Text
o Portland General E!ectric Company David W. Cockfield Vice President. Nuclear March 18, 1988 Trojan Nuclear Plant Docket 50-344 License NPF--I U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington DC 20555
Dear Sir:
Trojan Nuclear Plant 1988 RefuelinR and Maintenance Outage The 1988 refueling and maintenance outage is scheduled to begin April 13, 1988 and last 49 days. The scheduled date for returning to power operation is May 31, 1088.
In order to complete post-maintenance and physics testing to support the return to power, May 21, 1988 has been scheduled as the work completion date. Extensive proplanning has taken perce to ensure this schedule can be achieved.
A list of the major activities scheduled for th -
outage is provided as Attachment 1, with key dates included where appropri.
ate.
A critical path schedule and refueling work schedule are provided as.
Sincerely,
/
Attachment c:
Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. William Dixon State of Oregon Department of P.norgy Mr. R. C. Barr NRC Resident Inspector Trojan Nuclear Plant 8803300244 880318
'p f PDR ADOCK 05000344 g
'l(\\
P PDR 121 S w S3 mon Street. Powd. Ov),n 97204
s Trojan Nuclear Plant Document Control Desk Docket 50-344 March 18, 1988 License NPF-1 Page 1 of 2 MAJOR 1988 REFUELING AND MAINTENANCE OUTAGE ACTIVITIES Refueling (April 23-May 9):
Full core off-load to support fuel pellet retrieval.
Fuel Pellet Retrieval (April 27-May 4):
+ Remove reactor vessel lower internals.
. Vacuum reactor vessel.
. Vacuum fuel transfer path.
Reactor Coolant Pump Motor Oil Cooler Inspections (Start April 18).
Sludge lancing ( April 18-13).
Eddy-current examination of steam generator tubes (May 12-21).
- J-tube inspection (Start April 22).
l
- Replacement of two J-tubes per steam generator (Start April 22).
- Secondary side manway inspections (Start April 22).
Inscevice Inspection (Start April 18):
l l
- 463 Class 1 inspections to be performed, i
"B" Reactor Coolant Loop Hot Leg Elbow Ultrasonic Examination (April 23-May 1).
Snubber Inspections (Start April 15).
Condenser Tube Inspection:
- "C" condenser.
- Tube cleaning, if needed.
l Containment Local Leak Rate Testing (Start April 13):
[
74 tests.
l Moisture Separator Reheater and Heater Drain System Inspection.
l l
u
's s,
Trojan Nuclear Plant Document Control Desk Docket 50-344 March 18, 1988 License NPF-1 Page 2 of 2 Motor-Operated Valve Maintenance.
Routine Valve Repairs and Repacking.
Routine Pump Inspections.
Significant Plant Modifications:
- Remote shutdown panel installation.
- Pipe supports.
- Replacement of steam generator blowdown system.
. Control room habitability modifications.
- Feodwater piping replacements.
+ Replacement of both station batteries.
- Replacement of Darton pressure transmitters.
l l
t' l
SAB/2438P
jvrojanWucB(arLFldnt lfocurint Control Disk
~
5 Dockst 50 3d 4 Mtrch 18, 1988
- License NPF-1 Attachmsnt 2 Pega 1 of 27 lfil h e.
)8 ;B 4
Y p _.
l
..a d-t ill
- $ lis 8p<
M a
+
es l
5 K
.E
.k p:
-lw+
_. r, 8b
+a.
l-I!
si h3
.hn,! !s,.!
Js A
l 2.
u is z
il
~~
h e5 1i c.
g 4
h.s
'I ti 5
')
HH
!.!. 2
- y
--s d
m i ti Alti 3,
y d
ags V
i-8
,13
..E..I !!3-t i
$~50-is l!
- ts i
+
5 il ik 54 o-
-5 351 h
j' ac 1
f-j gg
! g,. g.....
g g
sa r
i r
iE 3;
d a
d 2
6 A _; /) ifh ea rt nG J
& lE tip D
Z x
f i
,~
?
WroScn G3uc3 tr P16nt
~~
Docursnt Control Disk Dockst 50-3 4 March 18 1988 l
License NPF l g--
Page 2 of 27 g
3 II
!a! IN E
I i;
i l+g
+$
e 5
Y 6
g 3
i Ek!
P.]
If t
I L3
+$ +1-J
!s e
85it e
ik!
- E R
d b
b J
I@z l a z
y lby
+
l$lgnh p
l s
l@. SU
+555 l.
8 a
s 3
1
!!5
[
l
.5 l
v l~
h E
U J
3
!E.c a d
g9i a
,3 e
ur
_e i
ss 2
v l
i
R s 3 Trojan Nucliar Plant Docusent Control Desk gDocket 50-3d4 March 18, 1988 License NPF 1 t~~
Page 3 of 27 a
w 9
g a i 22 z!g ;l v e
i g-!, h s-
.y 1;!-
in-n p
-f_n+
R I.
A e
3
,h en
=
55 i)'a) t s
!d C
P d.
!c - E *
~"
l6+!*
e
" l j-
!e -
! a 4 59e
_n l
9 W
I l
e a
1 b
l l
lRA 5
1 g
'M l
[))
y e
e a
3 g
I I
g r
e ec v
E g
e g
e B
i 6'1
- a aa
.9 a d 3_J
?
l
~
8fTrojan Nucis*r Plant Docussnt Control Desk f
Docket 50-34%
March 18, 1988 License NPP-il Page 4 of 27
$kh sem susu
~
i G
I8 5 l
.I i.n3
^
s v
$E Y a
i N
1 i.
=
H S
l
'l 1
I I
i A
i i
.l'.;
+
a Il g
ll ll ll I
11 8
ii
(
ll ll 11 11 IE e
,,E
~ll I
N E
l JD
.E g
11:
$h 1
~
~ ~ ~
g
.5 ja lii
- b b )g b i b a
,.aN$
j
TROJAN 1988 REFUELING OUTAGE PGE - TROJAN
.t* t2 CO
+on Os UN DATE 83DEC87 5949 HRS VOR KI NG.
SCHEDUL E PROJECT START 12APR88 m if a QOJECT 880VTAGE ORIGINAL COMPL.
4JUN88 o"O m E3 3DE 1 REFUELING MILESTONES SORT BREAKS E START NODES PAGE 1
________._________._________._________._________._________._________._________._________._________._________._________.____ =,? $
=,e 3DE=O/FE DESCR I P T 1 ON DUR STAR T F I N I5H
'7g
______'D___ _________.______'D ACTIVITY SCH
co START 1988 OUTAGE B
EVENT 12APR88 m
12900 8:00 UNIT OFF LINE D
EVENT 13APR88 12901 8:08 START LLPT ACTIVITIES U
EVENT 13APR88 12910 7:00 ALARA:
1.
ALAR A SCOPE REOL' IRED COMMENTS:
1.
THE NEXT ILRT MUST BE COMPLETED PRIOR TO APRIL 30, 1990.
COMMEhCF S/G SLUDGE LANCE PREP VORK D
EVENT 13APR88 12911 15:00 COMMENCE COOLDOWN EVENT 13APR88 12982 22:00 START MECHANICAL SNUBBER SURVEILLANCE INSPECT EVENT 15APR88 638(18 9:ss COMMENCE FOP,CED OX1DATION (89 HRS)
B EVENT 15APR88 129H3 17:00 OPEN CONTAINMENT - EQUIPMENT HATCH / AIR LOCK EVENT 16APR88 1290')
7:00 CONTAINMENT OPEN FOR VOPK
's EVENT 18APR88 12904 7:88.
