Forwards Safety Evaluation Accepting Present Penetration Seals,Per Util 871208 Submittal of Info & Evaluation to Resolve Item a of Insp Rept 50-293/87-39.W/o Encl
ML20148H343
Person / Time
Site: Pilgrim
Issue date: 03/24/1988
From: Mcdonald D
Office of Nuclear Reactor Regulation
To: Bird R
BOSTON EDISON CO.
References
TAC-66913, NUDOCS 8803290403
Download: ML20148H343 (2)


See also: IR 05000293/1987039

Text

.

<o

March 24, 1988

<

Docket No.: 50 293

Mr. Ralph E. Bird

Senior Vice President - Nuclear

Boston Edison Company

800 Boylston Street

Boston, Massachusetts 02199

SUBJECT:

NRC REGION INSPECTION REPORT 87-39; RESOLUTION OF ITEM

A PAGE 4 PILGRIM NUCLEAR POWER STATION

REFERENCE:

TAC Number 66913

Ry letter dated December 8,1987 (RECo 87-196), you provided information

and evaluation to resolve Item A on page 4 of Region I Inspection Report

i

87-39, which pertains to an exemption granted from the requirements of

'

Appendix R to 10 CFR 50 to provide automatic suppression in the control room.

Approval of the exenotion was based, in part, on a 3-hour fire rating for the

ceilino/ floor assembly between the Cable Spreading Room (CSR) and the Control

Room (CR). We have completed our review of the submittal and find that

the present penetration seals are acceptable and that no upgradino is required.

Therefore, we consider this item and TAC number 66913 closed.

A copy of our Safety Evaluation is also enclosed.

.

Sincerely,

]

1

Daniel Mcdonald, Senior Project Manager

Project Directorate I-3

Division of Reactor Projects I/II

Enclosure

cc w/ enclosure

'

See next page,

DISTRIBUTION:

Docket File,' NRC & Local PDRs, PDI-3 r/f, RWessman, BBoger, MRushbrook,

'DMcDonald, 0GC, EJordan, JPartlow, Tech Branch, ACRS (10)

  • See previous concurrence

OFC :PDI-3

PDI-3 *
PDI-3 *
PDI-3/DIR * :

...__:.___...___..:......_____.:__....______.........____.._________...._______...._________

NAME :MRushbrook :GRequa

DMcDonald:ck:RWessman
:

.....:-___________:_____.._____:_....__...__:._______........____......________ ....__________.

DATE :3/ /88

3/24/88
3/24/88
3/24/88

0FFICIAL RECORD COPY

8803290403 880!M24

PDR

ADOCK 05000293

G

PDR

l

-

--

-~

-

.

.

_.

. _.

_ _ -

.

_

.- _ _

l

o

<.

Mr. Ralph G. Bird

Boston Edison Company

Pilgrim Nuclear Power Station

(

,

l

CC:

Mr. K. P. Roberts, Nuclear Operations

Boston Edison Company

Pilgrim Nuclear Power Station

ATTN:

Mr. Ralph G. Bird

Boston Edison Company

Senior Vice President - Nuclear

RFD #1, Rocky Hill Road

800 Boylston Street

Plymouth, Massachusetts 02S60

Boston, Massachusetts 02199

Resident Inspector's Office

Mr. Richard N. Swanson, Manager

U. S. Nuclear Regulatory Comission

Nuclear Engineering Department

Post Office Box 867

Boston Edison Company

Plymouth, Massachusetts 02360

25 Braintree Hill Park

Rraintree, Massachusetts 02184

Chairman, Board of Selectmen

11 Lincoln Street

Ms. Elaine D. Robinson

Plymouth, Massachusetts 02360

Nuclear Information Manaaer

Pilgrim Nuclear Power Station

Office of the Comissioner

RF0 dl, Rocky Hill Road

Massachusetts Department of

Plymouth, Massachusetts 02360

Environmental Quality Engineering

One Winter Street

Boston, Massachusetts 02108

Office of the Attorney General

1 Ashburton Place

20th Floor

Boston, Massachusetts 02108

Charles V. Berry

Secretary of Public Safety

Mr. Robert M. Hallisey, Director

Executive Office of Public Safety

Radiation Control Program

One Ashburton Place

Massachusetts Department of

Roston, Massachusetts 02108

Public Health

150 Tremont Street, 2nd Floor

Boston, Massachusetts 02111

Regional Administrator, Region I

U. S. Nuclear Regulatory Comission

631 Park Avenue

King of Prussia, Pennsylvania

19406

Mr. James D. Keyes

Regulatory Affairs and Programs Group

Leader

i

Boston Edison Company

j

25 Braintree Hill Park

.

Braintree, Massachusetts 02184

,

t-

.

.

_ _ _ _ _ _ _ -

.

__ _