- s
.
MAR I 61988
- .
In' Reply Refer To:
Dockets:
50-498/88-08
50-499/88-08
'flouston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President, Nuclear
P.O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Mr. Nemen M. Terc of this of_fice
during the period January 25-28, 1988, of activities authorized by NRC
Operating License NPF-71 and Construction. Permit CPPR-129 for the South Texas
Project, Units 1 and 2, respectively, and to the discussion of our' findings
wi_th Mr. G. E. Vaughn and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included review of the operational status
of the emergency preparedness program. Within this area, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the NRC inspector. The
inspection findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements'.
Consequently, you are required to respond to
this violation, in writing,. in accordance with the provisions of Section.2.201
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
Six deficiencies which require a reply and schedule for corrective actions were
also identified during this inspection.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Act of 1980, PL 96-511.
D: DRPH
RIV:NMEP
C:NMEPB v
C:0 P
c1J15T/88
(L/3N88
}/g /88
) Q)1an
LJCa
NMTerc;1w
WLFisher
LCol table
-
/88
l'
%
t
8803230126 880316
ADOCK 05000498
g
.
.
.
.
Houston Lighting & Power Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Origina! Signed By:
L J. CALLAN
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-498/88-08
50-499/88-08
cc w/ enclosures:
Houston Lighting & Power Company
ATTN:
M. A. McBurnett, Manager
Operations Support Licensing
P. O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN:
Gerald E. Vaughn, Vice President
Nuclear Operations
P. O. Box 1700
Houston, Texas 77001
Houston Power & Lighting Company
ATTN:
S. L. Rosen
P. O. Box 289
Wadsworth, Texas 77483
Chief, Technological Hazards Branch
FEMA Region 6
Federal Center
800 North Loop 288
Denton, Texas 76201-3698
Central Power and Light Co.
R. L. Range /R. P. Verret
P. O. Box 2121
Corpas Christi, TX 78403
City Public Service Board
ATTN:
R. J. Costello/M. T. Hardt
P. O. Box 1771
San Antonio, TX 78296
i-
.
4
,
.
Houston Lighting & Power Company
-3-
cc:
(con't)
City of Austin Electric Utility
ATTN:
R. J. Miner, Chief Operating
Officer
721 Barton Springs Road
Texas Radiation Control Program Director
bec to DMB (IE35)
bcc distrib. by RIV:
- RRI-0PS
R. D. Martin, RA
- D. Hunnicutt
- Section Chief (DRP/D)
- RIV File
L. Shea, RM/ALF
- RSTS Operator
R. Bachmann, OGC
H. Bundy
- P. Kadambi, NRR Project Manager
- Project Inspector, RPB
- R. Hall
- Inspector (s)
R. L. Bangart
- W. L. Fisher
D. B. Matthews, NRR
NMEPB
- MIS System
- w/766
l
l
,
t