START PREP VOPK FOR RCP MOTOR INSPECTION 8
EVENT 18APR88 12915 7:88 N > % G9 ueao START S/G & B-P HYDRAULIC SNUBBER INSPECTIONS 9
EVENT 18APR88
$$nO
- Pg 63700 7:03 y, Oii - o ];
ALARA:
O e 03 " i 1.
ALARA SCOPE REOUIRED
"' S
- o n>
-o:
'8 N3 COMMENTS:
C $i 03 n l o1 W
i i
O1 M
N
)E I REFUELING MILESTONES SORT B3EAKS
.______._________._________._________._________._________._______ESTART COCES__._________._________.__-______._________._________
PAGE 2
JE=O/FE DESCR I P T ION DUR STAR T F IN ISH O F
ACTIVITY SCH*D SCH'D REP *D
.______._________._________._____-__-._________._________._________._ REP *D________._________._________.__.______._________._____
l.
IN 1986 B S/G SNUBBER RESERVOIR VAS FOl'ND EMPTY. ENGINEERING EVALUATED: IMMEDIATE 2$
ACTION TAKEN TO DECLARE B RCS LOOP IN-ns a n OPERABLE NW **
-. c. m DRAIN RCS TO CENTERLINE 118 HRS 3 8
EVENT 19APR88 M
12985 1:88 ny e
SLUDGE LANCE A.
D.
B. C S/G*S 8
EVENT 19APR88 a
12916
!!:88 ENTER MODE 6 8
EVENT 28APR88 12917 18:58 CONSTRAINTS:
1.
ENTER MODE 6 AT BEGINNING OF THE 2ND PASS, STEP 19 FHP 5-2.
- 2. MUST COMPLETE GOI-11.
3.
NEED TO BORATE TO REFUELING CONCENTRATION PRIOR TO ENTERING MODE 6.
ESTAB MODIFIED CONTAINMENT INTEC - MODE 6 8
EVENT 21APR88 12986 17:88 LIFT REACTOR HEAD 8
EVENT 22APR88 12987 7:88 COMMENCE A TRAIN OUTAGE 8
EVENT 22APR88 12912 11:88 COMMENCE RCS B LOOP ELBOV EXAM S
EVENT 23APR88 12942 7:88 COMMENCE CORE UNLOAD 14 DAYS) 8 EVENT 23APR88 12988 18 88 SECURE CONTMT PURCE EXH DURING FUEL MOVEMENT 8
EVENT 24APR88 12922 23288 COMFLETED S/G SLUDGE LANCE 8
EVENT 24APR88 12944 23:88 m>mo COMPLETED S/G SLUDGE LANCE ACTIVITIES 8
EVENT 26APR88 mM 2 O 129I4
$ " n" "
18:08 o =r a RESTORE A TRAIN 8
EVENT 27APR88
$53 os =r o
12945 O
4:88 m3-n O
hJ
- O
%J hJ C3 a.
03 M Ow Ue m
X
SE I REFUELIEG MILESTO:ES SORT BREAKS ta O *4
_______._________._________._________._________._________._______E START NODES PAGE 3
P' o
__._________._________._________._________._________._________4;ns"
)E=O/FE DESCR I R T I ON DUR g
STAR T F I N I SH ACTIVITY p am SCH REP SCH REP m
3
_______._________._________._________._________._________.______'D___._____'D____.______'D___.______'D___._________.___
o COMMENCE FUEL PELLET RETRIEVAL 2OC 8
EVENT 27APR88
$ $ C, 12948 17:38 a
c-m COMPLETED A TRAIN OUTAGE 8
EVENT 28APR88
-- c. m 12946 6:88
'V COMPLETE RCS B LOOP ELBOW EXAM 8
EVENT IMAY88 w
12943 12:08 COMMENCE B TRAIN OUTAGE 8
EVENT 2MAY88 12913 7:88 RELOAD CORE 8
EVENT 4MAY88 12939 17:38 COMPLETE FUEL PELLET RETRIEVAL 8
EVENT 4MAY88 12941 17:38 RESTORE B TRAIN 8
EVENT 7MAY88 12947 1:88 START PREP VORK FOR EDDY CURRENT TESTING 8
EVENT 7MAY88 12935 7:88 COMPLETED 8 TRAIN OUTAGE 8
EVENT 8MAY88 12948 3:58 SET RX HEAD - DRAIN RCS TO CENTERLINE 8
EVENT 12MAY88 12918 1:88 DECON REACTOR CAVITY (78 HRS) 8 EVENT 12 MAYS 8 12919 14:88 SFP VITAL 2 AREA 38 DAYS AFTER S/D 8
EVENT 13MAY88 12934 2:88 COMMENCE EDDY CURRENT TESTING (9 DAYS TOTAL) 8 EVENT 13MAY88 12936 11:88 CONTAINMENT CLEANUP 8
EVENT 16MAY88 12964 7:88 T>%C D M mO TENSION REACTOR HEAD 8
EVENT 17MAY88 C
- O C mM nn 12921 7:88 sa S # $
EDDY CURRENT TESTING COMPLETE 8
EVENT 17MAY88 0 *u -- =
12937 23:88 n
o m
-o
%J N O3 03 M 3 ;.'
(D M O
H Um M
PC"
4 E
I REFUELICG MILESTONES SORT BREAKS E STA
._-_--_---,_-_------+-_-------+-_-------s_--_--_--+---------+- RT NOIES PAGE 4
---__-_e_-_---_--+-_-__---_.-__--_---+_--------+------__
e eg E=O/FE D ESCR I P T I ON DDR STAR T F1 N I SH w-O n
",O 0, ACTIVITY SCH'D SCH REP
,_--_-----+----__---+__-------+----_--_-+_---_----s_REP'D_-__-_-_,__---_'D_--+_-_--_'D g
som
__..---_-_---+._-_--___s--_____
w_n a RESTORE VALVE LINEUPS FOR FILL & VENT 8
EVENT 28MAY88 wm 12965 25 o c 28:88 m e o muw COMPLETED EDDY CURRENT TESTING ACTIVITIES 8
EVENT 21MAY88 s
- c. o 12938
- C' 2 3:88 CONTAINMENT CLOSEOUT m
8 EVENT 21MAY88 12924
[
15:58
,e s
VORK COMPLETION DATE TO SUPPORT S/U 8
EVENT 21MAY88 n
12969 15 88 FILL & VENT, PREPARATIONS TO ENTER MODE 4 8
EVENT 2tMAY88 12925 28s88 COMMENCE COLD' ROD DROPS 8
EVENT 23MAYB8 12926 7:88 READY FOR STARTUP 8
EVENT 23MAY88 12933 7:08 POT 12-2 8
EVENT 24MAY88 12966 7:88 COMMENCE HEAT UP 8
EVENT 27MAY88 12927 21:58 ENTER MODE 4 8
EVENT 27MAY88 12928 23:50 ENTER MODE 3 12929 8
EVENT 28 HAY 88 4:88 COMMENCE HOT ROD DROPS 8
EVENT 28MAY88 12938 13:80 LOV POVER PHYSICS TESTING (36 HRS) 8 EVENT 29MAY88 12931 8:88 COMMENCE POWER ESCALATION 8
EVENT 31MAY88 12932 8:88 END OF 1988 REFUELING OUTAGE 8
EVENT 31MAY88 m>%U 12999 n
--____.___---_--.---_-----.__-----__.-____--__.__----__._-___---_.--_--_---.-- SsB8 O 2 O C
___--_._-__ _---.____-__ _.-------__._-____ 3 6 g
i REFUELING MILESTONES gx EVENT 31MAYB8 s
__-___,__-_---__,____ -__-,____-_---,_____----+-___ -__-+-------__,-_----__-+-__8sBB O O 03 n
_____-,_-____---,__--_----,--__.._--,_--_-__'?%_*g M
wO N N %O U 00 n 03 M O
U m
M N
TROJAN 1988 REFUELICC OUTAGE PGE - T2OJA2 O DATE G30EC87 8958 HRS
- p. e g VOR K I NG SCHEDULE
>O M
PROJECT START 12APR88 nno OJECT 880UTAGE m,w c,-
ORIGINAL COMPL.
