UNITED sT ATEs
[pm ** Guq'o
NUCLEAR REGULATORY COMMISSION
[O 'M
[
g., gf
REGION 11
o
5 .. ' e-Q ' S
101 M ARIE TT A sT R E ET. N.W.
ATLANTA, GEORotA 30303
- ,,e*
SEP 2 B B78
In Reply Refer To:
RII:ALC
5.0-364/78-13
Alabama Power Company
Attn:
Mr. A. R. Barton
Executive Vice President
Post Office Box 2641
Birmingham, Alabama
35291
Gentlemen:
This refers to the inspection conducted by Mr. A. L. Cunningham of this
office on August 22-25, 1978, of activities authorized by hTC Construction
Permit No. CPPR-86 for the Joseph M. Farley Unit 2 facility, and to the
discussion of our findings held with Mr. T. G. Arnold at the conclusion
of the inspection.
,
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
.
b
78111303B
-
- - . - _ _ - _
_ . . . . , _
_
,
.
.
.
..
.. _
- - - - - -
'
SEP % 5 IS78
Alabama Power Company.
-2-
Should you have any questions concerning this letter, we will be
glad to discuss thero with you.
Sincerely,
f
hYY
/I
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosure:
Inspection Report
No. 50-364/78-13
cc w/ encl:
Mr. R. E. Hollands, Jr., QA Supervisor
P. O. Box U
Ashford, Alabama 36312