TXX-6918, Interim Deficiency Rept CP-86-83 Re Use of Separation Barrier Matl on Power Cables & Power Raceways.Initially Reported on 870605.Effort to Define Const Schedule Will Be Continued.Next Rept Will Be Submitted No Later than 880118
| ML20236M951 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/06/1987 |
| From: | Counsil W, Woodlan D TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-86-83, TXX-6918, NUDOCS 8711130345 | |
| Download: ML20236M951 (1) | |
Text
'
)
i M
- Log # TXX-6918
,,-- ?
Fi1e #~10110
=
908.3 M#ELECTR/C Ref; #10CFR50.55(e)
November 6,1987 Milliam G. Coumil Emn,ne Vice PersiJm, '
O. S. Nuclear _ Regulatory Commission 4
Attn: Document Control Desk 1
Washington, D. C.
20555.
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION I
DOCKET N05. 50-445 AND 50-446 SEPARATION BARRIER MATERIAL ON POWER CABLES AND POWER RACEWAYS SDAR:
CP-86-83 (INTERIM REPORT)
Gentlemen:
E On June 5,1987, we notified you by our letter logged TXX-6840 of a deficiency l
involving the use of Separation Barrier Material' (SBM) on power cables and R
power raceways which we deemed reportable under the provisions of-10CFR50.55(e).
This is an interim report submitted to status corrective.
actions implemented to date. Our latest interim report was. logged TXX-6690, 1
dated August 28, 1987.
Our effort to define the construction schedule for this issue is continuing.
J We will submit the next report no later than January 18. 1988.
j very truly yours, l
i b
W.. G. ounsil l
By:
5GC D. R. Woodlan Supervisor, Dodket Licensings WJH:tgj c-Mr. R. D. Martin, Region IV-Resident Inspectors, CPSES (3) 8711130345 871106 PDR ADOCK 05000445 S
PDR 1
.j f r'
' JW Nonh Olive Street - LB 81 Dallas, Texad/555
'