4JUN88 DE 1 UMIT S/D AND COOLDOVN mos SORT BREAKS E START NODES o
1 z$5
... --------.---------.---------.---------.---------.---------. PAGE DE=O/FE DESCR I PT I ON ACTIVITY DUR STAR T F IN I SH
.--------,n-n 7 y $'
,---------+---------.---------+------- -,---------+- SCH'D REP'D SCH'D REP'D
.---------,---------+---------,---------.---------.-------. c m
,- n S/D REACTOR 2
13APR88 13APR88 m
12885 8:88 2:88 COOLDOWN RCS TO MAINTAIN S/G PRESS 9 1888 PSIG 9
13APR88 13APR88 n
12888 5:88 14:88 CONSTRAINTS:
1.
MUST MAINTAIN CONSTANT TEMPERATURE DURING LIF T TEST.
COMMENTS:
1.
INSTALL S/G TEMPERATURE MONITOR IN C-448 (INSIDE CONTAINMENT) - I&C ACTION.
- 2. NEED S/G 9 1888 FOR S/G SAFETY TESTING.
3.
MP-7-1 (188Be +/- I8al MAINTAIN PRIMARY PRESSURE (1888-2188 PSIC) 8 13APR88 13APR88 a
12886 14:88 22:88 COMMENTS:
1.
NEED PRESS BETVEEN 188"8-2188 FOR PRZR SAFETY TESTING.
COOLDOWN RrS TO 325 DEC F +/- 28 D EG F R
13APR88 14APR88 128tB 22ss8 6:88 CONSTRAINTS:
1.
S/G SAFETY TESTING.
- 2. PICT 22-2 (HOT TESTING).
- 3. DEGAS - VERIFY THE LINE IS PURGED AND OPERABLE. (1984 DEGAS VAS DELAYED DUE TO PLUGGED LINE.3 4.
VERIFY ADEOUATE VASTE GAS CAPACITY IS MAINTAINED.
- 5. BE AWARE THAT FILLING THE HUTS WILL REQUIRE VASTE GAS STORAGE.
T > 3: C mn mo 6.
HAVE RAD CON & CHEMISTRY START WORKING ON Q"2@
DISCHARGE PERMIT FDR CONTAINMENT PURGE.
nya cw a
COMMENTS:
a >= 3 oo 00 n
- 1. OVERPRESSURE MITICATION SYSTEM PICT*S.
mu-2.
PERFORM POT 2-4-DI 9 RCS PRESSURE y" _. O
%J N C3 00 n 00 M Ow Um mw
'E 1 UCIT S/D AND COOLDOVN SORT BREAKS
______._________._________._________._________._________._______ESTAQT NODES __._________._________._________._________.__
PAG 2
rUH
_____._________;-_O g E=O/FE DESCR I P T I ON DUR STAR T F I N 1SH ACTIVITY e X 'a SCH REP SCH*D REP D
- ______._________._________._________._________._________._-____'D___._____'D____.______.__.______'D___._________._________
BETVEEN Ses & 1888 PSIG.
u 2:
2: oc COOLDOVN RCS TO 148 DEG F 15 14APR88 ISAPR88 N : o 12812 mww 18:88 9:gg 8 8 *
-- a' m CONSTRAINTS:
M 1.
CHEMISTRY - SULPHATE HIDEOUT.
T
- 2. RCS THERMAL EXPANSION READINGS - TPT-175.
y
- 3. ADDITION OF VET LAVUP CHEMICALS.
m e.
3 TAKE RCS SOLID n
8 ISAPR88 ISAPR88 12815 9:58 17 gs CONSTRAINTS:
- 1. H2 MUST BE (4 CC/KG.
2.
I&C NEEDS TO HOOK UP RECORDER PRIOR TO GOING SOLID.
- 3. REQUIRED POT'S COMPLETED PRIOR TO GOING SOLID.
COMMENTS:
1.
SUPPORT REQUIRED:
A.
I&C HOOK UP INSTRUMENTATION.
FORCED OXIDATION OF THE RCS. TEMP (125 DEC F 88 ISAPR88 19APR88 12813 17:ss I gg CONSTRAINTS:
- 1. START WITH THE B RCP, AFTER 6 HRS SHIFT TO THE A RCP, AFTER 6 HRS SHIFT TO THE C RCP. AFTER 6 HRS SHIF T TO THE D RCP AND LEAVE IN OPERATION UNTIL THE END OF FORCED OXIDATION.
COMMENTS:
1.
IN 1984 USED 7 GALLONS OF H 28:^.
2.
IN 1986 COSALT 58 PEAK VAS 1.3 MICRO CURIES /CC.
AFTER D RCP IS RUNNING SHIFT TAPS (VR-4).
4.
198/ - COBALT 58 PEAK WAS
.7 MICROCURIES PER CC.
m O y
ge.
m 1 UNIT S/D AND COOLDOVN c_, o 13APR88 19APR88
- $ y* 5 8:
inBS
______._________._________._________._________._________.___58 W
e
______,_________._________._________._________._________._______~*Lg_g3 C
0 3 -
mn O
- O AJ hJ C3 M
03 n OD M Ow Uo m
Y
TROJAN IC88 REFUELING OUTAGE PGE - TROJA3
.eq 4 DATE 83DEC87 8958 HRS VOR K I NG SCHEDULE PROJECT START 12APR88 0wO M Q*8.
) JECT 8800TAGE nou ORIGINAL COMPL.
4JUM88 m n3 IE 2 REMOVE REACTOR HEAD SORT BREAKS E START NODES z o, 5
.______..._______._________._________._________._________._________._________._________._________._________._PAGE 1
_ _ _ _ _ _ _ _. _ __ _ _ _ _ _ _ t n
DE=O/FE DESCR I P T I ON DUR STAR T F 1 M I SH ACTIVITY i
-- > m
,______._________._________._________._________._________._________._________.__SCH'D
_______._________._________._________+-________._
M SETUP HANDRAILS 28 ISAPR88 16APR88 m
12839 7s98 4:88 COMMENTS:
,e n
- 1. AROUND CAVITY.
2.
ON UPPER CAVITY FLOOR.
- 3. AROUND HEAD.
4.
MANIP FESTON BOOM EXTENSION.
- 5. SCAFFOLD FOR CRDM DUCTING LAYDOVM.
6.
INTERFERENCE PROBLEMS IN 1987 WITH 8 RCP MOTOR INSPECTION ACCESS.
DISCONNECT T/C CONOSEALS 5
19APR88 19APR88 12868 14:38 19:38 ALARA:
- 1. ALARA SCOPE REQUIRED.
COMMENTS:
1.
PUT POLY SLEEVING AROUND CONOSEAL THIMBLE PRIOR TO INSTALLING PROTECTIVE SLEEVE.
