ML20148L244
| ML20148L244 | |
| Person / Time | |
|---|---|
| Site: | Hartsville |
| Issue date: | 10/11/1978 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Niav Hughes TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20148L249 | List: |
| References | |
| NUDOCS 7811200182 | |
| Download: ML20148L244 (2) | |
See also: IR 05000518/1978010
Text
, .
- - - _ _ _ _ - - -
b
-w=2t1
a"*'---
~
UNITED STATES
pm atCh
NUCLEAR REGULATORY COMMISSION
gg
'
o,
,
'o
REGION li
g
,
b
)
5
$
101 M ARIETT A STREET, N.W-
C#
'
k
[
g
OCT 1 1 1978
gp/
.....
In Reply Refer To:
RII:JKR
50-518/78-10
50-519/78-10
50-520/78-10
50-521/78-10
Tennessee Valley Authority
Attn:
Mr. N. B. Hughes
Manager of Power
830 Power Building
Chattanooga, Tennessee
37401
Gentlemen:
This refers to the inspection conducted by Mr. J. K. Rausch of this
office on September 14-15, 1978, of activities authorized by NRC
Construction Permit Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153
for the Hartsville Units 1, 2, 3 and 4 facilities, and to the discussion
of our findings held with Mr. R. T. Hathcote at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
,
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
l
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
l
in a separate part of the document.
If we do not hear from you in this
l
regard within the specified period, the report will be placed in the
Public Document Room.
1811'zo o @
l
'
l
- _ _ _ _ _ - _ _ _ _ _ _ _ _
.
OCT 111978
.
Tennessee Valley Authority
-2-
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Sincerely,
d'?$
W
C. E. Murphy, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
Inspection Report Nos.
50-518/78-10, 50-519/78-10,
50-520/78-10 and 50-521/78-10
cc w/ encl:
s
Mr. J. E. Gilleland
Assistant Manager of Power
830 Power Building
Chattanooga, Tennessee 37401
Mr. R. T. Hathcote, Project Manager
Hartsville Nuclear Plant
P. O. Box 2000
i
Hartsville, Tennessee 37074
.,
1
l
Mr. J. F. Cox
400 Commerce Street
W9D214
Knoxville, Tennessee
37902