ML20148H215

From kanterella
Jump to navigation Jump to search
Requests Removal of Region II from Distribution for Sys Drawings.Drawings No Longer Needed.Util Document Transmittal Form Encl
ML20148H215
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 01/20/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8801270167
Download: ML20148H215 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _

JAN 2 01988 Duke Power Company ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242

-Gentlemen:

SUBJECT:

DOCUMENT DISTRIBUTION Since we no longer have a need for copies of the System Drawings for the McGuire Nuclear Station, removal of the Nuclear Regulatory Commission, Region II Office in Atlanta, from you distribution is requested.

The distribution code on the Duke Power Company Document Transmittal Form is 2809.

This=information may expedite the removal process.

We appreciate your cooperation in sending the System Drawings to us over the years.

Sincerely, ORIGINAL SIGNED BY DOUGLAS M. COLLINS Douglas M. Collins, Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards

Enclosure:

Document Transmittal Form cc w/ encl:

T. L. McConnell, Station Manager bec w/ encl:

NRC Resident Inspector DRS Technical Assistant D. Hood, NRR Document Control Desk State of North Carolina RII RII RII tb 0

l CBanks TDe r

T ee les 1/jp/88 1/( 88 1//f/88 8801270167 880120 T

DR ADOCK 050 9

t\\ t m

  • ORM C1,190 p.7 87) gg g g7 gg g %

NORMAL plSPOSITION OF THE ORIGINAL PRIORITY trOCUMETT WILL SE T3 THE TRANSMITTAL SiONATURE UN-pg g 37 M 06 LESS RECIPIENT IS OTHERWISE IDENTIFIED SELOW.

DUKE POWER COMPANY

+

v1) 0765 A R HOLLINS - CMD NORTH oATE:

I?/7R/R7 62) 0546 F L TATUM/B YOUNG TODDVLE BG 1 DOCUMENT TRANSMITTAL FORM oOCUMENT TRANGnmTTAL e 7A ")50 (3) 1079 MC8UIRE NPB DOCUMENT CONTROL i4) 1690 TBSB-REL AY ENGR UD0DI AUN CTR

-si 4742 NEHRDAB BANDAD TECH IRNG CIR i6) 0429 GEN SERV CARD COM C3/31

@vEs O o an cogogging si) 4785 A L KINLEY ELEC

REFERENCE:

O vts Q

0521 ELEC F.ILE RM C3/60-8 + ORIG MCSUIRE NUCLEAR STATION OTHER ACIGe0WLEOSEMENT REQUIRED l i9) 1833 MCGUIRE NPD CARD CONTROL UNIT 1 w oA oR OTHER ACuMOWLEDGEMENT REQUSRfD. PLEASE NSM IMG-11880 NSM REV 500 AyC NOWLE

~

IPT SY RETURNING THIS FORM OR sc) 1833 MCGUIRE NPD CARD CONTROL use 1595 TDSD-SUB ENG UDLN CIR UORK ID 50835A732090 TASK B3020D ouuE POWER CoMPAssy l

21 4815 CRM-RECORDS CIP UBF-755 CF SYS BILL OF MAT, UIRE TAB, P

89 g

l 13) 3183 CHARLENE RIDDICK NPD UCl226 ELEM OUTLINE 1 CONN DIAG ome. s==

s.c a l

4482 D P VAUGHN-ESES EC271 DESI8N

SUMMARY

r$"c c3.

14 l 15) 2932 A U CALDUELL-TRAININ8 CTR Ch*'iosi.. m c. 2e242 1 61 3559 NUC TECH SERV UC23 n.co ey o.i.

l 87) 0462 L G ROBINSON UDODLAUNCTR 2NDFL PASE 1 0F 2

I la 2809 US NUC REG COMNISSION-C BANKS DOCUMENT NO.

D'N.

Z 1

2 3

4 5

6 7

8 9

10 11!12 13 14 15 16 17 18 TOTAL c g HCBM-1717-17.01-01 002 NE 004 12/28/87 MCED-03B F3 F2 FI VI Fl M0 JI F1 H3 H3 M0 M0 10 MCBM-1717-17.01-01 003 NE 000 12/28/87 i

l MCUT-1711-10.00-001 1

003 12/28/87 MCED-20 Y2 F2 VI M0 F1 M3 M0 MO 5

HCEE-145-06.00 NE 005 12/28/87 MCED-Il Y2 F2 H7 F2 M0 F1 M4 M0 M0 HI G1 M0 2U 16 HCEE-145-99.09 NE 000 12/28/87 i

MCEE-157-00.60 NE 001 12/28/97 l

MC -1717-17.01-01 NE 007 12/28/97 MCED-03A Y5 F2 HI F1 FI fl0 JI F1 M3 M0 F1 12 MC -1714-10.02 1

008,12/28/87 MCED-05A Y5 F2 FI FI M0 F1 M3 M0 Fl H2 12 NC -1717-17.01-02 NE 022 12/28/87 MC -1747-13.01 1

004 12/28/87 MC

.785-05.01 NE 013 12/28/87 MCED-14 Y5 F2 M0 JI FI M3 M0 8

NC -1785-09.02 1

010 12/28/87 NC -1789-01.05 NE 017 12/28/87 MCED-05A Y5 F2 F1 FI M0 F1 M3 M0 F1 H2 12 l MC -1789-02.01 NE 012 12/28/87 MCED-03A Y5 F2 H1 FI FI M0 JI Fl M3 M0 FI 12 t MC -1789-02.02 WE 010 12/28/87 g MC -1790-14.00 NE 024 12/28/87 MCED-14 15 F2 MO

.f t FI M3 MO 8

FORM 35247 NE MNSM-010 V4 le REMARKS.

AS BUILT REFERENCE LIMITED EDITION TRANSMITIAL B26249 UPDATED 10 REFLECT IMPLEMENTATION OF NSM MG-11880 REY. O I C MCMEEKIN IMPLEMENTATION DATE: 10-13-87 CHIEF ENGINEER LEG. ENHANCEMENTS PLANNED ELECTRICAL DIVISION BY D V H0kH_._ DVH/JDI/CSB/CBC__

. _ _