REMOVE HEAD INSULATION 4
19APR88 28APR88 12969 19:38 8:88 ALARA:
- 1. ALARA SCOPE REQUIRED.
COMMENTS:
- 1. REQUIRES I&C SUPPORT TO DISCONNECT VIBRATION MONITOR.
- 2. UNTIE TEMP HEAD SHIELDING.
DETENSION RX HEAD 18 28APR88 28APR88 12876 7:88 17:38 CONSTRA'NTS:
m > It c "2
0
- 1. ENTER MODE 6 AT 8EGINNING OF THE 2ND PASS,
$"n0
- 2. MUST COMPLET Gb!-11.
3.
NEED TO BORATE TO REFUELING CONCENTRATION
[
e oo n PRIOR TO ENTERING MODE 6.
0 3-
"' " -. ' 'o M N @ p
%J 03 M OD M O
w ce m
Y
7--_
DE 2 REMOVE REACTOR HEAD SORT BREAKS E START NODES
_._________._________._____.___._-___......PAGE 2
tr c -4
._______..________g.o g
.E-O/FE DESCR I P T I ON DUR STAR T F I N ISH ACTIVITY e ye t.
- ______.._______..__.---.._+________.+_________.._______.+_____'D___,_____'D____,______'D___, _____'D ALARA:
___,______...,_________,_________g."3
- 1. ALARA SCOPE REQUIRED.
ui 2:
2OC ma o COMMENTS:
m, w w I.
CAUTION OPERATORS ON WHICH HOIST TO USE TO L IFT EITHER THE STUDS OR TENSIONERS.
2.
NOTE RAD COM REQUIREMENTS DUE TO POTENTIAL N
RADIATION LEVELS.
$7 3.
ENSURE PROPER INDOCTRINATION ON THE USE s
AND HAZARDS DURING THIS EVOLUTION.
(PERSONNEL INJURY IN 1984.)
REMOVE RX HEAD STUDS 18 2EAPR88 21APR88 12s81 17:38 4:88 ALARA:
- 1. ALARA SCOPE REQUIRED.
COMMENTS:
1.
IN 1987 THIS EVOLUTION EXPOSED A FUEL PELLET LODGED BETWEEN THE RX VESSEL FLANGES AND CAUSED APPROX. A TVO WEEK DELAY.
2.
IN 1987 STUD HOISTS AND STUD TENSIONER HOISTS REMOVED FOR DECON, SENT TO QUADREX.
CLEAN STUD HOLES & INSERT P(UGS 4
ZIAPR88 ZIAPR88 12088 7 88 1138g alARA:
1.
ALARA SCOPE REQUIRED.
COMMENTS:
1.
ONLY GUIDE STUD HOLES VERE CLEdNED, MEOLUBE AND INSERTS INSTALLED.
2.
IN 1987 ONE STUD PLUG LEAKED AND FLOATED TO SURFACE.
SET GUIDE STUDS 5
21APR88 21APR88 12884 11:58 16:38 COMMENTS:
1.
IN 1986 DIFFICULTY VAS EXPERIENCED IN SETTING TVO STUDS, #28 & #44.
THE STUDS VERE TAKEN TO THE MACHINE SHOP TO BE 2%[@
MACHINED DOWN.
STUD #28 WAS FOUND TO BE menn
- O C
UNDERSIZED.
STUD #44 VAS MACHINED AND INSTALLED AND A DEVIATION VAS WRITTEN TO
-. 5 - 3 N
LIF T THE HEAD VITH TWO STUDS.
2.
IN 1987 MINOR DIFFICULTY IN SETTING GUIDE o@.
STUDS - NEEDED TO JAR TOP OF STUD.
mn o
"" O N N DC r
M (D n 03 M Ow UmW M'
)
ODE 2 QEMOVE REACTOR HEAD SORT BREAKS
---_-_-_.-_-____--._________.________-.____-____.-_ --____.________E START NODES PAGE 3
_.________-._________._______-_._________._________._______e.e,rg OSE=O/FE DESCR I P T I ON DUR STAR T F IN ISH
^-_._
O ACTIVITY "g g,.
SCH'D SCH REP
________.-________.____-_---.-_-_-----. -_-----_. ____-___.____ -_-_._ REP'D-_____--.-_____'D___.______'D moe
___.-_-______.-________,__---__m_q_o IN3 TALL BOOT SEAL e
4 ZIAPR88 21APR88 ta M 12858 Zoc 16:38 28:38 N
- O ALARA:
m ta w e 6m I.
ALARA SCOPE REQUIRED.
-- > m" COMMENTS:
m I.
IN 1987 HAD TO RTV BOOT SEAL TO PREVENT POSSIBLE IRRADIATION PROBLEM TO BOOT SEAL.
g n
FOLD RAILS 2
21APR88 21APR88 12886 28:38 22:38 COMMENTS:
- 1. RAILS MUST BE MOVED TO ALLOW HEAD TO BE PLACED IN HEAD STAND.
SET UP DILLON LOAD CELL 3
21APR88 22APR88 12889 23:88 2:88 COMMENTS:
1.
NERD TO VARM UP IN ADVANCE.
ZET HEAD LIFT RIG 2
22APR88 22APR88 12888 2:88 4:88 COMMENTS:
1.
HEAD AREA IS CLEAR.
l LIFT HEAD (FLOOD CAVITY) 18 22APR88 22APR88 12898 7:88 17:38 CONSTRAINTS:
1.
SECURE REFUELING POOL SUPPLY FANS AND POLAR COOLFRS PRIOR TO LIFTING HEAD TO REDUCE BLOUING CONTAMINATION OUT OF REFUELING CAVITY.
ALARA:
- 1. ALARA SCOPE REQUIRED.
COMMENTS:
l.
CRANE OPERATOR NEEDS TO BE RESPIRATOR N > 3: U y" $8 2.
3 H RP INCREASE AT THE 93* & ABOVE w SI.' s D
VHEN FILLING THE CAVITY.
- 3. FLOODING CAVITY. LEAKS AT THE INCORE SEAL o 0) "
TABLE. NEED TO ENSURE PERSONNEL ARE AVARE O
OF & EXPECT LEAKS; KNOW HOW TO FIX THEM &
m"'
n W O NN@ U 4.j.
p
%e 03 n UD M Ow Uc m
X
)E 2 REMOVE CEACTO2 HEAD SORT B3EAKS E START CSDES
_______._________._________._________._________._________._________._________._________._________._________._PAGE 4
r* C *4
_ _ _ _ _ _ _ _. _ __ _ _ _ _ _g.g ;
)E=O/FE DESCR I PT ION DUR START F I NISH ACTIVITY SCH REP *D SCH REP 3 8
- o x L.
.______._________._________._________._________._________.______'D___._________.______'O___.______'D a
VHAT THE ACCEPTABLE LEAK RATE IS.
___._________._________.________g.c vi 2
- 4. FOUR HOURS BEFORE LIFTING THE HEAD. THE 2OC VALVE LINEUP SHOULD BE COMPLETE-2 b O-5.
INSPECT INNER O-RING TO DETERMINE IF A I
- 8 LEAKAGE PROBLEM EXISTS.
6.
IN 1986 HAD A BALANCING ERROR PROBLEM.
7.
IN 1986 THE HEAD VAS PREVENTED FROM
'8 ENTFRING THE STAND FOR TVO REASONS:
A.
THE VEST STUD HOIST INTERFERED VITH
[
THE VENTILATION DUCT VOR K.
