ML20148J184

From kanterella
Jump to navigation Jump to search
Amend 11 to License DPR-3,including Change 116 to Tech Specs,Re Addition of New Section F, Rod Drop Time & Authorization of Control Rod Surveillance Program Per Changes 104 & 106
ML20148J184
Person / Time
Site: Yankee Rowe
Issue date: 05/28/1975
From: Anthony Giambusso
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20148J180 List:
References
NUDOCS 8011210254
Download: ML20148J184 (7)


Text

'(=~

(._.-

3

_,_?3.jg.

u.

~-

- l9%

x u.

n;:,

1' g

3;

~

+

==g YANKEE A1MIC ELECTRIC COMPANY ~

DOCKET N0'. 50-29'~

=. _

~

YANKEE ATOMIC POWER' STATION (YANKEE-ROWE)

AMENDMENT *ID FACILITY OPERATING LICENSE p

fi Amendment No. 65

~

License No. DPR-3 1.

The Nuclear' Regulatory Comaiksion (the Commaission) has found that:-

A.

De application for amendment by Yankee Atomic Electric Company j

(the licensee) dated February 18, 1975, complies with the a

standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regula-tions set forth in 10 CFR Chapter I;

..:3

.......b

~

De facility will operate in conformity with the application, B.

the provisions of the Act, and the rules and regulations of '

the Commission;

=m

.l'.h C.

Dere is reasonable assurance (i) that the activities authorized 9

by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities

ij will be conducted in compliance with the Commission's regula-tions; and 1.

9 D.

The issuance'of this amendment will not be inimical to the j.2 common defense and security or to the health and safety of r;

the public.

j 2.

Accordingly, the license is amended by a change to the Technical Specifications as indicated in the attachment to this license a

amendment and Paragraph 3.A.(2) of Facility License No. DPR-3 is hereby amended to read as follows:

H orrice

  • I SU.NAME>

DATE >

U UU'

=.

Forn ATC.)l0 (Rev. P 53) AECM 0240 W u. a. oOVERNMENT PRINTING OFFICE 31974 536 9 DG

,/

=.==

rra

=:

[=

m.....

EiiE:. e' 2-

.=

"(2) Technical Specifications _

'dte Technical Specifications contained in Appendix A, as revised, are hereby incorporated in the license.

The licensee shall operate the facility in accordance.

..=====

with the Technical Specifications, as revised by issued' changes thereto through Change No. 288."

E l.

Iil 3.

Tnis license amendment is effective as of the date of its issuance.

POR THE NUCLEAR REGULATORY C0lef1SSION g

71

=

s\\tSb A. Giambusso, Director Division of Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

glg Change No. JEB to the Thehnical Specifications Date of IssuanceNAY Z 81975 e

e.

.'[<

k.

~

5 E...

?!!.

L::

- 0.

orric s 7 sunNA Me M

.7 D Ave >

ron. Arc.us <an, p.sn Ascu 024o

  • u. 2.ovsnauswr enmvm. orrica i.u. u...

[..

I C=

(...

.==

=

\\\\

ATTACHMENT TO LICENSE AbENDMENT NO. M

ggg.g CHANGE NO. h TO THE TECHNICAL SPECIFICATIONS

~

FACILITY OPERATING LICENSE NO. DPR-18 E5 DOCKET NO. 50-29 Revise Appendix A as follows:

Add Section F, page 19.

!::i p=.

O a

g i

e e

- ly o

(-

I

=an'

'"*?? :

~

F.

ROD DROP TIME

' ??'

LIMITIMG CONDITION FOR OPEPATION

. 5?

  1. ":isii; The individual control rod drop times shall be < 2.50

=:

seconds from loss of stationary gripper coil voltage

.g.

~'

to 6 inch co n entry with:

a.

T

> 511 F and; avg -

e bi:

b.

all reactor coolant pump"s operating.

j;I.

r APPLICABILITY:

llot Standby.

f..( :jjl=

l0).36 ACTION:

g.....,

a.

With the drop time of any rod determined to

!!E w exceed the above limit, restore the drop time to E

within the above limit prior to proceeding to ctartup or power operation.

b.

W1'th the rod drop times within limits but determined

3a with 3 reactor coolant purps operating, operation may proceed provided therr.a1 power is restricted to

. = =,

I Yl

< 75 percent of rated thermal power.

SURVEILL?.MCC F2QUIFr!ENTS.

i.;.

I The rod irop time of control rods shall be demonstrated through measurement prior to reactor criticality:

a.

for all rods following each renoval of the reactor vessel head; b.

for specifically affected individual rods following any maintenance on or modification to the rod drive F

system which could affect the drop time of those

[

specific rods, and;

[

c.

at Icast once per 18 rnonths.

e e

.s e 4

MAY 2 81975

'a'i

.