Forwards Errata to Listed Project Status Repts.Errata Tab & Encls Should Be at End of Appropriate Procurement Status Rept.Aslb Will Be Notified of Transmittal by Separate Ltr from Attys
ML20148C860
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/17/1988
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TXX-88321, NUDOCS 8803230142
Download: ML20148C860 (11)


Text

__

1

==

EE log # TXX-88321 2

File # 10068

.r r

10010 clo 1UELECTRIC I,I,,'"jdl,",$,,,

March 17, 1988 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF PROJECT STATUS REPORT ERRATA Gentlemen:

Enclosed are fifteen (15) copies of the errata prepared for the following Project Status Reports:

Cable Tray and Cable Tray Hangers Conduit Supports Train C 2-inch Diameter and Less Conduit Supports Trains A and B and Train C larger than 2-inch Diameter Please place the Errata tab and enclosures at the end of the appropriate PSR.

The PSRs were previously transmitted via letter numbers; TXX 6930, dated 11/06/87 (Cable Tra.y), TXX-6948 dated 11/11/87 (Train C Conduit Supports) and TXX-6952 dated 11/18/87 (Train A & B and Train C > 2-inch Conduit. Supports).

The Atomic Safety and Licensing Board will be notified of this transmittal by a separate letter from our attorneys.

Very truly yours,

'/M W. G. Counsil JDS/mgt c - Mr. R. D. Martin - Region IV Resident luspectors, CPSES (3) 302-3 I((

?b?$Dobk$$0$$$as Do nh oine streer tasi vaitas. rexas 13:01 A

DCD

i Errata l

Cable Tray Hanger PSR PSR Pace Item /Line No.

Correction 5-18 32 Change "CPE-FVM-CS-001" to TABLE 5-2 All Occurrences "CPE-EB-FVM-CS-001" 6-1 6

A4-5 4.9 A20-2 4.1 A21-3 4.6 A33-3 4.1 A35-2 4.3 B1-2 4.1 B2-3 4.16 B4-2 4.1 5-18 33 Change "TE-FVM-CS-003" to TABLE 5-2 All Occurrences "CPE-EB-FVM-CS-003" 6-2 21 A4-5 4.16 A20-2 4.2 A21-4 4.7 A33-3 4.2 C*

A35-2 4.4 B1-2 4.2 B2-3 4.17 1

B4-2 4.2 5-22 26 Change "40" to "39" 5-22 28 Change "6 audits" to 5-24 22 "7 audits" 5-22 30 Change "12 t.udits" to "11 5-24 24 audits" 5-22 31 Change "13" to "12" 5-25 11 5-24 8

Change "have verified" to "verify" and "were" to "are" O

' i

-.~.

Errata O'

Cable Tray Hanger PSR PSR Pace Item /Line No.

Correction Table 5-3 TES-2 Change "January 31" to "March 4"

TCP-87-31 Delete entire reference 6-1 3

Change "Qualification" to Al-2 4.1 "Design Verification" A4-5 4.11

.A7-2 4.3 A10-4 4.15 A12-2 4.3 A14-4 4.7 A16-3 4.2 A21-4 4.17 A24-3 4.9 A35-2 4.10

[

B2-2 4.4 6-1 4

Change "Tray and Clip Al-2 4.2 Qualification" to "Design A25-2 4.1 Verif ication of Cable Trays A33-3 4.11 and Tray Clamps" A35-2 4.11 B1-2 4.3 B2-2 4.5 B7-2 4.2 6-2 19 Change "October 22, 1986" to A4-4 4.3 "April 30, 1987"

-A15-2 4.8 A20-3 4.13 A24-3 4.6 A33-3 4.7 A35-2 4.2 B1-2 4.8 B4-2 4.11 B7-2 4.7 i

O :

i

Errata

/ T Cable Tray Hanger PSR V

PSR Pace Item /Line No.

