ML20148E696

From kanterella
Jump to navigation Jump to search
Deficiency Rept Forwarding List of 10CFR50.55(e) Reportable Items Under Evaluation for Corrective Action.Items Include Deficiency Repts CP-86-49,CP-86-62,CP-86-67 & CP-86-83.Next Rept Will Be Submitted Prior to 880415
ML20148E696
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/18/1988
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-49, CP-86-62, CP-86-67, CP-86-83, TXX-88123, NUDOCS 8801260089
Download: ML20148E696 (2)


Text

l A

muumummme MM

.7 Log # TXX-88123 L = File # 10110 r r Ref. # 10CFR50.55(e) 1UELECTRIC w mi- c. counsa January 18, 1988 Executne hce Presdent U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 10CFR50.55(e) REPORTABLE ITEMS UNDER EVALUATION FOR CORRECTIVE ACTION Gentlemen:

Attached please find a list of deficiencies previously reported as reportable under the provisions of 10CFR50.55(e). .

We are continuing our evaluation of the corrective actions for these issues and expect to submit our next report on each issue prior to April 15, 1988.

Very truly yours, W. G. Counsil JCH/grr Attachment c - Mr. R. D. Martin, Region IV l

Resident Inspectors, CPSES (3) l l

8801260089 880118 7 i DR ADOCK0500g5

^'

400.%rth Oke Street iB 81 Dall.n. Tetas 73.41 t

Attachment to TXX-88123 January 18, 1988 Page 1 of 1 10CFR50.55(e) REPORTABLE ISSUES UNDER EVALUATION FOR CORRECTIVE ACTION SDAR Title Last Interim Report CP-86-49 Conax Adaptor Modules and TXX-6520 06-19-87 Electrical Penetrations CP-86-62 Polar Crane Support Structure TXX-6855 10-09-87 CP-86-67 Pre-0perational vibrational Test TXX-6874 10-21-87 Criteria CP-86-83 Separation Barrier Material on TXX-6918 11-06-87 Power Cables and Power Raceways