verification of Best Available Intake Technology.Recommendations for Permit Have Been Made & Hearings Will Be Held by 790402 ML19259B3631979-01-0505 January 1979 County Survival Committee'S Further Responses to NRC Interrogatories.Believes SER to Be Deficient Re non-military Traffic,Population Related to Water Supply, Radioactive Matls & Conditions of Government Agencies ML19256A8841978-12-19019 December 1978 Order by State of Ny Public Svc Commission Dismissing Appeals from Rulings on Determination of Need & Conformance W/Long Range Plans Re Greene County Nuclear Generating Site ML19259B0371978-12-15015 December 1978 Response by Petitioners to Intervene Citizens to Preserve the Hudson Valley,Columbia County Survival Committee & Mid-Hudson Nuclear Opponents to 781201 Motion by Applicant for Summary Disposition of Petitioners' Contentions ML20148A2031978-12-15015 December 1978 Bd Order Concerning Discovery Responds to Motion for Order Compelling Discovery & Permitting Supplementation of Testimony Upon Receipt of Responses & Subsequent Order & Renewed Motion.Order Is Specific to Each Interrog ML20148A2951978-12-15015 December 1978 Applicant Is Ordered to Produce Those Documents Requested by Intervenors Which Are Presently in Its Possession or Readily Attainable ML19322A0821978-12-0707 December 1978 Opposition by Petitioners to Intervene Citizens to Preserve the Hudson Valley & Columbia County Survival Committee to NRC 781204 Motion for Summary Disposition of Contentions. Certificate of Svc Encl ML20147J1031978-12-0404 December 1978 Motion by NRC Staff for Summary Disposition of Greene County Contention I.A,Citizens to Preserve the Hudson Valley Contention I.B.1 & Columbia County Survival Comm Contention 5.a.Affidavits & Cert of Svc Encl ML20147C7901978-11-29029 November 1978 Response by Intervenors Citizens to Preserve the Hudson Valley,Columbia County Survival Committee & Mid-Hudson Nuc Opponents in Opposition to Renewed Motion of NRC Staff for an Order Compelling Discovery.Cert of Svc Encl ML20147B2341978-11-28028 November 1978 NRC Staff'S Response to Intervenor Lehigh Portland Cement Co'S Motion to Quash or Modify Subpoenas of 780817 & 781010. Staff Will Not Oppose Entry of Protective Order If Decided That Matl Sought Is Proprietary.Cert of Svc Encl ML20147B7771978-11-22022 November 1978 Motion on Behalf of Citizens to Preserve the Hudson Valley, Columbia County Survival Comm & Mid-Hudson Nuc Opponents for an Order Compelling Applicant Pasn to Produce Specified Documents.Supporting Documentation Encl ML20150D0951978-11-22022 November 1978 Orders Extension of Time for Answers to NRC Staff Motions for Summary Disposition on Various Contentions Until 781204. Time for Answers to Motions Is Extended to 781219 ML20197D4451978-11-22022 November 1978 Opposes 781107 Motion by Which Lehigh Portland Cement Co Seeks Protective Order Exempting It from Certain Document Production Request.Appl Claims Documents Are Highly Relevant to Hearings & Subj Matter Has Already Been Disclosed.W/Encl ML20148T2981978-11-16016 November 1978 NRC Staff Motion for Extension of Time Until 781121 to File Motion to Compel Against Three Intervenors.W/Encl Cert of Svc ML20148M6391978-11-0707 November 1978 Suppl Testimony of NRC Staff on Geology of Proposed Site for Subj Facil.Staff Concludes That Capable Faults Do Not Exist Beneath Hudson River ML20150C9591978-11-0707 November 1978 Motion on Behalf of Lehigh Portland Cement Co to Quash or Mod Subpoenas & for an Exemption from Disclosure or for Permission to Withhold from Disclosure Certain Documents. W/Encl Affidavits of R Bohman & L Cummings ML20148M6491978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Contentions of Intervenors Columbia County,Cementon Civic Assocs Brand & Mid-Hudson Nuc Opponents Re Safe Shutdown of Facil in Earthquake & Relationship of Quarrying to Seismicity ML20148M5461978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenors Columbia County Survival Comm'S & a Reuter'S Stipulated Contention 9 Re Accidental Releases to Water Supply ML20148M5511978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Greene