ML20148H986

From kanterella
Jump to navigation Jump to search
Approves 731212 Request for Exemption from Specific Testing Requirements of 10CFR50,App J
ML20148H986
Person / Time
Site: Yankee Rowe
Issue date: 01/14/1974
From: Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
To: Heider L
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20148H982 List:
References
NUDOCS 8011200228
Download: ML20148H986 (1)


Text

_... _ _.. _

g..,;g.

g;~4 myr v., y,.

- -+

,,,,;~

gC 6, h,'

C y;E :

'l " '

h

~

W DISTRIB ION k.a x x : L ; w a..na. w...

-.., _..:.: x DocketJ tle AEC PDR RP Reading Branch Reading d4$ ] f g

DJSkovholt, L:0R Docket No. 50-29 TJCarter, L:0R r,

RJSchemel, L:0RB#1 h

DElliott, L:0RB#1 MSKaufman, OGC Tankee Atomic Electric Company SVarga, L:RP ATTE:

L. M. Heider ACRS (16)

Manager of Operations R0 (3) 20 Turnpike Reed ABurger, L:0RB#1 j

veathere, Wa===*h==aets101541 SATeets, L:0RB#1 Gentlemmat By letter dated n====har 12, 1973, yee requested exemptica from the specific testing requirements of Appendix J to 10 CFR Part 50 for two Type B penetrations. Specifically, you regeested an exemption from Section III.D.2 which requires leak tasting of reactor containment air lacks after each use and an esemption from the Type B testing requirements for the vapor mant=4==r equipemot hatek. You propose that the contimmees leak mesitorias system now in operatica is capa-bis of determining whom con *=4====e integrity has been violated and is, therefore, en effective embetitute to the above specific require-3 meats.

We have reviewed your description of the continuous leak monitoring system and yoor evaluation of the system sensitivities.. We concur in your proposal that your procedure incorporating the continuous leak monitoring system is an acceptable alternative to testing of the perma =aal air lock aftar each use and local testing of the equip-meet batch. Your leak test program should incorporate all applicable provisions of Appeedia J ef 10 CFR Fort 50, including periodic tests intended to===re the oestaissent overall lategrated la= hate rate and the g

-1 air lack leen1 Isakage rate.

. y. 4.

Therefore, we find that year leak test program, imeloding the continuous leak maaitorias pystem and all applicable provisions of Appendix J of 10 CFR Fart 50 effectively acaemplishes the intent of Appendix J of 10 CFR Part 50 and that there is reaseeable assurance that the health and safety of the publia will meg be endangered by use of this program.

&b)',;

9 81aserely, yn

~o Original signed by 3

4 n.w, Dm* '

c'- ~' s *

-~-

Q9 -

Donald J. Skovbolt

~

Assistaat Director for Operating Ranetors

.D4 w to (t

$f iconoine Ih L:0RJ#1 L:0RB#1 LtQ I

L1OR onic a,

IN'o'tt:dc SAT RJSkWemel pJ3g yholt.,,,,_

y.,,,.

.u..,

1/9/74 1/.,f/74 ILS./]4 1LQ/M...,

1/f// 7 4 _,.,,,....

o m,.

Form AEC.318 (Rar,9 3)) AICM 0240 opo c as is s e 4as.: s ao. sed an.~.

.