Forwards IE Inspec Repts 50-518/78-10, 50-519/78-10, 50-520/78-10 & 50-521/78-10 on 780914-15 During Which No Items of Noncompliance Were Noted
ML20148L244
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 10/11/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Niav Hughes
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20148L249 List:
References
NUDOCS 7811200182
Download: ML20148L244 (2)


See also: IR 05000518/1978010

Text

- - - _ _ _ _ - - -

, .

b

-w=2t1

a"*'--- ~

pm atCh UNITED STATES

'

, o, NUCLEAR REGULATORY COMMISSION gg

b

,

)

'o REGION li g

' 101 M ARIETT A STREET, N.W- C#

5 $

ATL ANTA, GEORGIA 303o3 g

k *

[

.....

  • OCT 1 1 1978 gp/

In Reply Refer To:

RII:JKR

50-518/78-10

50-519/78-10

50-520/78-10

50-521/78-10

Tennessee Valley Authority

Attn: Mr. N. B. Hughes

Manager of Power

830 Power Building

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by Mr. J. K. Rausch of this

office on September 14-15, 1978, of activities authorized by NRC

Construction Permit Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153

for the Hartsville Units 1, 2, 3 and 4 facilities, and to the discussion

of our findings held with Mr. R. T. Hathcote at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", ,

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

l such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

l

in a separate part of the document. If we do not hear from you in this

l

regard within the specified period, the report will be placed in the

Public Document Room.

1811'zo o @

l '

l

- _ _ _ _ _ - _ _ _ _ _ _ _ _

.

OCT 111978

.

Tennessee Valley Authority -2-

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

W d'?$

C. E. Murphy, Chief

Reactor Construction and

Engineering Support Branch

Enclosure: Inspection Report Nos.

50-518/78-10, 50-519/78-10,

50-520/78-10 and 50-521/78-10

cc w/ encl: s

Mr. J. E. Gilleland

Assistant Manager of Power

830 Power Building

Chattanooga, Tennessee 37401

Mr. R. T. Hathcote, Project Manager

Hartsville Nuclear Plant

P. O. Box 2000

i

Hartsville, Tennessee 37074 .,

1

l Mr. J. F. Cox

400 Commerce Street

W9D214

Knoxville, Tennessee 37902