IT VAS 3"
NECESSARY TO ROTATE THE HOIST TO THE MOST SOUTHERN POSITION.
B.
THE EQUIPMENT RAILS VERE NOT STORED FAR ENOUGH FROM THE PATH OF THE VESSEL HEAD AND IT BECAME NECESSARY TO RAISE THE HEAD HIGHER THAN 2'8" TO CLEAR RAILS (APPROX 3*).
- 8. HOLD HEAD AT 3' LEVEL UNTIL CAVITY FLOODING STARTS.
9.
DUE TO HIGP CONTAMINATION PROBLEMS IN 1987.
A TENT VAS BUIL T AROUND THE HEAD IN THE STAND.
THE HEAD VAS DECONNED WITH VACUUM AND VIPE DOVN.
A SPECIAL RP PROCEDURE VAS USED.
- 18. 1987 - STUD HOISTS AND STUD TENSIONER HOIST HAD TO BE REINSTALLED., MINOR PROBLEMS VITH ONE AFTER INSTALLATION.
UNLATCH CRDM*S 18 22APR88 23APR88 i
1209I 17:38 4:88 ALARA:
I. ALARA SCOPE REQUIRED.
COMMENTS:
I.
TOOL NEEDS TO BE OPERATIONALLY CHECKED PRIOR TO THIS POINT TO PREVENT DELAYS.
2.
IN 1987 DELAYED DUE TO SOURCE RANGE PICT
& N-3I INTERFERENCE PROBLEMS (SPIKING).
3.
IN 1987 LOST 4 HOURS DUE TO I&C SWAPPING N-CHANNEL TO SPARE SOURCE RANCE DETECTOR.
SET UPPER INTERNALS LIFT RIG 6
23APR88 23APR88 2N[E 12892 7:88 13:38 mnM o omn c COMMENTS:
I. LIF T RIC VILL PROBABLY BE REQUIRED TO BE o
3 FLOATED.
1 O
3*
mn O
>= 0 h3 k3 D U N
OD n os M OW C2 m
m Y
_om g
1 i
i l
4 GE 2 REMOVE REACTCC HEAD SORT BREAKS E STA
__-._--.------__.-_--__---.---___-__.--__-__--.--______.-__-_____._RTN00ES PAGE 5
[
DE=O/FE DESCR I P T I ON DUR START F I N ISH m pr Lae ACTIVITY SCH*D R
SCH REP'D
_______._________.----__-__.-________.--_______._________.________..__EP'D_______.___--_'D___._--__...._________
s._
Um Z l
PULL UPPER INTERNALS 4
23APR88 23APR88 Zoc 12893 ns O
i 13:35 17:38 "e2 'w*** l a
ALARA:
i
-ne
- 1. ALARA SCOPE REOUIRED.
M-l
.--____.--_-_____._-__--.-.__-__--_...___--__.--_______.-_-__----.--_-_____.._______.--_______.____..-_.____---__.___-_-___._n, 2 REMOVE REACTOR HEAD 15APR88 23APR88 s.
m 7s95
______.,_____-...--------_.__-_--___.---_-____.---._____...___-___ _________.._17:38_____-.-_______.._---_____._'_--____.______
i 1
l 1
i i
i l
i I
i DO M Z U mnN O i
@3 M M O j
b O C 1
O' O
>- - WB 0
(M
>d 3
i e OD n O s=
mn O
- O i
h3 Nc3 j
Fe j
eo M
i PP l
i i
o TROJAO 1988 REFUELING OUTAGE PGE - TROJAM CATE 83DEC87 395sHRS VOR K I N C SCHEDUL E PROJECT START 12APR88
[E JECT 880UTAGE nnO ORIGINAL COMPl.
4JUN88
- [ I7 I
3 UNLOAD CORE SORT BREAKS E START NODES I
- m ns
______._________._________._________._________._________._________._________._________._________._________._PAGE_ _ _ _ _ _ _ _. _ __ _ _ _ _ _
!=O/FE DESCR I P T I ON DUR STAR T F IN ISH ma n ACTIVITY SCH REP SCH REP yy
______._________._________._________._________._________.______'D___._____'D____.______'D___.______'D___._________._________.____
n IUEL UNLOAD 88 23APR88 27APR88 12895 17:38 17:38 m
s m
CONSTRAINTS:
S' 1.
DUR ING F UEL MOVEMENT, CNTMT PURCE EXHAUST MUST BE SECURED IF S/D (285 HOURS.
ALARA:
- 1. ALARA SCOPE REQUIRED.
COMMENTS:
1.
IN 1984 HAD TO POT BOTH SFP COOLING PUMPS AND ROTH SFP HX IN SERVICE TO MAINTAIN SFP TEMP <l25 DEG F DUE TO LENGTH OF TIME FROM S/D TO FUEL MOVEMENT (33 DAYS).
3 UNLOAD CORE 23APR88 27APR88 17:35 17:38 9
b M mO W1 nM n O N O C D
3' B O
Q%
>d Q
o 03 M O
3=
i mn O
>= 0 h) h3 M3 U j
mJ 03 M
\\
03 M Ow Oo m
Y
TROJA2 19;8 REFUELING CUTAGE PCE _ TROJAJ ID DATE 03DEC87 0550 HRS VOR K I NG SCHEDUL E PROJECT START 12APR88 E' O H
>6 0, M OJECT 8800TAGE nno ORIGINAL COMPL.
4JUN88 v o 'm -
ow~
'D E 4 PELLET RETRIEVAL SORT BREAKS m oa
_______._________._________._________._________._________._______E START NODES PAGE 1
g:
DE=O/FE DESCR IP TION DUR STAR T F IN ISH ACTIVITY ma n SCH REP SCH*D REP
_______._________._________._________._________._________.______'D___._____'D____._________.______'D m La **
___._________._________.________t.g g FUEL PELLET RETRIEVAL I48 27APR88 4MAY88 n
12821 17:38 17:38 y
s.
CONSTRAINTS:
m 3
- 1. POTENTIAL JOBS THAT VILL DELAY DRAINING THE RCS TO CENTERLINE AKE:
A. ADDITICM OF AN RCP SEAL INSPECTION.
PRESENTLY ONLY "B & D-RCP'S ARE TO BE INSPECTED. WITH THE POSSIBILITY OF ADDING
- A" RCP.
COMMENTS:
1.
THIS EVQLUTION WILL ENTAIL VACUUMING OF THE CORE BARREL. BOTTOM OF THE REACTOR VESSEL. DISLODGE / REMOVAL OF FUEL PELLETS (LOVER CORE BARREL) AND REMOVAL /
RE-INSTALLATION OF THE CORE BARREL.
4 PELLET 7ETRIEVAL 27APR88 4MAY88 17:38
_______.________-._________._________._________._________._________._________.___17:38
- d > Z U N n mo 04 M M n omnc n
D' D
- w. 7 e
%s B w* 3 o 03 e O
3=
Mt n O
- w. O rd NNo3
%J 03 M 03 M Ow O'
o Mp
TROJAN 1988 REFUELIEG OUTAGE FGE - TR2JA?,
G CATE S3DEC87 595SHRS VOR K I NG SCHEDUL E PROJECT START 12APR88 FUH
$ $. "f.