County'S Stipulated Contention I.A. Re Security at Proposed Facil ML20148M5571978-11-0707 November 1978 Prepared Testimony of J Martin of NRC Staff Re Review of Emergency Plans for Proposed Subj Facil ML20148M5641978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.1. Re External Flooding ML20148M5771978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.2. Re Alleged Deficiencies in PSAR Prepared by Appl Pasn ML20148M5951978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.4. Re Valve Submergence ML20148M6111978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.5. Re Systems Separation ML20148M6221978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.6. Re Occupational Exposure ML20148M6321978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Columbia County Survival Comm'S & a Reuter'S Stipulated Contention 5A Re Aircraft Impact Hazard at Site of Proposed Facil ML20148T5941978-11-0303 November 1978 Testimony of R Shropshire & Be Podwal on Emergency Procedures Contentions ML20148T5841978-11-0101 November 1978 Testimony of Wa Rodger,R Shropshire & CA Mazzola on Radiological & Exclusion Area Contentions ML20148H9471978-10-31031 October 1978 Nrc Staff Motion for Order by ASLB Compelling Intervenors Mid Hudson Nuc Opponents,Cementon Civic Association,Citizens to Preserve Hudson Valley & Columbia Survival Comm to Answer Interrogs & Suppl Its Own Testimony.Cert of Svc Encl ML20204B7621978-10-20020 October 1978 Motion for Order Compelling Lehigh Portland Cement Co to Respond to NRC Interrogatories & Requests for Production of Documents.Certificate of Svc Encl ML20147J2101978-10-10010 October 1978 Notice of Change to Svc List,Including Change of Address for Columbia County Survival Committee & Citizens to Preserve Hudson Valley.Certificate of Svc Encl ML20147F1911978-10-0202 October 1978 Interrogatories to Greene County,Towns of Catskill & Athens & Villages of Catskill & Athens Contentions.Contention States That Possible Consequences of Blasting in Vicinity of Cementon Site Not Well Evaluated ML20147F1791978-10-0202 October 1978 Interrogatories to Columbia County Survival Committee. Petition Contends Greene County Site for Nuclear Plant Unsuitable for Listed Reasons & That Applicant PSAR Inadequately Considered Site Susceptability to Quakes 1987-05-19
[Table view] Category:TRANSCRIPTS
MONTHYEARML19273B3251979-03-16016 March 1979 Transcript of Testimony Before ASLB Re Const Application for Nuclear Site Adjacent to Present Facility Operated by Lehigh Portland Cement Co ML19263E0861979-03-12012 March 1979 Testifies on Land Use Issues.Supporting Documentation Encl ML19312B6121979-02-12012 February 1979 Testimony Before State of Ny Board on Electric Generation Siting & Environ & Before ASLB Re Const of Proposed Plant ML20148M6391978-11-0707 November 1978 Suppl Testimony of NRC Staff on Geology of Proposed Site for Subj Facil.Staff Concludes That Capable Faults Do Not Exist Beneath Hudson River ML20148M6321978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Columbia County Survival Comm'S & a Reuter'S Stipulated Contention 5A Re Aircraft Impact Hazard at Site of Proposed Facil ML20148M6221978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.6. Re Occupational Exposure ML20148M6111978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.5. Re Systems Separation ML20148M5951978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.4. Re Valve Submergence ML20148M5771978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.2. Re Alleged Deficiencies in PSAR Prepared by Appl Pasn ML20148M5641978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.1. Re External Flooding ML20148M5571978-11-0707 November 1978 Prepared Testimony of J Martin of NRC Staff Re Review of Emergency Plans for Proposed Subj Facil ML20148M5511978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Greene County'S Stipulated Contention I.A. Re Security at Proposed Facil ML20148M5461978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenors Columbia County Survival Comm'S & a Reuter'S Stipulated Contention 9 Re Accidental Releases to Water Supply ML20148T5941978-11-0303 November 1978 Testimony of R Shropshire & Be Podwal on Emergency Procedures Contentions ML20148T5841978-11-0101 November 1978 Testimony of Wa Rodger,R Shropshire & CA Mazzola on Radiological & Exclusion Area Contentions 1979-03-16