Correction 6-2 22 Change "Unit 2 Cable Tray A21-4 4.8 Selected Attributes A33-3 4.3 As-builting Program" to "Unit B2-3 4.1C 1 Spread Room Frame and Unit 2 B4-2 4.3 Cable Tray Selected Attributes As-builting Program" 6-2 26 Change "June" to "May" 6-2 30 Change "October 1986" to "February 1987" and "Rev.

1" to "Rev.

0" 6-3 31 Change "October 1986" to "May 1987" 6-3 33 Char ge "September 1980" to "1983 Edition" 6-3 45 Change "Revision 3, September 1978" to "Revision 2, February l

1976" 6-4 49 Change "February 19, 1987" to A4-5 4.15 "February 2, 1987" A20-2 4.4 A21-4 4.9 A35-2 4.5 B2-3 4.19 B4-2 4.4 6-5 68 Change "Verification" to "Validation" O t I

4 Errata

(.j Cable Tray Hanger PSR l

A8-3 4.10 Change "Multimode Response Multiplier - Studies" to "Multimode Response Multiplier at the Stress Level - Studies" and "April 10, 1986" to "April 4,

1986" A10-2 F

Change "Engineering studies (References 4.11, 4.12 and 4.16)" to "Engineering studies (References 4.8, 4.11, 4.12 and 4.16)"

A15-2 4.5 Change "September 30" to "October 9" A20-2 4.3 Change "Supplemental Procedure BS-2 4.2 for Unit 2 Walkdown - Selected B9-2 4.2 Cable Tray Attributes Data Collection Unit 2" to Unit 1

()

Spread Room Frame and Unit 2 Cable Tray Selected Attributes As-builting Program" A25-2 4.3 Change "November 11," to "October 31,"

A34-2 4.3 Change "1986" to "1987" A34-2 4.4 Change "Overlap Criteria in Piping" to "Dynamic Analysis of Piping Using the Structural Overlap Method" B6-2 4.2 Change "August 28" to "August 31" l

I '

l l

l

O Errata Conduit Supports Trains A and B and Train C Larger than 2-inch Diameter PSR PSR Pace Item /Line No.

Correction 5-16 22 Change "was verified" to "is verified" 5-12 42 Change "(Reference 25)" to TABLE 5-1, 8

"(Reference 46)"

page 1 6-2 25 Change "CPE-EB-FVM-CS-014" A30-2 4.4 to "TE-FVM-CS-014" 6-3 34 Change "June 10, 1987" to B4-2 4.2 "July 2, 1987" 63 New-46 Add:

CPE-EB-FVM-CG-014, "Design Control of Electrical Conduit Raceways for Unit 2 Installation in Unit 1 and Common Areas", Revision 5, dated July 13, 1987 A9-2 4.4 Change "1985" to "1986" 7

Errata Conduit Supports Train C 2-inch Diameter and Less PSR PSR Pace No.

Item /Line No.

Correction I

5-15 14 Change "17" to "15" 5-15 17 Change "7"

to "6"

5-16 20 5-15 19 Change "6" to "5"

5-17 4

5-16 12-13 Change "have verified" to "verify" and "were" to "are" O

Table 5-3 ATP-87-01B Delete entire reference 6-2 21 Change "0210-053, 055 and 057" to "0210-053, 055, 057 and 059" i

i i

4 l

t O,,

/~ )

Errata k./

Conduit Supports Train C m

2-inch Diameter and Less PSR PSR Pace No.

Item /Line No.

Correction 6-2 26 Change "CCL Test Report for Static and Cyclic Testing of Train C Conduit Support Components, Hilti Bolt Test and Unistrut P2543 Welded Foot Hanger Test" to "CCL Test Report for Static and Cyclic Testing of Train C Conduit Support Components for Comanche Peak Steam Electric Station (CPSES)"

6-3 29 Change "November 1985" to

.()

"February 1986" 6-3 34 Change "EC-9.04" to "ECE-9.04" Lnd "Post Construction Hardware Validation Program, July 1987" to "Control of Post Construction Hardware Validation Program Mar.ual, t

August 1987" l

t 0 ;

i