3 JECT 88 OUTAGE e wL ORIGINAL COMPL.
4JUN88 3 *
- M nv
)E 5 RELOAD CORE SORT BREAKS E STA Q
_______._________._________._________._________._________._________.__RT NODES PAGE 1
mZ
_______._________._________._________._________.________zpgg
)E=O/FE DESCR I PT I ON DUR STAR T
F 1 M I SH ACTIVITV mws SCH REP SCH REP 8
_._____._________._________._________._________._________.______'D___._____'D____.______'D___.______'D
___._________._________.________r.f 2
RELOAD FUEL 88 4MAY88 SMAY88 N
12897 17:38 17:38
$f TV MAP OF NEWLY LOADED FUEL 4
9MAY88 SMAY88 3
12181 17:38 21:35 INSTALL UPPER INTERNALS 3
8MAY88 9MAY88 12182 21:38 1:gg 1
- 1. ALARA SCOPE REQUIRED.
COMMENTS:
1.
1987 - MAD TO WAIT FOR QA SIGNOFF.
LATCH AND DRAG TEST RCCA*S 8
9MAY88 9MAY88 12183 7:88 15:38 ALARA:
- 1. ALARA SCOPE REQUIRED..
COMMENTS:
1.
PERFORM VALVE LINEUP FOR LOVERING CAVITY VATER LEVEL.
~
5 RELOAD CORE AMAY88 9MAY88 17:38
_______._________._________._________._________._________._________._________.___15:38 T>ZU eom O
$3 o M O O mO C O DF 9 y
O w=
OD B >= 3 m 03 n O
D=
mn O
wO N) N) @ U q
mn 03 M Ow Ue M
X
TROJAN 1988 REFUELI.iG OUTAGE PGE - TROJA3 N CATE 83DEC87 8958 HRS WOR K I NG SCHEDULE PROJECT START 12APR88 C E, OJECT 880UTAGE nn o ORIGINAL COMPL.
4JUN88
$. $f )7 DE 6 INSTALL REACTOR HEAD SORT BREAKS E START N
-a
.______.______.__._________._________+_________ _________ _________,______ ODES PAGE 1
8' o 2
___._________.________.._________,_________.________ypo,e OE=O/FE DESCR I P T I ON DUR STAR T F 1 N ISH "3
]8 y
_______._________._________._________._________._________.______'D___._____'D____.______'D___.______'D___
.n VACUUM RX FLANGE & FUEL PATH 48 9 MAYS 8 11MAY88 12159 16:88 16:58 ns H
Q DRAIN REFUELING CAVITY 12 IIMAY88 12MAY88 12187 16:38 8:88 n
CONSTRAINTS:
1.
PRIOR TO DRAIM DOWN. NEED HOSES STAGED TO BLOW OUT SFP CAVITY PURIF RETURN LINE &
CAVITY SKIMMER LINES TO SUPPORT LLRT TEST.
COMMENTS:
1.
DRAIN RCS TO CENTERLINE IN PREPARATION FOR S/G EDDY CURRENT ACTIVITIES.
- 2. WASH DOWN WALLS AS LEVEL IS LOWERED.
3.
MONITOR SFP DOOR FOR LEAKAGE AS LEVEL IS LOWERED.
- 4. REDUCE SFP/ CAVITY TO MINIMUM PRIOR TO CLOSING DOOR.
5.
DIVENT LETOOWN TO RWST WHILE PUMPING DOWN UPPER CAVITY & DRAINING TO CENTERLINE.
6.
DRAIN LOWER CAVITY.
7.
IF ACTIVITY IS HICH. PUMP LOWER CAVITY TO HUTS VIA RHR & DEMINS THEN 1RANSFER HUT TO RVST.
8.
DRAIN TRANSFER CANAL.
- 9. LlHE UP SFP PURIF TO DRAIN LOVER CAVITY, NEED LEVEL
~1' BELOW UPPER CAVITY FLOOR TO SET REACTOR HEAD.
- 11. DRAIN RX VESSEL FROM FLANGE TO CL
,, HRS.
REMOVE & STORE HEAD LIFT RIG 4
12 MAYS 8 12MAY88 12188 8:35 12:80 COMMENTS:
- 1. REMOVE SPARE O-RINGS PRIOR TO STORING LIFT RIG.
ns > z e N N N O wa e n n IOSTALL RX HEAD TENT 2
12MAY88 12MAY88 n 75 oeoc 12199 12:85 14:8s 5 @~ ~ $
ALARA:
o 03 n O
3*
- 1. ALARA SCOPE REQUIRED.
mn n
- O NN D3
%J 03 m OD M O
w Uo m
PC'
CE 6 INSTALL REACTOR HEAD SORT EREA E START NODES
_______._________._________._________.____.____._________.___".S_____._________._________._________._________
2
[ 0 ;f PAC iDE=O/FE DESCR I PTI ON DUR STAR T F 1 N ISH
_____.________n.n.o ACTIVITY m M 'a
_______._________._________._________.____. ___._________.___CH'D______._____'D____.______'D___.______'O.__
S REP SCH REP CAVITY DECOM vi 2 78 12MAY88 15MAY88
$?5 12118 14:88 28:88 N, 04.W ALARA:
w>b
- 1. ALARA SCOPE REQUIRED.
M COMMENTS:
m w
- 1. WHEN DECONNING LOVER CAVITY. DECON UPPER m
INTERNALS LIFT RIC AND VACUUM.
D y
- 2. MAKE SURE DIESEL FUEL IS AVAILABLE FOR HMS PUMP.
3.
NOTIFY SECURITY SEFORE OPENING TOOL PASS.
4.
MANIPULATOR CRANE OPERATOR IS REQUIRED INTERMITTENTLY SY THE CAVITY DECON CREV.
REMOVE RX HEAD TENT 2
15MAY88 15MAY88 12118 28t88 22:58 REMOVE CUIDE STUDS 2
15MAY88 16MAYB8 12117 22:88 8:88 REMOVE STUD HOLE PLUGS 5
16MAY88 16MAY88 12119 8288 5:88 COMMENTS:
1.
IN 1987 PRECAUTIONARY' DELAYS DUE TO RADCOM MEASURES TO REDUCE PERSONNEL EXPOSURES &
CONTAMINATION DURING REMOVAL & SURVEYS OF PLUGS. IT WAS FOUND THAT SOME PLUGS HAD EXTREME CONTAMINATION AND DOSE RATES.
CLEAN AND LU8E STUD HOLES 5
16MAY88 16MAY88 12128 7:88 12:58 ALARA:
1.
ALARA SCOPE REQUIRED.
COMMENTS:
1.
IN 1986 PUMPS DID NOT WORK. VATER IN HOLES REMOVED VITH RACS THIS TIME; ALSO INCLUDES OC INSPECTION.
STiCE RX HEAD STUDS m>IO 4
16MAY88 16MAY88 A n mO 12113 M
"M n
12:38 16:38 n3a SET RX HEAD STUDS hJ g"3c 8
16MAY88 17MAY88 O"
12121 16:38 1:58 o s." "
mn a
w O ha hJ c3 M
00 M 03 M Ow Oo m
X
DE 6 INSTALL R EAC TOR. HEAD SORT BREAKS E
.______._,_______._________._________._________._________._________ START EODES._________._________.____
3 JE=O/FE DESCR IP T I ON DUR STAR T F IM ISH ACTIVITY nn o SCH REP *D SCH REP D
._____.._________._________._-_______._________.__-______.______'O___._________.______'D___.______'___._________._____
RU3 IN RX HEAD STUDS O
5 16MAY88 17MAY88 z$[
12123 18:38 s ss m e o ALARA:
m t.> >=
- 1. ALARA SCOPE REOUIRED.