[Table view] Category:DEPOSITIONS
MONTHYEARML19273B3251979-03-16016 March 1979 Transcript of Testimony Before ASLB Re Const Application for Nuclear Site Adjacent to Present Facility Operated by Lehigh Portland Cement Co ML19263E0861979-03-12012 March 1979 Testifies on Land Use Issues.Supporting Documentation Encl ML19312B6121979-02-12012 February 1979 Testimony Before State of Ny Board on Electric Generation Siting & Environ & Before ASLB Re Const of Proposed Plant ML20148M6391978-11-0707 November 1978 Suppl Testimony of NRC Staff on Geology of Proposed Site for Subj Facil.Staff Concludes That Capable Faults Do Not Exist Beneath Hudson River ML20148M6321978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Columbia County Survival Comm'S & a Reuter'S Stipulated Contention 5A Re Aircraft Impact Hazard at Site of Proposed Facil ML20148M6221978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.6. Re Occupational Exposure ML20148M6111978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.5. Re Systems Separation ML20148M5951978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.4. Re Valve Submergence ML20148M5771978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.2. Re Alleged Deficiencies in PSAR Prepared by Appl Pasn ML20148M5641978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.1. Re External Flooding ML20148M5571978-11-0707 November 1978 Prepared Testimony of J Martin of NRC Staff Re Review of Emergency Plans for Proposed Subj Facil ML20148M5511978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Greene County'S Stipulated Contention I.A. Re Security at Proposed Facil ML20148M5461978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenors Columbia County Survival Comm'S & a Reuter'S Stipulated Contention 9 Re Accidental Releases to Water Supply ML20148T5941978-11-0303 November 1978 Testimony of R Shropshire & Be Podwal on Emergency Procedures Contentions ML20148T5841978-11-0101 November 1978 Testimony of Wa Rodger,R Shropshire & CA Mazzola on Radiological & Exclusion Area Contentions 1979-03-16
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML19273B3251979-03-16016 March 1979 Transcript of Testimony Before ASLB Re Const Application for Nuclear Site Adjacent to Present Facility Operated by Lehigh Portland Cement Co ML19263E0861979-03-12012 March 1979 Testifies on Land Use Issues.Supporting Documentation Encl ML19312B6121979-02-12012 February 1979 Testimony Before State of Ny Board on Electric Generation Siting & Environ & Before ASLB Re Const of Proposed Plant ML20148M6391978-11-0707 November 1978 Suppl Testimony of NRC Staff on Geology of Proposed Site for Subj Facil.Staff Concludes That Capable Faults Do Not Exist Beneath Hudson River ML20148M6321978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Columbia County Survival Comm'S & a Reuter'S Stipulated Contention 5A Re Aircraft Impact Hazard at Site of Proposed Facil ML20148M6221978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.6. Re Occupational Exposure ML20148M6111978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.5. Re Systems Separation ML20148M5951978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.4. Re Valve Submergence ML20148M5771978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.2. Re Alleged Deficiencies in PSAR Prepared by Appl Pasn ML20148M5641978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Citizens to Preserve the Hudson Valley'S Stipulated Contention I.B.1. Re External Flooding ML20148M5571978-11-0707 November 1978 Prepared Testimony of J Martin of NRC Staff Re Review of Emergency Plans for Proposed Subj Facil ML20148M5511978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenor Greene County'S Stipulated Contention I.A. Re Security at Proposed Facil ML20148M5461978-11-0707 November 1978 Suppl Testimony of NRC Staff in Response to Intervenors Columbia County Survival Comm'S & a Reuter'S Stipulated Contention 9 Re Accidental Releases to Water Supply ML20148T5941978-11-0303 November 1978 Testimony of R Shropshire & Be Podwal on Emergency Procedures Contentions ML20148T5841978-11-0101 November 1978 Testimony of Wa Rodger,R Shropshire & CA Mazzola on Radiological & Exclusion Area Contentions 1979-03-16
