ML20148E696
| ML20148E696 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/18/1988 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-86-49, CP-86-62, CP-86-67, CP-86-83, TXX-88123, NUDOCS 8801260089 | |
| Download: ML20148E696 (2) | |
Text
l A
muumummme MM
.7 Log # TXX-88123 L
=
File # 10110 r
r Ref. # 10CFR50.55(e) 1UELECTRIC January 18, 1988 w mi-c. counsa Executne hce Presdent U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 10CFR50.55(e) REPORTABLE ITEMS UNDER EVALUATION FOR CORRECTIVE ACTION Gentlemen:
Attached please find a list of deficiencies previously reported as reportable under the provisions of 10CFR50.55(e).
We are continuing our evaluation of the corrective actions for these issues and expect to submit our next report on each issue prior to April 15, 1988.
Very truly yours, W. G. Counsil JCH/grr Attachment c - Mr. R. D. Martin, Region IV l
Resident Inspectors, CPSES (3) l l
8801260089 880118 ADOCK0500g5 7
i DR
^'
400.%rth Oke Street iB 81 Dall.n. Tetas 73.41 t
Attachment to TXX-88123 January 18, 1988 Page 1 of 1 10CFR50.55(e) REPORTABLE ISSUES UNDER EVALUATION FOR CORRECTIVE ACTION SDAR Title Last Interim Report CP-86-49 Conax Adaptor Modules and TXX-6520 06-19-87 Electrical Penetrations CP-86-62 Polar Crane Support Structure TXX-6855 10-09-87 CP-86-67 Pre-0perational vibrational Test TXX-6874 10-21-87 Criteria CP-86-83 Separation Barrier Material on TXX-6918 11-06-87 Power Cables and Power Raceways