- d. $ $n COMMENTS:
m
- 1. PtaOR TO TENS!ONING. INSPECT FLANGE AREA we FOR ANY OBSTRUCTIONS.
,e U
- 2. ACCOGMT FOR ALL METAL PLATES USED FOR n
HOLDING STUDS.
LOVER STUD TENSIudERS TO FLANGE AREA 4
17MAY88 17MAY88 4
12122 5:88 4:38 TE SION RX HEAD STUDS 28 17 MAYA 8 18MAY88 12125 7:88 4:ss ALARA:
- 1. ALARA SCOPE REQUIRED.
COMMENTS:
1.
EhTER MODE 5 VHEN FIRST PASS IS CGMPLETED.
2.
DIAL INDICATORS MUST BE ZEROED PROPERLY.
3.
IN 1984 HAD PROBLEMS WITH #16 TENSIONER.
WAS NOT SQUARE ON FLANCE.
4.
IN 1985, a3 TENSIONER HYDRAULIC FITTING WAS LOOSE CAUSING PARTIAL TENSIONING.
5.
IN 1986 I STUD TENSIONER FAILED. FIRST ON RELIEF & THEN TENSIONER FAILURE.
INSTALL RX HEAD INSULATION 3
18MAY88 18MAY88 12128 7:ss 13:gg ALARA:
- 1. ALARA SCOPE REQUIRED.
COMMENTS:
- 1. CONTACT ISC PRIOR TO INSTALLING MIRROR INSULATION.
2.
INSTRUMENTATION CONNECTION REQUIRED B,Y I&C.
3.
TIE-UP TEMPORARY HEAD SHIELDING.
m>Zc IESTALL INSTRUMENT CONOSEALS 6
18 MAYA 8 18MAY88
$"NO k nk O i
12133 18:88 16:3g n =r a 1
ALARA:
Mw o
-- @ >. 3 1.
ALARA SCOPE REQUIRED.
e 00 n O 3=
i mn O
I
- O M MD3
%J 03 0 OD M O
He l
Cm M
PC" l
E 6 INSTALL REACTOR HEAD SORT BREAKS E START NODES PAGE 4
geg o,,
E-O/FE DESCR I P T I ON DUR START F 1 N ISH nn o ACTIVITY SCH REP SCH REP
______._________.__-______._________._________._________.______'D___._____'D____.______'D___.______'D_
COMMENTS:
1.
TRAIN REFUELING CREV ON CONOSEALS.
z$[
2.
IN 1986. IT VAS NECESSARY TO REMOVE ns io SHROUDING TO GET #4 & #6 CLAMPS INSTALLED.
]3 y $'
->u REMOVE TEMPORARY LEAD SHIELDING 4
18MAY88 18MAY88 12133 16:38 28:38 ms e-*
- 1. ALARA SCOPE REQUIRED.
n" COMMENTS:
1.
FOLD TEMP SHIELDING TO REDUCE EXPOSURE DURING CONOSEAL & NEUTRON BASKET INSTALLATION.
REMOVE SANDBOX & NIS COVERS 6
18MAY88 19MAY88 12132 28:38 3:88 ALARA:
- 1. ALARA SCOPr REQUIRED.
INSTALL NEUTRON SHIELDING 8ASKETS 18 19MAY88 19MAY88 12131 7:58 17:38 COMMChTO:
1, EM 1987 DID MOT HAVE $UFrICIENT WATER BAGS IN VAREHOUSE - HAD TO PATCH. LONG LEAD TIME INSTALL CROM VENT DUCTING 12 19MAY88 28MAY88 12137 15:38 4:88 ALARA:
- 1. AtARA SCOPE REQUIRED.
COMMENTS:
1.
IN 1986 HEAD HOIST FAILED TO OPERATE.
LOST 6 HOURS.
CO2:ECT CRDM CABLES 18 28MAY88 28MAY88 12148 7:88 17:38 CONNECT T/C CABLES 7
28MAY88 21MAY88 ns>zo 12141 17:38 1:88 m
m o m"n n
n CLOSE QUT CAVITY 7
21MAY88 21MAY88 omoc o ss 12145 7s#8 14:38
((
O oo n REMOVE HANDRAILING 4
21MAY88 21MAY88 0
3-12139 14:38 18:38 N Nc3 wa OD n ao M O
e--
Uo m
PC*
4E 6 l4 STALL REACTOR HEAD SORT SREAKS E STA
_______.______'___._________._________._________._________._________.-_RT NODES PAGE 5-r*, o -a
-______._________._________._________._________.________g.R3 DE-O/FE DESCR IP T ION DUR STAR T
F 1M ISH ACTIVITY e#L SCH REP SCH
_______._________._________.---_-____.___ ___.. _______...-_____'D_...__.-_'D-__..______'D REP *D 3 *
- ___ _________ _________._________.__.____g 7 3 SET OUTER MISSILE SHIELDING 4
2IMAY88 21MAY88 ui 2:
12142
$?$
18:38 22:38 mww SET CENTER MISSILE SHIELD e oe 4
ZIMAY88 22MA'Y88 12143 23s88 3:88 m
CO NECT CRDM VENT MOTORS 5
22MAY88 22MAY88
$7 12144 7:88 12:88 3n COMMENTS:
1.
NEED TO CHECK MOTOR ROTATION.
6 INSTALL REACTOR HEAD 9MAY88 22MAY88 i
16a88
_______._________._________._________._________.-________._________._________.___12:58 O n m O
@Q nM n O b O C n
D* B
>> 7 e
wB
>3 3 _OD n m
Omn O
w0 h) N) @ 3 w
a) n 03 M Ow eo m
X
- ~
TROJAN 19 8 REFUELICG OUTAGE PCE - T22JAN p,n g 4 CATE 83DEC87 8958MRS WOR K I NG SCHEDUL E PROJECT START 12APR88 nron n. o, m
IJECT 88 OUTAGE ORIGINAL COMPL.
4JUM88 5o$
E 7 RCS RECOVERY SORT BREAKS E START N o
.---------.---------.---------.---------.---------.---------.----- ODES---...-------.------------------.---------.-------,z,o"5 PAGE I
E=O/FE DESCR I PTION DUR STAR T F I N I SH
,o ACTIVITY 32 g y SCH*D REP'
--.--... --............--.---------.---------.---------.---------.---- D SCH'D REP *D
-om
.---------.---------....------.---------.---------.- n RESTORE VALVE LINEUPS FOR FILL & VENT 24 28MAY88 21MAY88 m
12147 28:88 28r88
- p FILL & VENT RCS 24 21MAY88 22MAY88 n
12I48 26sB8 28t88 CONSTRAINTS:
- 1. REACTOR HEAD VENT INSTALLED & STANDPIPE ISOLATED.
- 2. AREAS AROUND RCP*S MUST BE CLEANED.
3.
IT TAKES 27.618 GALLONS TO FILL FROM CENTERLINE TO 88% IN PRESSURIZER.
4 MUST HAVE 4 BOLTS ON ALL S/G MANVAYS PRIOR TO STARTING FILL.
- 5. MUST HAVE ALL BOLTS TOROUED ON ALL PRIMARY HANUAYS PRIOR TO GOING SOLID.
- 6. SEAL INJECTION & SEAL RETURN MUST BE ESTABLISHED PRIOR TO FILL & VENT OF RCS.
- 7. CHECKOUT THE S/G T/C INSTRUMENTATION.
- 8. OI-3-1 APPENDIX A&B L/U*S COMPLETED.