[Table view] |
Text
-. ... .. , . - .- . ._ ___ _ _ _ _ _ - _ _
O UNITED STATES OF AMERICA _
NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
POWER AUTHORITY OF THE STATE Docket No. 50-549 0F NEW YORK (Greene County Nuclear Power Plant) )
SUPPLEMENTAL TESTIMONY OF NRC STAFF IN RESPONSE TO GREENE COUNTY ET AL.,
STIPULATED CONTFNTION I.A (SECURITY) by Michael J. Gaitanis
?Stieg ()o c. ,
Michael J. Gaitanis l This testimony is offered in response to Contention.I.A. of Greene 2 County et al., which reads as follows:
3 I. The Preliminary Safety Analysis Report ("PSAR") prepared I
4 by the Applicant does not provide reasonable assurance, as required 5 by 10 CFR 5550.35 and 50.40 that (a) the health and safety of the 6 public will not be endangered, and (b) the Applicant is financially )
7 qualified to engage in the proposed activities in accordance with the 8 Commission's regulations in the following respects:
9 A. The Applicant has not demonstrated that the proposed j 10 site is suitable from the point of view of complying with the 11 security requirements of Part 73 of 10 CFR due to the easy access to 12 the site from the Hudson River and the resulting exposed nature.
13 All land and water approaches to a nuclear power plant site must be 14 considered in the development of the site's physical protection systems 15 and security plan. A physical protection system for nuclear power reactors 16 is required by regulations, principally by 10 CFR Parts 50 and 73. These 17 regulations require that each applicant for a license to operate a nuclear 18 power plant provide protection to meet the general performance objectives 19 of 573.55(a) and to submit a security plan describing the equipment, 20 barriers, security organization, contingency plans, training programs and administrative controls for NRC review and approval. Applicants applying 21 f r an operating license, the receipt of which will be after February 23, 22 1979, are required to provide a physical security plan as required by 23 24 150.34(c) and to provide the level of protection identified in 573.55.
l l
1
Michael J. Gaitanis _
1 Complete implementation of the physical security plan and final 2 demonstration of compliance is required prior to issuing an operating ~l 3
license to the applicant. Satisfactory protection against intrusions 4 by land and/or water must be demonstrated in the security plan in order 5
to receive NRC approval. -l We have reviewed the information submitted by Power Authority of the 6
State of New York in its application for a construction permit describing l 7
the proposed security plan for the Greene County Nuclear Power Plant site.
8 The applicant states in the Greene County Nuclear Power Plant-PSAR 513.7.1 l 9
that "A protected area will be created by erection of a physical barrier 10 j) completely around the plant" and shows in PSAR site plan Figure 1.2-3 a continuous protected area barrier surrounding the plant. All safety 12 related structures are to be located inside the protected area. Therefore, 13 we have concluded that the applicant is planning to protect the site against g
easy cess and that there will be no unprotected access routes from the 15 Hudson River.
17 18 19 20 21 22 23 24 2
l l.
l
.o 1
.a Michael J. Gaitanis Division of Operating Reactors U. S. Nuclear Regulatory Commission ' i 1
PROFESSIONAL QUALIFICATIONS , )
l I am a Reactor Safeguards Analyst in the Reactor Safeguards Licensing Branch, Of fice of Nuclear Reactor Regulation, U. S. Nuclear Regulatory Canmission.' I am responsible for the technical aspects of safeguards 1
reviews of plant physical protection systems and plans associated wi th l licensing actions related to canmercial nuclear reactors used to generate l electric power.
I received a Bachelor of Science degree in Chemistry from the Pennsylvania State University in 1948. Industrial Management was studied at the Universi ty of Tennessee, 1955-1956, and Electronics at the Knoxville School of Electronics, 1961-1964. Other educational background includes:
- 1. Oak Ridge National Laboratory (prior to 1962)
- a. Radiochemi stry
- b. Reactor Shielding
- c. Statistics
- 2. Short courses related specifically to safeguards at
, a. Georgia Institute of Technology - Management and Economics of Nuclear Fuels (1971)
- b. Anerican Society for Industrial Security - Public utili ties Securi ty (1974)
- c. Defense Industrial Security Institute - industrial Facilities Protection for Privately Owned and Privately Operated Facili ties (1975)
- d. George Washington University - Introduction to Fault Free Analysis (1976) - Application of
-- Systems Analysis Methods to Security Control Programs (1976)
L m
1 a i l
. . 1
-2 From 1948 to 1951 I was employed as a chemist by Linde Air Products _
Company and Koppers Company, Inc. )
l 1
From February 1951 to August 1964 I was employ (d by Union Carbide Corp., .
l Nuclear Division at the Oak Ridge National Laboratory in a number of technical and supervisory positions. Iwasinvolvediykheanalytical )
chenistry of a number of irradiated fuel reprocessing syste s such as )
ociv.ir.r.
Purex, Thorex, and 'iolatility. I was associatec niin tr,e e rg, Level Analytical Facility, the Homogeneous Reactor (#1), the Molten Salt Reactor, the processing of plutonium and recovery of americium.
From August 1964 to July 1967 I was employed as the Plant Manager of the Quehanna Facility by the Martin Co. I was responsible for the safe, secure, and productive operation of personnel and facilities in pro-ducing radioactive fuels from Strontium-90 for thermo-electric generators.
From July 1967 to present I have been employed by the Atomic Energy Commission and the Nuclear Regulatory Commission. From 1967 to 1972 I was employed as an Isotope Fuel Specialist and then a Technical Manager by the Division of Space Nuclear Systems providing program direction j and budgetary guidance in the production of heat sources for radioisotope l
thermoelectric generators for space missions such as Apollo and Pioneer.
v v y e
.e From 1972 to 1978 I was employed as an Operations Analyst and Reactor -
Protection Specialist by the Directorate of Standards Development. l There I was responsible for recommending, administering techni, cal programs, and participating in studies directed at providing the basis for new material protection guidelines, criteria, standards and regulations. l l
In this capacity I have been the Task leader for the de,velopment and pre- l paration of the following guides for publication:
Regulatory Guide Title 1.17 Protection of Nuclear Power Plants Against Industrial Sabotage 5.10 Selection and Use of Pressure-Sensitive Seals on Containers for Onsite Storage of Special Nuclear Material 5.12 General Use of Locks in the Protection and Control of Facilities and Special Nuclear Materials 5.15 Security Seals for the Protection and Control of Special Nuclear Material In addition, I was one of four team leaders responsible for implementation of 10 CFR Part 73.50, " Requirements for physical protection of licensed activities," and 173.60, " Additional requirements for the physical protection of Special nuclear material at fixed sites." Further I was the Task Leader responsible for developing and preparing for publication in the Federal Register the regulations for the physical protection of nuclear power reactors 10 CFR Part 373.55. From May 1977 to May 1978 as a loanee from Standards Development to NRR and from May 1978 to the present as a
Reactor Safeguards Analyst, I have been the lead reviewer for physical , _
security plans submitted by eight power reactori licensees to meet the requirements of 673.55 at their sites.