9.
NOTIFY RAD CON AND MAINT TO LOOK FOR LEAKS WHEN SOLID.
COMMENTS:
I.
PROBLEMS IN 1986:
A. VHEN PRESSURIZING RCS 8864A.(A PRZR SAFETY LOOP SEAL DRAIN VLV) VAS FOUND TO HAVE A LEAKING DIAPHRAGM.
(LOST 18 HOURS)
- 8. D RCP - #3 SEAL VAS NOT SEATED. BUMP STARTED & #3 SEAL LEAKOFF VENT TO 8.
D RCP - UPPER OIL RESERVOIR PIPING.
FOUND A CRACK IN PIPE NEAR LIFT PUMP RELIEF VALVE.
C. LETDOVN MANUAL ISOL VALVE 8885 - HAD TO BACKSEA~.' & REPACK.
m > :I c D2AV BUBBLE on u o 18 22MAY88 23MAY88
$"N$
12158 28sS8 6sS8 n ya CONSTRAINTS:
ww a
- U 1.
BEFORE DRAVING BUBBLE - NEED TO INCREASE RCS TEMPERATURE TO ENSURE DELTA T LIMIT od-O ACROSS PRZR SPRAY NOZZLE OF 328 DEG F IS
~
Nwop
,<y ;
c' M
n O
e-*
Um m
X h
o 3DE 7 OCS RECCVERY
.._-___,-_-_......._______-._____-___.___-_-_-_.. SORT Br:EAKS E START NODES
=..______.... -___-__.__.--_.,CEE N PAGE 2
)DE=O/FE DESCR I PT I ON DUR START F 1N ISH
@ 4y om r
ACTIVITY
.__.-__-+.....---
_-__--_-_s-_.--_--_+-________,--_-_-.
.s__SCH'D.._-_-_e_.-__'D____+.____-___,______'D REP SCH'D REP m n3 NOT EXCEEDED.
___+.________,____.-__-,________jr.ui 2 COLD ROD DROPS 2oc 18 23MAY88 23MAY88 ns e O 12151
]8 y 7 7:88 17s38
-- > a CONSTRAINTS:
n I. VERIFY PRIOR TO THE SCHEDULED START TIMES A. M/G SETS AVAILAELE W
8.
RP3 ENERGIZED C. CRDM VENTILATION 3
n D. CHILLERS IN SERVICE AND FILLED E. PICT 18-1 F.
PICT 16-2 G.
PICT Il-2 1
H.
PICT 11-3 POT 12-2 24 24MAY88 25 HAY 88 IZ'%2 7s#4 7 sag HEATUP TO 348 DEC F FOR TPT-175 7
27MAY88 28MAYD8 12293 21:3g angg
)
HEATUP TO 557 DEG F FOR TPT-175 8
28MAY88 28MAY88 I2296 toss 12:58 POT l-1 (RCS (INTEGRITY TEST) 12 28MAY88 29MAY88 82168
_-_.,_________.12 95
..._____-.-_.-----_-_-+ _-.___..,__-- -___+2MsBB WsB8
_ _ _ _ - _ _ _. +. _ _ _ _ _ -. _, _ _ _ _ _ _ _ _ _, _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ -,........, _ _ _ _ _ _..., _
.1 n1 > 2 O mn mo 7l nM O eeO C O
3* 9 M7 m
Ut U ** 3 m OD n O
3*
mn O
wo NNc3
%J 00 n
- s 03 M Ow cem.
PC*
TOOJA2 1928 REFUELIEC CUTAGE 0
PCE - TOOJAJ r* g *"l FATE S3DEC87 295SHRS VOR K I NC SCHEDULE PROJECT START 12APR88
$ n $~-
ECT 8800TAGE (
aw ORIGINAL COAPL.
4JUN88 3
- 8 LOW POVER PHYSICS TEST SORT BREAKS E START NO
_____._________.______.__._________._________._________._________._______ DES PAGE I
v 2:
__._________._________._________._________._________;g7g
=O/FE DESCR IPT1ON DUR START F 1hISH ACTivlTY NwH SCH*D REP
- SCH*D REP *D
_____._________._________._________._________._________._____O____._________._________._________._______
OV POVER PHYSICS TESTING 36 29MAY88 35MAY88 T
12164 8:#8 12:88 r
m 3
COZSTRAINTS:
1.
PHYSICS TESTING NUCLEAR DESIGN DATA.
- 2. POT 1-1 COMPLETE.
3.
HOT ROD DROPS COMPLETE.
LOMMENTS:
1.
IT TAKES APPROX 1 SHIFT TO REDUCE &
REVIEV DATA.
2.
PERFORM OVERSPEED TEST & COUPLE BOTH MFP*S DURING 3% FLUX MAP.
- 3. NEED 6.885 CALS OF BORIC ACID AVAILABLE IF ROD VORTHS ARE LOV THIS IS (36 HRS.
8 LOV POVER PHYSICS TEST 29MAY88 38MAY88 BsSW
_____._________._________._________._________._________._________._________.___g2sag e
4
- U > 3' O meuo
% M M O
@ N nC O
3* B ha 7 o
04 B >= 3 O 03 "
O 3=
Mi n C)
>. o h) h) @ 3 e
Y
- 0) e OD M Ow O
m m
X
TROJAN 1938 REFUELIEC OUTAGE PGE - TKOJAJ O
DATE 83DEC87 8958 HRS VOR K I NC SCHE.DULE PROJECT START 12APR88 r* w v.
r6
.n n ORIGINAL COMPL.
4JUM88 m x IECT 8800TAGE 3 oa 9 TURBINE TEST / POVER ESCALATION SORT BREAKS E START NODES PAGE 1
.-- --- -.....------.---------.....-- --.---------.---------.---------.---------.---------+- -------+---------.---------.,,x
- =O/FE DESCR I P T I ON DUR STAR T F IN ISH
%s w w
.--_--+-----_---+-_ ------+---------+ _--- -- ---- ----+---------+---------+---------+---------+-
+---------+---------gs>
e ACTIVITY c~ m M
IECUPE EMEPG BRG O!L PP FOR POT 2
3BHAY88 38MAY88 N
12 88 14:58
-w 12187 m
3 NOT 18-4 MN TUPC ANNUAL OPERATING TEST 18 38MAY88 31MAY88 14sBB Gs#8 I22D8 ND OF 1988 REFUELING OUTAGE 8
EVENT 31MAY88 8888 12999 POVER ESCALATION 96 31MAY88 4.10N 88
- sD8 8:08 12167 CONSTRAINTS:
- 1. GOI PHEPEOUISITES MUST BE COMPLETE.
COMMENTS:
- 1. THE MARGIN EETWEEN P-lh & IR TRIP SETPOINT IS PEDUCED DUE TO NIS RECALIBRATION FOR LOV LEAVAGE LOADING PATTERN.
- 2. CLOSELY MONITOR 1R HI ] RIP SETPOINT DURING INITIAL S/U.
+---------+---------+---------+---------+-
,---------+---------+---------+---------+---------+---------+---------+--4JUN88 9 TUPBINE TEST / POWER ESCALATION 3BMAY88 12:08 Bs98
+----- ---+---------+---------+----- ---+---------s------
--+---------+---------+---------+---------+---------+---------+-
'w > % c If N mO m3 ? M n O J h C O
3" B N 3*
m
%J B >* 3 4
o 00 N O 3
=
mN O
pa O M N T) 3
%8 00 N OD M ' i O-W De m
PC* '
.